Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Environmental Geotechnics in Spoil Dump Design for Erosion Management - A Probabilistic ApproachBy J S. Kuszmaul, T O. Aspinall
The applicability of environmental geotechnics for erosion management is increasing in importance worldwide. The environmental impact of mining and evolving environmental legislation has been receivin
Jan 1, 1998
-
Mineral Deposit Profiles for Clays Associated with Volcanic Rocks in New ZealandBy A B. Christie
In Northland, Coromandel, Taupo and Canterbury, weathering and hydrothermal alteration of Cenozoic volcanic rocks has resulted in the formation of various types of clay deposits. Subtropical weatherin
Jan 1, 2007
-
Sampling Correctness ù A Comprehensive GuidelineReliable sampling practices are the key to optimising the market value of a mining or chemical companyÆs stock. As a result, reliable sampling standards are needed. However, current standards on sampl
Jan 1, 2005
-
New Limestone Grinding Plant at Risdon, TasmaniaA new plant for grinding limestone was built at the Risdon Works of the Electrolytic Zinc Company of Australasia Limited to meet increasing process demands expected to reach 150 tonne/day of ground
Jan 1, 1977
-
Design of Paste Backfill Plant and Distribution System for the Cannington ProjectSafety bulletins and stickers issued for the paste backfill plant at Cannington read as follows: æCannington Paste Fill Plant, First of ItÆs Kind in AustraliaÆ. We could even dare to state that the Ca
Jan 1, 1998
-
The Application of Oxygen Isotope Studies To The Occurrence Of Gold Mineralization In Estern AustraliaBy Wilson A. F
The use of stable isotopic measurements as a technique for elucidating the origin and history of the water in hydrothermal fluids is relatively new. Recent studies have emphasized the importance of
Jan 1, 1980
-
A Fluid Flow Modelling Approach to Gold Exploration in the Hodgkinson Province, Far North QueenslandBy S Corbel, P J. T Donchak, W Gorczyk
The Hodgkinson Province numerical modelling project aims to develop an improved understanding of the physical conditions that lead to the localisation of goldbearing fluids within known systems and ap
Jan 1, 2008
-
Red Dome Mine Closure - Addressing Mine Site Contamination Issues for Lease RelinquishmentBy S Logan, J Pu, J Milsom, G McDonald
Management of environmental issues is an integral part of the mine decommissioning process. In Queensland, miners must comply with environmental aspects of the Mineral Resources Act and Contaminated L
Jan 1, 1998
-
A Meso-Scale Column Test for Co-Mixed Tailings and Waste RockBy G Johnson, G W. Wilson
The settlement and drainage behaviour of co-mix, or mixtures of waste rock and tailings, are examined in a column study. Three co-mix profiles were observed for settlement, drainage, and pore water pr
Jan 1, 2003
-
Technology of Gold Recovery from Preg-Robbing OresBy M A. Vinokurova, V M. Mullov
Due to treatment of refractory carbonaceous low-grade gold ores a new technology providing improved precious metal recovery is required. For this reason, a technology including gravity, flotation, rec
Jan 1, 2007
-
Metallurgical Characterisation of George Fisher Ore Textures and Implications for Ore ProcessingBy Vink L, Johnson N. W, Mackenzie J, Young M. F, Johnston M, Landmark V
The influence of ore textures on metallurgical behaviour is poorly understood for most ores. An alternative method for characterising ore textures and for determining the resulting implications on o
Jan 1, 1998
-
Techno-Economic Evaluation of a New Early Removal Process to Treat High-Arsenic Copper OresTechno-Economic Evaluation of a New Early Removal Process to Treat High-Arsenic Copper Ores
Sep 13, 2010
-
Tunnelling in Unsolidified Water Bearing Sandstone-Construction of Tsugaru Tunnel (Futamata Construction Section)By Kaji S
The Tsugaru Tunnel, located on the Honshu island approach to the Seikan Tunnel, is 5,880 m long and has a "Shinkansen" cross section of 90 m2 area. The geological formation through which the tunne
Jan 1, 1987
-
The Los Pelambres Overland Conveyor Braking SystemBy N R. Johnson
The overland conveyor at the Los Pelambres mine in Chile is designed to move 8700 t/h of material over 12 km at a speed of 6 m/s while descending 1400 m. The conveyor, which is divided into three segm
Jan 1, 2005
-
Identification of Key Blocks for the Surface Excavations by using Stereographic ProjectionKey blocks occur on the surface of excavations and on the walls of the ornamental stones and limestone quarries due to the formation of joint planes, fissures, microfaults and quarrying operations.
Jan 1, 1989
-
Dynamic Simulators for Training Personnel in the Control of Grinding/Flotation SystemBy Herbst JA
During the last decade, it has been established that conventional mineral-processing control strategies based on classical control theory result in significant increases in plant throughput and operat
Jan 1, 1985
-
Segregation of Grained Material - Conditions and Possibilities of EvaluationSegregation of granular material is a very common phenomenon. Realised in a forced manner it is a basis of all separation processes in mineral processing, mainly classification and beneficiation. Sp
Jan 1, 1993
-
Development of a Dynamic Simulator for CIP / CIL Plant Optimisation and DesignBy Napier-Munn T. J, Morrison R. D, Moloney M. J, Corrans I. J
A dynamic simulator for CIP / CIL gold recovery plants has been developed at the Julius Kruttschnitt Mineral Research Centre within a collaborative, industrially - funded AMIRA project and with the
Jan 1, 1991
-
Gold Particle Characteristics in Narrow Vein Deposits - Implications for Evaluation and MetallurgyBy I M. Platten, Y Xie
Narrow vein gold mineralisation generally contains both fine (<100 ¦m) and coarse (>100 ¦m) gold particles. The in situ size and shape, deportment, distribution and abundance of the particles co
Jan 1, 2008
-
In-Seam Seismic Methods for the Prediction of Outburst in Coal Seams.By King D
Recent field experiments in the United Kingdom (Buchanan, 1979) have shown that the in-seam technique is capable of detecting a 1m fault in a 3m seam, at a range of 280m and with a resolution of ¦4
Jan 1, 1980