Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Porgera Gold Deposit, Papua New Guinea: The Influence of Structure and Tectonic Setting on Hydrothermal Fluid Flow and Mineralisation at a Convergent Plate Margin (16186b1d-6c25-4af8-9364-e7daeb6b3e56)

    The structure and tectonic setting has had a strong influence on gold mineralisation at the Porgera gold deposit. Here, the structural controls on the mineralisation at Porgera are discussed and plac

    Jan 1, 1995

  • AUSIMM
    The Practice of Porphyry Copper Deposit Estimation for Grade and Ore-Waste Tonnages Demonstrated by Several Case Studies

    By Dagbert M, Belisle J. M

    Several packages for the estimation of porphyry type deposits exist and produce acceptable results. Recently, however, the need for really trying to obtain maximum information from drill holes has

    Jan 1, 1977

  • AUSIMM
    Improvements in Stoping Practice at the Great Boulder Proprietary Gold Mines Limited (83210faa-2bb5-4191-b836-252ff6995107)

    By Holly J

    Mr. Champness: I wish to congratulate the authors on their paper, which covers a large variety of subjects. Not every mine is in the fortunate position to effect cost reductions by the sinking of a ne

    Jan 1, 1956

  • AUSIMM
    Fighting Mine Fires

    By Sneddon NW

    Aberdare North Colliery is situated on the eastern boundary of the City of Cessnock in the Hunter Valley, New South Wales. Although the area is now noted for its wines and vineyards, the district

    Jan 1, 1981

  • AUSIMM
    Impact of Entry Air Velocity on the Fire Hazard of Conveyor Belts

    By Dalzell R. W

    A Conveyor Belt Fire Test Program was initiated in 1985 by the Approval and Certification Center (A&CC), Mine Safety and Health Administration (MSHA), U.S. Department of Labor. The purpose was to

    Jan 1, 1988

  • AUSIMM
    Triassic to Early Cretaceous Tectonic Evolution of New Zealand Terranes: A Summary of Recent Data and An Integrated Model (97c64f36-733a-492e-986c-d34782b6a88f)

    Recent data contributions to New Zealand Mesozoic terrane geology confirm the consensus interpretation that New Zealand grew by the progressive addition of material by plutonic and accretionary proce

    Jan 1, 1995

  • AUSIMM
    Gold Mineralization of New Caledonia

    New Caledonia is a major metallogenic unit of the south-western Pacific Rim. Its mineral production is of world significance and it has an unusually well diversified mining history. New Caledonia&

    Jan 1, 1987

  • AUSIMM
    Expansion at Mt. Leyshon to Treat 2.0 MTPA Primary Ore

    The process selection and design aspects to treat primary ore in a new carbon-in-pulp (C.I.P.) plant while utilizing, where possible, existing equipment and infra- structure are discussed. The exis

    Jan 1, 1989

  • AUSIMM
    Evaluating and Controlling Geological Risk

    The paper first outlines the conceptual basis for evaluating and controlling geological risk. Geological risk, the economic reflection of the uncertainties associated with tonnage, grade, and other

    Jan 1, 1994

  • AUSIMM
    The Sydney Harbour Colliery, Balmain

    By Bahsford A

    The presence of coal in the Sydney area was confirmed in 1891 when Cremorne Bore No. I intersected cindered coal at 1 854 m. The decision to develop Sydney Harbour Colliery was based on the results

    Jan 1, 1988

  • AUSIMM
    Drillling Patterns and Ore Reserve Assessments

    By Watson D. F

    Armstrong's (1983) criticisms of PhiIip and Watson's (1982b) note on optimal drilling patterns are based on misinterpretation, supported by errors in geometry. Furthermore, Armstrong argues

    Jan 1, 1984

  • AUSIMM
    Upgrading Abel Mine Ventilation System - Case Study

    By A Lim

    "As Abel Mine continues to expand and increase production, the requirements of the ventilationsystem have also increased. This paper will outline the stages undertaken to increase the AbelMine ventila

    Jun 1, 2012

  • AUSIMM
    Mine Planning and Scheduling at Ranger Uranium Mine-Environmental Requirements and Economics

    Ranger Uranium Mines (RUM) operates an open cut located in the Top End of the North- ern Territory. Strict environmental controls govern all operations and the water management requirements have th

    Jan 1, 1984

  • AUSIMM
    The System of Costs Keeping at The Broken Hill Junction North Mine.

    By Ross R

    Although mining is an old industry its management is quite a new science, and its complications are now being recognised as demanding expert knowledge in many branches of technical and professional ed

    Jan 1, 1911

  • AUSIMM
    Frasers Underground - From Technical Study to Production

    Oceana Gold CorporationÆs (OGC) Frasers underground (FRUG) transitioned into production in early 2008. The mine uses a relatively unique yielding pillars mining method that takes its lessons from empi

    Jan 1, 2009

  • AUSIMM
    Australia and its Mining Industry: The Next Generation

    It is a great privilege to be invited to give this address at this centenary conference. A centenary is a time for recollection, for celebration and for looking ahead. The AusIMM has much to celebrate

    Jan 1, 1993

  • AUSIMM
    Degradation of Cyanide

    By Muir D

    A review of the various methods of degrad- ing cyanide either from gold processing liquors or electroplating baths is presented with some discussion on their relative merits or problems. Whilst alk

    Jan 1, 1987

  • AUSIMM
    Stress Field and Cenozoic Tectonics of North Vietnam

    By Tapponnier P

    In North Vietnam, large ductile shear zones are observed along the Red river fault and the Dienbien fault. Left-lateral sense of the Red river shear zone is related to the direction of shortening E-W.

    Jan 1, 1990

  • AUSIMM
    Optimisation of Copper Electrowinning at BHAS

    By Mark C. J

    Since the commissioning of the BHAS Copper Plant in 1984 the copper electrowinning operations have not fully met expectations. During 1988, a laboratory scale electrowinning unit was constructed to

    Jan 1, 1989

  • AUSIMM
    Gas Discharge Modelling of a Bottom Blown Slag Melt

    By Das A. K

    Investigations were carried out to understand the effect of liquid viscosity (u = 1 x 10-3 - 5 x 10-' Ns/m2) on the size of primary bubbles formed at high gas injection rates (Q = 100 - 1000 c

    Jan 1, 1987