Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Water balance management 101By M Rafty, C Lane
Managing water is a key aspect of mining, whether a site is in water surplus or water deficit. Water in tailings storage facilities (TSFs) needs to be managed carefully to maximise the density of the
Jul 23, 2018
-
Why I don’t believe in reconciliationBy S Dunham
For decades we’ve been focusing on reconciliation as a tool to validate mineral resource estimates. And for decades we’ve been misleading ourselves. The concept of reconciliation is simple. Predict, m
May 24, 2023
-
Mine productivity and equipment selection impacts with operational grade engineeringBy A F. von Wielligh, M Scott, L Keeney
Operational Grade Engineering (GE) is the early (pre-processing) discard of low-grade mineralised and/or barren rock to improve the ore grade and/or reduce deleterious elements within the run of mine
Nov 10, 2020
-
Pongkor Gold Mine (Indonesia) ù Changing From Traditional Handheld Cut and Fill to Mechanical Cut and FillThe Pongkor Gold Mine employs 678 staff. The mine is owned by the Indonesian state company PT Antam Tbk and is located 100 kilometres south west of Jakarta, in Java, Indonesia. Mine and infrastructure
Jan 1, 2002
-
A Solution to Grade Estimation in a High Nugget Environment ù The Bendigo ExperienceIn a ætypicalÆ gold deposit each tonne of ore will contain tens of millions of very fine gold particles, whereas; at Bendigo the majority of gold in each tonne of ore is present in just five to 15 ver
Jan 1, 2004
-
Flotation Process Control Optimisation at Prominent HillBy J Lombardi
OZ Minerals' Prominent Hill copper-gold concentrator is located 130 kilometres south east of the town of Coober Pedy in the Gawler Craton of South Australia. The concentrator was built in 2008 an
Aug 8, 2011
-
Dilution optimisation in sublevel open stoping operationsBy A Vakili
Dilution is associated with considerable direct and indirect costs in underground open stoping operations. As shown in previous works, an improved ability to predict dilution enables the economic risk
Mar 29, 2023
-
Stop investigating everything! How to classify events to maximise organisational learning and reduce systemic riskBy M Alston
Organisations’ incident classification processes are plagued by the overclassification of events, often leading to excessive workloads and suboptimal outcomes. This presentation addresses the pressing
Apr 16, 2024
-
Keeping Projects on the RailsBy J Canterford
Although we have access to a wide range of sophisticated process design and improvement tools in combination with a significant range of case studies, the mineral resource industry still manages to be
Aug 8, 2011
-
An Automated Analyser for Mine Geological Sample - Operational PerformanceBy Ryan A, Dennis R, Dekker D, Ellis W, Sowerby B
An automated facility for non-destructive elemental analysis of mine samples has been developed and tested at Mount Isa in association with the CSIRO. The analysis is based on the prompt and delayed m
Jan 1, 1993
-
Provision of a Gallery for Investigation of Coal Mine Explosions at Londonberry CentreThe explosion at Appin Colliery on July 24th, 1979, demonstrated the need for a large scale facility to simulate an underground type explosion and study its effects. The effects of an explosion can
Jan 1, 1981
-
The importance and abundance of lichens and mosses on the restored landscape in the nickel-copper city of Sudbury, Ontario, CanadaBy S Wainio, P J. Beckett, T Miller
Lichens are a symbiosis of fungi and algae. Air borne elements and gases are absorbed very efficiently over the entire surface of the lichen, because they have no protective structures such as a waxy
Aug 2, 2023
-
Women in Underground Mining in AustraliaIn the last few years it has become legal for women to work without restriction underground in some States in Australia. Since the mid 1970's there have been women graduates in mining enginee
Jan 1, 1988
-
Mapping Quartz, Carbonates and Riebeckite in Banded Iron Formation Iron Ore Drill Core Using CSIRO’s TIRHyLogging SystemBy M C. Schodlok
Banded iron-formation (BIF) and iron ores were measured using the CSIRO developed TIRHyLogger ™ to assess its ability to map quartz, carbonates and riebeckite. The TIR-HyLogger™ measures continuously
Jul 11, 2011
-
Modified ground support with alternative fill material for ground control at Munsar underground manganese mine of MOIL Limited, IndiaBy M Chaudhari, G Manekar, D Shome
MOIL Limited is operating 7 underground and 3 opencast mines in central India and producing annually more than 1.2 million tonnes of various grades of manganese ore. The underground mines are operatin
Nov 30, 2018
-
Life Cycle Assessment and Tailings Management Trade-Off Studies - An Approach to ImplementationTailings management trade-off studies are done for all mining projects. There is wide variability in these studies as their approach, details and outcomes are determined by the experience and focus of
Jan 1, 2009
-
Fire Behaviour in Buffel Grass Dominated Mine Site Rehabilitation in Central Queensland, AustraliaBy A Sturgess, P McKenna, P D. Erskine, D Doley, V C. Glenn
For more than four decades, rehabilitated lands in the Bowen Basin have been planted with buffel grass (Cenchrus Ciliaris), which is often used to provide rapid, stabilising and erosion reducing cover
Jun 28, 2016
-
Refining Metals with Sulphurecent work on decoppering lead is reviewed; CuS is formed rapidly even from dilute solutions of copper in lead. he mechanism of decoppering is discussed, and an explanation for the retention of metal
Jan 1, 1970
-
Removal of phosphorus and gangue minerals from iron ore by a combined approach of alkaline drying and reverse flotationBy A Batnasan, K Haga, A Shibayama, K Higuchi, H Takeuchi
High silica (SiO2), alumina (Al2O3), and phosphorus (P) contents in iron ore adversely affect the quality of iron products. The removal of those impurities from iron ore is an essential point in furth
Sep 18, 2023
-
Resource Estimation for the Aurukun Bauxite DepositBy C Grobler, M Recklies, G Jiang, I Taylor, M Morgan, G MacDonald, L Smith
The resource estimation of lateritic deposits, such as Aurukun, presents specific issues related to the lateral changes in thickness and elevation of the various horizontal layers (or zones) within th
Jan 1, 2009