Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Competing Factors in Support Selection for the West Zone of the Beaconsfield Gold Mine, Tasmania

    By P Fuller, A R. Penney

    Re-commencement of mining in the Western Zone of Beaconsfield Gold Mine following a seismically-induced rockfall fatality in April 2006 required a change of mining method involving drilling and blasti

    Jan 1, 2008

  • AUSIMM
    Through Seam Blasting – Leighton Wahana Experience

    By S Agdaca

    Leightons is the sole contractor at the Wahana Coal Mine Project (part of the Bayan Group), a multi-seam thermal deposit consisting of 13 coal seams with thicknesses ranging from 20 cm to 500&#16

    Nov 8, 2011

  • AUSIMM
    An Open Pit Multistage Mine Production Scheduling Model for Drilling, Blasting and Excavating Operations

    By S Q. Liu, E Kozan

    This paper proposes a new multiresource multistage scheduling problem for optimising the open pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is

    Nov 24, 2014

  • AUSIMM
    Developing Assessment Methods and Remediation Protocols for New Zealand Sites Impacted by Acid Mine Drainage

    By A Black, A de Jo, J Cavanagh, J Harding

    Acidic and metal-rich waters have been discharging from Sullivan Mine, West Coast, New Zealand since the closure of the mine during the early- 1990s. This has resulted in a decrease in pH from a backg

    Jan 1, 2003

  • AUSIMM
    A Simultaneous Optimisation Tool for Open Pit Mine Scheduling

    By Y Ren

    The algorithms employed by the commercial tools are either heuristic algorithm or iterative optimisation of a subsystem. This often results in a suboptimal schedule. In this paper, the author presents

    Sep 26, 2013

  • AUSIMM
    Resource and Reserve category inflation – known rewards, hidden risks

    By M Bond, R R. Hargreaves, G W. Booth

    There are numerous causes of speculative mineral resource and reserve inflation. Traditionally, these are linked to issues of data accuracy or misinterpretation, the use of overly optimistic estimatio

    May 24, 2023

  • AUSIMM
    Petrographic and Mineralogical Factors Affecting Gold Recovery at Macraes Flat, Eastern Otago, New Zealand

    By D Craw, P V. Angus

    Gold mineralisation at Macraes occurs as late quartz-carbonate veins within a body of sheared and hydrothermally altered Otago Schist, the Intrashear Schist. The alteration is characterised by the pre

    Jan 1, 1999

  • AUSIMM
    The Influence of Energy Policy and Security Energy Supply Policy of Indonesia to Asia-Pacific Coal Distribution in 2025

    By A P. Wibowo

    Indonesia holds a significant role in the utilisation of coal resources in the world. Although the number of Indonesian coal resources and reserves do not fall into the world’s top ten, according to 2

    Nov 22, 2011

  • AUSIMM
    Phosphorus association with goethite – effects of Fe(II)-catalysed recrystallisation

    By M I. Pownceby, N Karimian, A Frierdich

    These may be found with goethite through mechanisms including direct substitution or coprecipitation of nanocrystalline phases. Understanding P incorporation in goethite has significant implications f

    Sep 18, 2023

  • AUSIMM
    Blast Design Parameters and Their Impact on Rock Fragmentation

    By B Prasad, M P. Roy, P K. Singh, C Drebenstedt

    Blasting operations play a pivotal role in the overall economics of opencast mines. The blasting subsystem affects all the other associated subsystems, ie loading, transport, crushing and milling oper

    Aug 24, 2015

  • AUSIMM
    Implementation on stability of rock slope in abandoned quarry wall – Singapore case study

    By H A. Linn, K Winn, C W. Lee

    The Q-slope method for rock slope engineering was developed to enable engineering geologists and rock engineers to rapidly assess the stability of excavated rock slopes in the field and make optimal a

    Nov 29, 2022

  • AUSIMM
    Selection of Entrainment Control Processes in Copper Solvent Extraction Plants

    By K Dudley, D Readett

    The design of entrainment control processes in copper SX plants has been studied by use of models based on achievable plant performance. A number of alternatives have been assessed for their suitabili

    Jan 1, 2002

  • AUSIMM
    Experimental Study on Extinguishing Characteristics of Coal Fire in Confined Space

    By B Wu, B W. Lei, B J. Duan

    When a coalmine fire occurs, it is crucial to judge the developing trends inside the fire area by analysing the changes of gas concentration in order to formulate the proper rescue measures. At presen

    Aug 31, 2015

  • AUSIMM
    On the development of a viscosity model for molten multicomponent slag systems with several glass-forming, amphoteric and modifier oxides

    By G M. Zhomin, A S. Arkhipin, A Kondratiev

    Viscosity of multicomponent slags is one of the crucial physicochemical properties for many industrial processes and technologies. While the viscosity-temperature relationship of completely molten sla

    Aug 21, 2024

  • AUSIMM
    Analysis of dust behaviour in the face zone utilising- CFD modelling tools

    By O Joneydi, J Viljoen, R Funnell

    Computational Fluid Dynamics (CFD) modelling is a useful tool that can assist engineers in designing effective ventilation systems for the control of airborne dust generated during mining operations.

    Oct 12, 2022

  • AUSIMM
    Super-Scavenging of zinc Residue by the FASTFLOT Process at Pasmico Mining, Broken Hill

    By Fickera M. A, Marshall S, Burgeese F. L, Burgees J, Estrina H

    A new high intensity flotation process FASTFLOT was deployed to recover residual zinc from the zinc circuit tailings at Pasminco Mining's Concentrator, Broken Hill. Performance of the FASTFLOT

    Jan 1, 1995

  • AUSIMM
    Crafers Highway Tunnels, Adelaide, SA

    By G Brewster

    The Eagle on the Hill tunnels form part of an upgrade of Mt Barker Road, 15 km to the southeast of Adelaide. The upgrade significantly improves safety and reduces delays on this major road, which wind

    Jan 1, 1999

  • AUSIMM
    Limnological Processes in the Development of Acid Pit Lakes

    Limnological processes are often overlooked when trying to assess the long-term water quality of pit lakes. It is essential to deal with these aspects, since they determine the geochemical and redox c

    Jan 1, 2003

  • AUSIMM
    Slag-metal interfacial reactions in pyrometallurgical processing of industrial wastes for recovery of valuable metals

    By J H. Park, R R. Kim, H S. Park, H J. Kim

    This study focuses on the recovery of valuable metals, specifically silver (Ag) and palladium (Pd), from copper-containing sludge (with copper content less than 20 per cent) generated during PCB proce

    Jun 19, 2024

  • AUSIMM
    A new cut-off grade method to maximise resource utilisation of underground metalliferous mining operations

    By M Nehring, M Kizil, P Knights, A Mousavi, F Sotoudeh

    A cut-off grade is used to distinguish an economically viable block of ore from non-economical ones in mining operations. In order to obtain a high Net Present Value (NPV), a strategic and precise det

    Nov 10, 2020