Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Practical Optimisation of the Flotation Circuit at West Cliff Washery

    By Kazis JV

    The beneficiation of fine coal has been the major problem facing the coal preparation engineer in recent years. The influence of clay slime, particle size and reagent type are but a few of the many

    Jan 1, 1984

  • AUSIMM
    Grade Trends at the Elura Mine

    The Elura Orebody consists of a number of parallel, vertically oriented pipe-like structures of pyrite-sphalerite-galena mineralization located at the core of a structural dome. Concentric zoning of t

    Jan 1, 1990

  • AUSIMM
    The Anchor Mine Operation (52dfa9d7-8b17-4c08-b69e-95fca5390990)

    This paper reviews the development and operation of a small underground tin mine in NE Tasmania. Tin mineralisation was discovered in the Lottah area in the 1880's with early alluvial and eluvial

    Jan 1, 1990

  • AUSIMM
    Planning Cost Efficient Underground Ventilation Networks

    By Ruston R

    When coal mining first commenced in Australia, the principle objective was low cost production with development directed toward recovery of 'easy' coal. Future expans- ion of these early m

    Jan 1, 1983

  • AUSIMM
    Komatiite-Hosted Nickel Sulphide Deposits, Honeymoon Well, Western Australia

    By Woodhouse M, Drew GJ, Andrews DL

    The Honeymoon nickel sulphide deposits are located 45 km south of Wiluna in the 2.7 Ga old Agnew-Wiluna greenstone belt in the NE of the Yilgarn Craton (Figure 1). Both disseminated and massive nic

    Jan 1, 1996

  • AUSIMM
    Pyrrhotite - The Matrix of Nickel Sulphide Mineralization

    The economic significance of a fundamental understanding of the mineral pyrrhotite is dis- cussed. Particular emphasis is placed on the relationship of other sulphide minerals to the pyrrhotite whe

    Jan 1, 1972

  • AUSIMM
    Direct Reduction Technology - The Western Titanium Process for the Production of Synthetic Rutile, Ferutile, and Sponge Iron

    By Clements R. J, Davey J. M

    Development of the process from the pilot stage to the current operation of the Capel, W.A. plant is briefly described. The design criteria for a larger sized plant are discussed together with fact

    Jan 1, 1979

  • AUSIMM
    Improvement of Existing Ore-forming Models Due to Systematic Sampling During Mining – An Example from Kambalda, Western Australia

    By C Laming, S Staude, D Hammond, S Sheppard, J Griffith, S Stanfield, S Marriott

    Long Operations is located on the eastern slope of the Kambalda Dome in Western Australia. Kambalda hosts nickel deposits that are modelled to have formed from an exsolving sulfide melt from a parenta

    Aug 18, 2014

  • AUSIMM
    McArthur River Project

    Thank you chairman, good afternoon ladies and gentlemen. In my talk this afternoon I intend to cover a brief history, some of the recent experiences and an overview of the McArthur River project.If we

    Jan 1, 1993

  • AUSIMM
    The Paddington Gold Mine Project a Case Study

    In 1980 Pancontinental Mining Limited decided that while the Jabiluka uranium project was still a major focus of the company's efforts some diversification was necessary. At this time it was

    Jan 1, 1986

  • AUSIMM
    Mine Haul Roads Quantification and Structural Reliability of Haul Trucks

    By Marshall GA, Dickerson AW

    The efficient operation of large haul trucks in large open pit mines requires an economic trade off between the haul route quality, the haul truck payloads and the level of haul truck reliability.

    Jan 1, 1982

  • AUSIMM
    Long hole plug – addressing the hazard of bogged rods in ‘upholes’

    By G Noonan, S Thomas, M Limbert

    Stuck drill rods (often referred to as bogged rods) in production ‘upholes’ are a common problem in the underground mining industry. Bogged and broken off drill rods have the potential to fall out of

    Oct 16, 2017

  • AUSIMM
    Factors Affecting Ground Support Performance in Mining

    By Dugan K. J

    Mine operators are currently in a situation where market forces are acting to reduce profit margins and at the same time, regulatory bodies are insisting on improved mine safety and stability. This me

    Jan 1, 1992

  • AUSIMM
    Kinetics of Impurity Removal from Steel for a Batch Process

    By Wright G. A

    The objective of refining in steelmaking is to reduce the concentration of impurity atoms, e.g. sulphur, phosphorus, from an initially high level to a specified low concentration. A two-film theory

    Jan 1, 1980

  • AUSIMM
    Power Generation Utilising Mines Gas

    By Callinan AN

    Broken Hill Proprietary Company Limited have recently commissioned a 14 Megawatt power station adjacent to its underground coal mining operation at Appin NSW. The power station is fuelled by metha

    Jan 1, 1987

  • AUSIMM
    Geology, Grade Control and Reconciliation at the Douglas Mineral Sands Deposit

    The Douglas mineral sands deposit is located 75 km north of Hamilton in western Victoria, Australia. The deposit was discovered in the late 1990s by Basin Minerals Limited and purchased by Iluka Resou

    Jan 1, 2009

  • AUSIMM
    Effect of Explosive Type on Fines Generation in Blasting

    By Beattie T. A

    The ability of explosives to fragment rock has been assessed in small scale trials at the Granite Rock quarry, Baimsdale, Victoria. Three 65 mm diameter holes were fired simultaneously in a five metr

    Jan 1, 1990

  • AUSIMM
    Ore Concentrating Practice at North Broken Hill Limited, Broken Hill, N.S.W.

    By Wilkins L. G

    Ore recovered by North Broken Hill Limited as a result of mining operations at its Broken Hill leases is obtained, at the present scale of working, in the proportions of 80% from the North mine and 20

    Jan 1, 1940

  • AUSIMM
    A Study of the Composition, Microstructure, and Softening Characteristics of Some Zinc-Lead Sinters

    By Shoobridge PH

    Operating difficulties during 1977 with the Imperial Smelting Furnace operated by Sulphide Corporation Pty. Limited at their Cockle Creek zinc-lead smelter were found to be caused by premature so

    Jan 1, 1978

  • AUSIMM
    Key Operating Parameter Comparison Ciurug Mine Design at Pongkor Gold Mine -- Java-Indonesia

    Pongkor Gold Mines is one of seven units of production owned by PT Aneka Tambang (State owned mining company). The mine is located in the western part of Java Island, Indonesia. It is in the Bogor Dis

    Jan 1, 1997