Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Overcoming the Challenges of Managing Tailings from Iron Ore Mining in Western Australia

    By D R. Anstey

    The growing demand for iron ore from Western Australia has led to an increased focus on the development of magnetite and lower grade iron ore deposits. The need to process and beneficiate the ore from

    Jul 11, 2011

  • AUSIMM
    Lead-Smelting Practice at the Port Pirie Works of the Broken Hill Associated Smelters Pty. Ltd.

    By Hughes J. C

    THE smelting plant consists of five large furnaces operating in the treatment of current flintered material, and one small furnace operating periodically in the treatment of copper dross and antimonia

    Jan 1, 1922

  • AUSIMM
    Reflectance Spectroscopy with X-ray Fluorescence for Rapid Online Assaying in a Copper-nickel Flotation Plant

    By A Rantala, J Timperi and J Kaartinen, T Maksimainen, O Haavisto

    "X-ray fluorescence (XRF) is the most common technique used for online slurry assaying in base metal flotation applications. Typically, assays from feed, concentrate and tailings slurries are used to

    Oct 10, 2016

  • AUSIMM
    Learnings from review of drawpoint management across New South Wales mines

    By X Hill

    Throughout the 2016/2017 financial year, the NSW Resources Regulator conducted an assessment of each underground metalliferous operation across the state to assess how each operation managed the princ

    Oct 16, 2017

  • AUSIMM
    Specification and Selection of Hand-held Gas Monitors (Detectors) for Underground Mines

    By D J. Brake

    There are many sources of gas in underground mines including development and production blasting, strata gases, spontaneous combustion, diesel equipment, chemicals used for a wide range of functions,

    Aug 31, 2015

  • AUSIMM
    Making Design and Construction Work

    By S Porter

    The Melbourne City Link Project is a privately funded road infrastructure project linking three significant existing freeways in the vicinity of the Central Business District. The State Government, th

    Jan 1, 1999

  • AUSIMM
    Activities of components in Ca2SiO4-Ca3P2O8 solid solution at 1573 K

    By K Saito, M Hasegawa

    In steelmaking processes, it is known that P2O5 in dephosphorisation slags often exists in solid solutions between Ca2SiO4 and Ca3P2O8, <C2S-C3P>SS, and thus the solid solutions play an important role

    Aug 21, 2024

  • AUSIMM
    Large Event Sequence Analysis and 3D Velocity Models for Seismic Event Location Accuracy

    By D S. Collins, Z Hosseini, I Pinnock, Y Toya

    Microseismic monitoring is regularly used in the mining and geotechnical industries to provide detailed information about rock mass response to operational activities. This paper implements a variable

    May 9, 2016

  • AUSIMM
    A Case for Revision of Time-Honoured Mine Ventilation Design Parameters through Active Field Observations

    By B Belle

    "Mines around the world are inherently and operationally diverse. Current methodologies for the design of mine ventilation and cooling infrastructure involve controlling major safety and health hazard

    Jun 1, 2012

  • AUSIMM
    Geology – The Affirmative Case

    By D Kepert

    It is the role of the exploration geologist to create wealth through the discovery, delineation and characterisation of economic mineralisation. This requires a critical depth of geological understand

    Jul 13, 2015

  • AUSIMM
    Notes on Ore Dressing Practive at North Broken Hill Limited

    CONTENTSIntroduction.Ore Bodies.Variations in Ore Dressing Practices.Stage I .Gravity Concentration for the production of a Lead Concentrate. 1909-1918.Stage Il Gravity plus Flotation Treatment for th

    Jan 1, 1948

  • AUSIMM
    The North Strathfield Rail Underpass – Driven Tunnel Design and Construction

    By E Nye and T Schroeter, B Muir, M Kitson, M Gonzalez, D Mares

    The single track North Strathfield Rail Underpass (NSRU) consists of a dive structure either end of a 148 m long driven tunnel skewed under three live railway tracks. The tunnel is 8 m high, 9 m wide,

    Sep 17, 2014

  • AUSIMM
    Contract Considerations and Other Critical Ventilation Aspects in Achieving a New Mine Ramp Up

    By B Broad

    "Establishing ventilation in the early stages of a new mine is an essential step to achieve scheduled outcomes that ultimately drive the financial success of an operation. If the primary ventilation i

    Jul 1, 2013

  • AUSIMM
    Maximising asset value through optimal block by block decisions on marginal material

    By F Phillips, E Deucker, J Kato

    It is challenging to determine the optimal mining strategy to maximise value when a mine plan includes mineralised material which does not meet the full cost of mining but has value exceeding the vari

    Mar 15, 2021

  • AUSIMM
    Work-Life Balance and Atypical Working Hours: Does FIFO Pass the Epicurean Test for Happiness?

    When I was first asked to give a paper on work-life balance in the mining industry I was both excited and aware of the incongruity of my position. I have never worked in mining operations nor have I h

    Jan 1, 2005

  • AUSIMM
    The Design and Performance of Underground Explosion Barriers ù A Review

    By T O&apos, Beirne

    The paper focuses on explosibility conditions in underground coal mines, the behaviour of explosions from initiating gas ignitions to violent dust explosions and the effectiveness and limits of operat

    Jan 1, 1997

  • AUSIMM
    Research on supporting technology for production level roadways of block caving in Pulang Copper Mine

    By X Feng, X Zhang, W Sun, Y Zhe, K Hou, B Zhao, H Liu

    Pulang Copper Mine, being China&#39;s largest newly built mine using block caving, boasts an annual production capacity of 12.5 million tons. Production level and roadway stability hold the key to the

    Nov 30, 2018

  • AUSIMM
    Mine Wastes as Cover Materials in a Water-shedding Soil Cover in North-West Queensland

    By T Baumgartl, C Gonzales, A Soliman, M Edraki

    A soil cover isolates potentially acid-forming (PAF) mine wastes from atmospheric interaction and thereby mitigates acid mine drainage. As a cover that comprises either a single layer or a composite b

    Jul 16, 2014

  • AUSIMM
    Evolution in Panel Caving Undercutting and Drawbell Excavation, El Teniente Mine

    By P Yß±ez, G Ferguson

    The El Teniente mine produces more than 340 000 tonnes of fine copper per year from an industrial complex of underground mine, concentrator and smelter. Mass caving methods are employed to deliver app

    Jan 1, 2000

  • AUSIMM
    Mine Shafts – Planning, Optimising and Constructing

    By D J. Kilkenny

    Work practices involved in shaft construction can be aligned with current industry standard operating practices. However, the working environment during conventional shaft construction introduces uniq

    Mar 21, 2011