Search Documents

  • NIOSH
    RI 8714 Lime-Sinter Processing of Anorthosite for the Recovery of Alumina

    By V. E. Edlund

    As part of a research program for recovering alumina from domestic nonbauxitic resources, the Bureau of Mines investigated a lime-sinter, caustic leach technology for anorthosite. This report discusse

    Jan 1, 1982

  • NIOSH
    OFR-107-78 In-Situ Determination Of Bulk Electric Properties Of Coal

    By David C. Chang

    A survey of in-situ methods for determining bulk electric properties of coal is given. Largely because of the strong dependence of coals properties on operating frequency, different sensing methods ha

    Jan 1, 1977

  • SAIMM
    The impact of junior miners on the global supply of high-purity manganese sulfate monohydrate for the electric vehicle battery market

    By B. I. Matshediso, J. Kaavera, E. Shemang, T. K. Dintwe, L. S. Teseletso, K. Fichani

    The minerals sector continues to draw attention from policy makers who would want to see both old and new mineral projects add value to the minerals in the host country. The current technological deve

    May 27, 2025

  • CIM
    Rabbit Lake project – environmental impact

    By R. L. J. Phillips

    "The environmental impact of the Rabbit Lake project is presented. Baseline data for fish, water, air and radon collected in 1973, 1975, 1980and 1986, are compared with post-development environmental

    Jan 1, 1989

  • SME
    Investigations On Recovery Of Hematite From Two Different Banded Iron Ores By Flotation

    By B. Das

    Hematite floatability from two low grade banded iron ores of India, namely banded hematite quartzite (BHQ) and banded hematite jasper (BHJ) using fatty acids and amine as the collectors is investigate

    Feb 27, 2013

  • AUSIMM
    Case Study Assessing Alternative Data Collection Techniques and Analysis Methods to Assist with Geotechnical Slope Design

    By C Bellia, A Maldonado, S Strong, H Baxter

    This paper discusses the technical and cost benefits of alternative data collection techniques used to collect lithological information, obtain laboratory testing samples and perform in situ testing.

    Jul 13, 2015

  • SME
    A Valid Approach to Equipment Productivity and Reliability Benchmarking

    By R. Adsero

    The volume of data produced by operating mines has increased substantially over the last 10 years. However, the volume of data and analytical capability has been negatively correlated to equipment pr

    Feb 23, 2014

  • NIOSH
    RI 3133 Sand-And-Gravel Safety Contest Of 1930

    By W. W. Adams

    Lower accident rates were the outstanding feature. of the second annual sand and gravel safety competition conducted in 1930 by the United States Bureau of Mines in cooperation with the National Sand

    Jan 1, 1931

  • AUSIMM
    Real-Time Risk Analysis and Hazard Management

    Safety remains a critical priority for the Australian mineral resource industry and will receive increased focus in the future. This is particularly evident in underground coal mines where reserves ar

    Jan 1, 2005

  • AUSIMM
    Project and execution of the excavation for a haulage shaft with raise boring techniques

    By M Orunesu Preiata

    The Odysseus Project is part of the high-grade Cosmos Nickel Complex that lies 30 km north of Leinster. The Odysseus definitive feasibility study (DFS) was approved by the Western Areas’ board in Octo

    Mar 29, 2023

  • IMPC
    Improving Mine and Metallurgical Performance Using: Data Unification and Measurement Management

    By Osvaldo A. Bascur, J. Pat Kennedy

    "The profitability of mining and metallurgical operations continues to lag behind that of other industries despite the technical advances that have occurred in recent years. A primary reason for poor

    Jan 1, 2003

  • NIOSH
    IC 6949 Shaft- And Slope-Bottom Lay-Outs At Coal Mines - Introduction

    By Robert L. Anderson

    A shaft or slope bottom is that portion of a mine that is contiguous to the bottom of the main hoisting shaft or slope. It includes the terminal tracks for loaded-and empty-car storage, locomotive run

    Jan 1, 1937

  • CIM
    Evaluation of liner capacity for blast damage mitigation

    By J. F. Archibald

    A research effort has been undertaken, under Workplace Safety and Insurance Board of Ontario (WSIB) sponsorship, to characterize the support capabilities of conventional and innovative spray-on lining

    Jan 1, 2004

  • CIM
    Increasing Sag Mill Capacity at the Copper Mountain Mine through the Addition of a Pre-Crushing Circuit

    By Dave Rose, David G. Meadows, Mike Westendorf

    "Copper Mountain’s concentrator was commissioned in May 2011. The circuit consists of a 34’ x 20’ EGL SAG mill, a Raptor 900 pebble crusher and two 24’ x 39’6” ball mills. Each mill is equipped with a

    Jan 1, 2016

  • DFI
    Lateral Pressure Relief by Geotextile Encased Columns (GECs) at Piled Bridge Abutments: Two Case Studies

    By Sven Schröer, Lilma Schimmel, Dimiter Alexiew

    "The Geotextile Encased Columns (GEC) deep foundation system for embankments on soft soils was introduced some 20 years ago and is now considered State-of-the-art worldwide.The GECs consist of compact

    Jan 1, 2016

  • NIOSH
    RI 5225 Fundamental Flashback, Blowoff, And Yellow-Tip Limits Of Fuel Gas-Air Mixtures ? Introduction And Summary

    By Joseph Grumer

    About a century ago Bunsen and his associates invented the famous burner that bears his name and was to become the ancestor of today's gas appliances. Over the years, Bunsen's invention beca

    Jan 1, 1956

  • NIOSH
    IC 6120 Geophysical Abstracts - No. 1 - 1 - Gravitational Methods - Wireless Control Of Coincidence Outfit For Relative Gravity Measurements

    By Berger

    A detailed description is given of radio apparatus for controlling a coincidence outfit for relative gravity measurements. This is probably of little interest, since many types of apparatus could be u

    Jan 1, 1929

  • AUSIMM
    Features of the New Lead Refinery at Port Pirie

    A new lead refinery with a capacity of 230,000 tons per year commenced operation at Port Pirie in October, 1959. This plant superseded the refinery which had operated from 1933 with the advent of the

    Jan 1, 1963

  • AIME
    Gun and Howitzer Production Club

    By W. P. Barba

    IN THE early summer of 1917, it became evident that the then existing sources of supply of guns and gun forgings were totally inadequate for the enormous and rapidly growing requirements of the Ordnan

    Jan 1, 1920

  • NIOSH
    RI 9009 - Geotechnology In Slate Quarry Operations

    By Noel N. Moebs

    This report summarizes a Bureau of Mines study on the use of geotechnology to identify and reduce ground control hazards at slate quarry operations in eastern Pennsylvania. The major ground control ha

    Jan 1, 1986