Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Geotechnical Planning Basis for the Optimization of Workings

    By Nikolaos Polysos

    Besides considering the given geomechanical conditions, the geological/geotechnical logging of drill cores and heading faces during the driving of parallel entries and the resulting rock classificatio

    Jan 1, 2003

  • SME-ICGCM
    Study of Ground Movement Over a Longwall Mine

    By A. W. Khair

    This paper presents an analysis of ground movements recorded from longwall operations in the Northern Appalachian region in West Virginia. The site chosen for the investigation was selected due to var

    Jan 1, 1987

  • SME-ICGCM
    Design Considerations For Angle Bolters

    By Charles D. Albright

    FMC built its first angle bolter in 1969. This was a single mast unit which could drill holes for conventional bolts or angle holes for installing roof trusses. From this drill we learned very quickie

    Jan 1, 1982

  • SME-ICGCM
    Optimization Of Bench Blast Design With The Aid Of Computer (febe1846-7d11-4969-9dc5-f8d6a8a628b1)

    By Wei Wu

    A new bench blast design method and its realization with the assistance of the computer is introduced. The basic design principle is to define a rhomb cell, called fully-fractured zone, through a seri

    Jan 1, 1992

  • SME-ICGCM
    Non-Destructive Testing on Fully Grouted Rockbolts

    By Dieter Wittenberg

    The use of thc ultrasound technique for monitoring rockbolt support has at last provided support engineers with a measunng system capable of pinpointing fracture failuns in fully-grouted rockbolts. Th

    Jan 1, 2001

  • SME-ICGCM
    Successful Application Of Hydraulic Fracturing To Control Windblast Hazard At Moonee Colliery, NSW, Australia

    By Ken Mills

    This paper describes the first successful use of hydraulic fracturing to induce caving events "on demand" in Australia. Moonee Colliery operate a longwall immediately below a thick conglomerate strata

    Jan 1, 2000

  • SME-ICGCM
    High Capacity Tensioned Cable Bolts For Tailgate Support

    By Stephen C. Tadolini

    A joint research program was designed and conducted at Lodestar Energy?s Baker Mine to investigate the performance of a high-capacity tensioned cable supported gateroad. The secondary system consisted

    Jan 1, 2000

  • SME-ICGCM
    Performance and Safety Considerations of Hydraulic Support Systems (eb62774d-dbca-420f-b228-950711bafbce)

    By Thomas Barczak

    Hydraulic cylinders are used in several roof support systems, such as longwall shields and mobile roof supports, to provide critical ground control Many state-of-the-art hydraulic support system opera

    Jan 1, 1998

  • SME-ICGCM
    Stability Mapping System

    By Quanxi Wang

    This paper presents a new stability mapping system which tightly integrates structural and geologic mapping with geo- mechanical stress analysis for use in support design and mine plan- ning. The stru

    Jan 1, 2005

  • SME-ICGCM
    Use Of Polymer Grids For Longwall Shield Recovery

    By Brian E. Travis

    The recent development of polymer grids for the underground coal mining industry has created new alternatives for supplemental ground control practices. The grids utilize strong, lightweight polymers

    Jan 1, 1990

  • SME-ICGCM
    New Approach to Evaluate the Stability of Yield Pillars

    By Khaled Morsy

    In this paper a new method to evaluate the stability of yield pillars was introduced. The evaluation of yield pillar stability was conducted in three steps: (1) Estimation of pillar loading - numerica

    Jan 1, 2003

  • SME-ICGCM
    An Examination Of Energy Calculations Applied To Coal Bump Prediction

    By Keith A. Heasley

    Pillar recovery in deep coal mines with competent roof and floor can concentrate stresses and generate hazardous bumps. Actual calculation of the geologic strain energy released in association with th

    Jan 1, 1990

  • SME-ICGCM
    Geotechnical Mine Design Of The Foidel Creek Mine

    By H. N. Maleki

    The results of five years of geotechnical investigations are presented to develop productive and stable longwall layouts for the Foidel Creek Mine. The program was initiated during the pre-mining stag

    Jan 1, 1988

  • SME-ICGCM
    Behavioral Aspects of Roof/Rib Injuries--Implications for Training Utilizing Stereoscopic Photography

    By Edward A. Barrett

    A significant number of injuries resulting from fa118 of roof and rib may be avoided by modifying the reactive behavior of miners as they encounter potentially hazardous ground conditions. In 1984-85,

    Jan 1, 1986

  • SME-ICGCM
    Method Of Selecting Suitable Types Of Powered Supports At Longwall Faces

    By S. M. Hsiung

    A model (support selection model) for the selection of suitable types of powered supports under various geological conditions is proposed. This model is developed by evaluating the support, performanc

    Jan 1, 1988

  • SME-ICGCM
    Influence of a Coal Mine Subsidence on An Adjacent Dam

    By Nengxiong Xu

    The WTZ coal mine is located adjacent to an auxiliary dam in P. R. China. The mining-induced ground movements are calculated using a 3-D numerical procedure based on the finite difference method (FDM)

    Jan 1, 2013

  • SME-ICGCM
    lnterpanel Barriers for Deep Western U.S. Longwall Mining

    By Leo Gilbride

    Western U.S. longwall operators face increasing challenges with optimizing ground control and productivity as mines reach greater depths and coal bursting hazards increase. Some western U.S. mines, ma

    Jan 1, 2004

  • SME-ICGCM
    Integrating Ground Control And Mine Site Data Through A Geographic Information System

    By Douglas C. Peters

    Part of the ground control research at the U.S. Bureau of Mines is involved with improving ground control data collection and analysis methods. A geographic information system (GIs) is being used with

    Jan 1, 1990

  • SME-ICGCM
    Subsurface Fracture Development Due To Longwall Mining And Its Interpretation Using Image Processing Techniques (736b40e1-a21a-40c0-a678-75088df69d02)

    By Gexin Sun

    This paper presents the physical modelling results of subsurface fracture development associated with longwall mining operations and an application of image processing techniques to interpretion of th

    Jan 1, 1992

  • SME-ICGCM
    Assessment Of Wood And Alternative Materials For Supplemental Roof Support Construction

    By Thomas M. Barczak

    The engineering of a support system is driven largely by economics. The goal is to provide effective support at minimal cost. For this reason, wood has been extensively used as a support material for

    Jan 1, 1994