Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Study of the Behavior for Backfilling Material in Room-and-Pillar Coal MiningBy Joao Felipe Costa, Jair C. Koppe, Andre Zingano, Cleber Gomes
"Run-of-mine Brazilian coal has high ash content and low calorific power. Therefore, the coal must be washed to achieve the power plant specifications for burning coal. A large amount of waste results
Jan 1, 2010
-
Highwall Mining of Thick, Steeply Dipping Coal: A Case Study in Geotechnical Design and Recovery OptimizationBy David P. Conover, Jake Bain, Christopher M. Ross
"Highwall mining of thick (up to 100 ft) steeply dipping (20° or more) coal seams provides many challenges, both geotechnically and operationally because seam dips near or in excess of highwall mining
Jan 1, 2017
-
Crosshole Seismics: Applications In MiningBy Richard E. Thill
Two Cross-borehole systems were developed by the Bureau of Mines, one operating at a central frequency of 20 kHz for close-in spacing between boreholes (2-20m) and another operating at a dominant freq
Jan 1, 1989
-
"Void Fill Techniques for Stabilizing Roof Conditions during LongwallShield Recovery"By Rusty Mchenry, Craig Dickerson, Robin L. Oldham
"It has been proven that longwall faces can be moved safely and efficiently. However, abutment pressures and poor ground control conditions can halt operations and be hazardous to coal miners. Recentl
Jan 1, 2015
-
Effect of Vertical Discontinuities on Roof Stability and Ground Control Challenge: A Case StudyBy Li Yang, Andre Cezar Zingano, Alberto Fronza
"Immediate roof control is very important to the security and stability of entries in coal mining. It is also the highest cost in the coal mining operation, and roof spalling is directly responsible f
Jan 1, 2017
-
Chemical Consolidation For Roadway Surrounding Rock - It's Theory And ApplicationsBy Jinhua Wang
Based on engineering examples and theoretical analysis, the mechanism of chemical consolidation for fractured roadway surrounding rock was discussed. The chemical consolidating materials and three con
Jan 1, 1996
-
Variation of Horizontal Stresses and Strains in Mines in Bedded Deposits in the Eastern and Midwestern United States (18e10a78-83b8-48d9-ab61-d01619f77fb4)By Dennis Dolinar
In general, the direction of the maximum horizontal stress in the eastern United States is fairly well defined. However, the variation of the magnitudes of the horizontal stresses is not very well und
Jan 1, 2003
-
An Alternative for More Productive Rib Bolting in Underground Mining ApplicationsBy Joe E. Bryan, John P. McDonnell
"Underground mine rib stability is an ongoing safety issue in all mining applications. Rib-related accidents present at least as many problems as roof-related ground control. Underground coal mine rib
Jan 1, 2015
-
Time Dependent Mining Induced Subsidence Measured by Differential Interferometric Synthetic Aperture RadarBy Jessica M. Wempen
Differential Interferometric Synthetic Aperture Radar (DInSAR), a satellite-based remote sensing technique, has been demonstrated as a potentially practical method for measuring mining induced surface
Jan 1, 2014
-
Geotechnical Considerations for Concurrent Pillar Recovery in Close Distance Multiple SeamsBy Peter Zhang
"Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground-fall fatalities in the underground coal mines of the United States. The risk of ground fa
Jan 1, 2017
-
Ground Control Practice at Leeville Underground MineBy Changshou Sun
The geotechnical properties of mining zones at Leeville Underground mine (or simply called Leeville mine through this paper) are different from one zone to another. The typical ground condition is poo
Jan 1, 2013
-
Mechanism and Prevention Measure of Rib Spalling in 6.5 Meter High Caving Face in Thick Coal Seam with Undulated FloorBy Weidong Pan, Yinchao Yang, Baodong Zuo
Fully mechanized mining technology, with a large cutting height in thick coal seam, has been developed to be large-scale, mechanized, and intelligent. Furthermore, it is also superior to other mining
Jan 1, 2017
-
Numerical Analysis of the Effect of Coal Seam Characteristics on the Longwall Top Coal CavabilityBy Rudrajit Mitra, Tien Dung Le, Chengguo Zhang, Bruce Hebblewhite, Joung Oh
"Geomechanical and geotechnical characteristics of coal seam are important parameters that directly affect the cavability of top coal in the longwall top-coal caving (LTCC) method. The impact of these
Jan 1, 2017
-
Development of Road Header Roof Bolting ModuleBy Sean C. Farrell
In underground mining and tunneling, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Australian companies WDS Limited and Cram Fluid P
Jan 1, 2014
-
Coal Rib Response during Bench Mining: A Case StudyBy Morgan M. Sears, Mark Van Dyke, Gamal Rashed, John Rusnak, Khaled Mohamed
"In 2016, room-and-pillar mining provided nearly 40% of underground coal production in the United States. Over the past decade, rib falls have resulted in 12 fatalities, representing 28% of the ground
Jan 1, 2017
-
Tekcrete Fast®: Fiber-Reinforced, Rapid-Setting Sprayed Concrete for Rib and Surface ControlBy Stephen C. Tadolini, Minova USA Inc., Peter S. Mills, David R. Burkhard
"Fiber-reinforced spayed concrete has been used for several years in civil and tunneling operations. Research conducted to reduce cure times and increase compressive and flexural strengths resulted in
Jan 1, 2017
-
Modeling the Effect of Bolts on the Behavior of Rock Pillars and Associated Insights on Rib ReinforcementBy Gabriel Walton, Sankhaneel Sinha
"Rib failures are a major hazard in underground mining. When pillars are subjected to loading, extensile cracks are generated parallel to the excavation boundary, which can manifest as rib falls. A co
Jan 1, 2017
-
Evaluation of Rock Excavation Technologies for Seismically Active MinesBy S. Paul Singh
"The long-term viability of seismically active and/or deep mining operations hinges upon the industry's ability to maintain profitability in a climate of increasingly difficult conditions, escalating
Jan 1, 2010
-
Development and Implementation of the “Spin to Stall” Resin Bolting System at Anglo Americans Australian Underground Coal OperationsBy Ismet Canbulat, John Naylor, Jason Emery, Peter Craig, Andy Sykes
"Longwall mining is by far the most common method of underground coal extraction in Australia. The industry trends and expectations are placing increasing emphasis on the reliability and productivity
Jan 1, 2015
-
Status Of Longwall Research In CSIROBy Michael Kelly
Current research in longwall mining in CSIRO Exploration & Mining is focused within five major projects and several minor projects. The major projects are: 1 3D Aspects of Longwall Geomechanics. Th
Jan 1, 2001