Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Macassa Number Three Shaft Deep Shaft Sinking By Conventional Methods

    By W. M. Shaver, W. R. Dengler, F. A. Edwards

    INTRODUCTION The Macassa Division of Lac Minerals Ltd. is a high grade gold mine that has been operating in Kirkland Lake, Ontario for the past 51 years. It produces approximately 120,000 tonnes of

    Jan 1, 1985

  • SME
    Intelligent Cable Shovel Excavation In Surface Mining

    By S. Frimpong

    The cable shovel excavator is used for primary production in many surface mining operations. A major problem in shovel excavation is the variability of material diggability, resulting in varying mech

    Jan 1, 2003

  • SME
    Advances In Autogenous And Semiautogenous Grinding

    By Vladimir G. Kochnev

    Crushing and grinding account for the major portion (60 to 80 percent) of the overall expenses for ore processing. Autogenous (AG) and semiautogenous grinding (SAG) have been considered a step forward

    Jan 1, 2008

  • SME
    Ani-Metprotech Stirred Vertical Mills For Ultra Fine Grinding- Case Studies In Gold, Nickel And Lime Slaking

    By K. S. Liddell

    Ultra fine grinding is becoming increasingly used in the mining industry over recent years. The development of large-scale units for high volume grinding of low value materials and concentrates has op

    Jan 1, 2001

  • SME
    Reducing The Fire Hazard Of Mine Conveyor Belts

    By Harry C. Verakis

    A conveyor belt fire presents a serious safety hazard in an underground coal mine. A review of underground coal mine fires involving conveyor belts which occurred within the past two decades was made

    Jan 1, 1991

  • SME
    EPB Tunnelling Through Cohesionless Saturated Ground Under Very Shallow Cover?Perth New Metrorail City Project

    By Hiroshi Yamazaki

    The paper describes prediction, control and validation of face pressures, and special TBM features for the bored tunnels of the New Metro Rail City Project, Perth, Australia. The selected EPB-TBM pass

  • SME
    Pilot-Scale Testing Of Novel Fine Particle Dewatering Aids

    By M. K. Eryadin, I. Yildirim, R. Asmatulu

    Novel dewatering aids were tested on various coal samples from the U.S. and Canada in laboratory and pilot-scale filtration experiments. The reagents substantially improved the dewatering kinetics and

    Jan 1, 2003

  • SME
    Assessment Of Stable And Failed Pillars In Underground Limestone Mines

    Pillars in underground limestone mines are required to support the overburden and provide a safe, stable working environment for mining personnel and equipment. Pillar stability was assessed by the Na

    Jan 1, 2008

  • SME
    Case Histories of Rehabilitation of French Railway Tunnels

    By Verya Nasri

    This paper presents analysis of damages and rehabilitation design for three major French rail-way tunnels built in mid-19th century. The La Nerthe tunnel underwent ovalization deformation with excessi

    Jan 1, 2008

  • SME
    Exploration Review (0aa637d4-de3b-49fc-9275-003815a21e5a)

    By D. R. Wilburn

    This summary of international mineral exploration activities for 2008 draws upon available information from industry sources, published literature and U.S. Geological Survey (USGS) specialists. The s

    Jan 1, 2009

  • SME
    Waterproofing: Key to SCL tunnel lining design

    The global tunneling industry has many challenges, both technically and financially, with the latter likely to be a significant feature over the next few years. Many industries have ad-opted standard

    Jan 1, 2010

  • SME
    The Stormwater Management and Road Tunnel (SMART), KualaLumpur, Malaysia—A Unique Use of Tunnel Space for both Traffic and Flood Water

    By Christopher J. Bambridge, Lee Seng Hoor

    The Stormwater Management and Road Tunnel (SMART) Tunnel is a world first in the use of tunnel space transmitting both road and water through the same spatial envelope. The unique aspect of the SMART

    Jan 1, 2005

  • SME
    Isothermal Reduction Kinetics and Mechanism of Pre-oxidized Ilmenite Mining, Metallurgy and Exploration

    By Mingyang Li, Yan Lv, Xiaolong Ma, Xudong Gao, Jie Zhao, Yingyi Zhang

    The reduction process of pre-oxidized ilmenite concentrate powder in 30%CO–70%N2 atmosphere was characterized by thermogravimetric and differential thermogravimetric (TG-DTG) analysis system at the te

  • SME
    Isothermal Reduction Kinetics and Mechanism of Pre-oxidized Ilmenite Mining, Metallurgy and Exploration (9bd09701-4fce-4153-aadd-0723612382a9)

    By Mingyang Li, Yan Lv, Xiaolong Ma, Xudong Gao, Jie Zhao, Yingyi Zhang

    The reduction process of pre-oxidized ilmenite concentrate powder in 30%CO–70%N2 atmosphere was characterized by thermogravimetric and differential thermogravimetric (TG-DTG) analysis system at the te

  • SME
    Borehole Hoisting For Shaft Sinking And Development At Brunswick Mining And Smelting Corporation Limited, Bathurst, New Brunswick

    By W. R. Dengler, R. S. Brown

    In 1974, Brunswick Mining and Smelting Corporation Limited started a 48 million dollar expansion programme at their property in Bathurst, New Brunswick. A portion of the expansion plans includes a 26

    Jan 1, 1976

  • SME
    Seismic Design Measures for the Retrofit of the Claremont Tunnel

    By Bill Cain, David F. Tsztoo, R. John Caulfield, D. Scott Kieffer

    In 1994, the East Bay Municipal Utility District (EBMUD) commenced a system-wide Seismic Improvement Program to protect their facilities from catastrophic damage. A primary focus of this program has b

    Jan 1, 2005

  • SME
    Can human rights contribute to sustainability?

    By L. Lipsett

    "Human rights can contribute to sustainability in the mining sector, both in theory and in practice. Both human rights and sustainability share a common concern to improve economic prosperity, environ

    Jan 1, 2011

  • SME
    Modification Of Limestone-Based Material For Increased Efficiency Of Arsenic Removal From Water

    By A. D. Davis

    Limestone-based material shows great promise for removal of arsenic from water. In laboratory tests, it has removed more than 95% or arsenic and more than 99% of cadmium and lead. In addition, the w

    Jan 1, 2012

  • SME
    Challenges Of Conveyors In Tunneling

    By Marco Sonnenschein

    As time is costly, engineering companies have developed methods, procedures and mechanical equipment to tunnel faster. But the best excavation method will not be able to cope with the time pressure if

    Jan 1, 2012

  • SME
    BWARI Tunneling Underway

    By Thomas L. Richardson, David R. Chapman, Gary W. Gilbert

    The two contracts of the Big Walnut Augmentation/Rickenbacker Interceptor(BWARI) sewer project for the City of Columbus, Ohio total nearly 35,000 feet of 14and 12-foot diameter tunnel. EPB TBMs will i

    Jan 1, 2005