    U. S. Coal Producers Have Reason to Take Heart

    By Steve Kral

    For an industry that provides more than half of the nation’s energy needs, the U.S. coal industry still attracts negative publicity. However, the nation’s energy appetite continues to increase. And

    Jan 1, 2002

  • SME
    Role Of Gas Pressure In Underground Coal Mine Bursts And Bump

    Face and pillar bursts, bumps and bounces are violent failures that occur in underground coal mines in response to a complicated interplay of face and pillar geometry, seam depth, coal properties and

    Feb 27, 2013

  • SME
    Geotechnical Considerations for the Final Design of the Detroit Upper Rouge Tunnel CSO Project

    By Jean Habimana

    The Detroit Upper Rouge Tunnel CSO Control Project will capture and store up to 201 MG of combined sewer overflow from 28 outfalls in Detroit, Dearborn Heights and Redford Township during wet-weather

    Jan 1, 2008

  • SME
    Ecosystem Restoration Within The Anchor Hill Pit Lake, Gilt Edge Mine Superfund Site, South Dakota

    By J. Jonas, J. M. Harrington, K. Wangerud, S. D. Fundingsland, J. G. Harrington

    EPA NRMRL Mine Waste Technology Program and Region VIII Superfund office are jointly conducting an in-situ technology demonstration at the Anchor Hill Pit Lake, Gilt Edge Mine Superfund site. The goal

    Jan 1, 2004

  • SME
    Computer Modeling For Improved Production Of Mechanical Excavators

    By L. Ozdemir, M. Cigla

    This paper presents and discusses some of the computer models developed and currently used at the Earth Mechanics Institute (EMI) of the Colorado School of Mines (CSM). These include the performance m

    Jan 1, 2000

  • SME
    Austrian Method Of Tunnel Building In Very Heavily Squeezing Ground In Mountainous Terrain Theory And Practice

    By Horst Pöchhacker

    The largest structure along the Tauern highway section between Salzburg and Villach is the 6.4-km-long Tauern Tunnel. The major geotechnical problems that came up surprisingly while driving the headin

    Jan 1, 1976

  • SME
    Current usage of continuous monitoring systems in coal mines discussed

    By Kevin G. Stricklin

    Introduction Continuous monitoring techniques have been used in the US and abroad for many years. A continuous miner has a monitor that measures methane and automatically gives a warning if the metha

    Jan 9, 1987

  • SME
    World?s Largest TBM Keeps Niagara Project On Track

    By Doug Harding

    The Niagara Tunnel Project (NTP) is a 10.4-km- (6.5- mile-) long, 14.4-m (47.5-ft) bored tunnel that will run under the city of Niagara Falls from the Upper Niagara River to the Sir Adam Beck power st

    Jan 1, 2008

  • SME
    Closure Planning To Comply With The International Cyanide Code

    By D. H. Garcia

    The mining industry responded to public concerns about use of cyanide by developing a voluntary certification to allow companies to demonstrate their commitment. The International Cyanide Code (Code)

    Jan 1, 2010

  • SME
    Industrial Minerals 1986 - Diatomite - Dimension stone - Dolomite

    By G. Coombs, L. Meade, J. Welshimer

    Industrial Minerals commodity profiles are continued from May's Annual Review issue. Diatomite G. Coombs, Manville Sales Corp. Growth in US diatomite production continued to lag in 1986.

    Jan 6, 1987

  • SME
    Strong dollar and imports steal momentum from US mining recovery

    By J. D. Morgan

    Demand for nonfuel minerals depends on the overall state of the economy, which steadily improved each quarter in 1984. New housing starts rose to 1.8 million units. Automakers turned out about 15% mor

    Jan 5, 1985

  • SME
    Record Performance Of TBM In The 13.5 Km Amlach Tunnel, Austria

    By Hans Janzon, Ernst Buechi

    INTRODUCTION The headrace tunnel in Amlach is part of a hydro electric power scheme near the city of Lienz in south west Austria. The project is owned and developed by Tiroler Wasserkraftwerke AG,

    Jan 1, 1987

  • SME
    Continuous Improvement And Teamwork Are The Keys To Success At Phoenix Mine

    By Scott Ellenbecker

    The formation in Newmont Mining?s Phoenix Mine near Battle Mountain, NV contains high levels of abrasive quartzite as well as gold, copper and silver. Newmont started mining operations at Phoenix (for

    Jan 1, 2009

  • SME
    Job Site Security: Risk Management beyond Gates, Guards and Guns

    By Eric Jacobs

    "Building and operating tunnels has been a highstakes endeavor in terms of costs, complexity, safety and impact on contractors, owners and the public for a long time. There are many variables that nee

    Jun 1, 2019

  • SME
    Engineering And Construction Of The Goldstrike Roaster Facility

    By B. Burke, R. Colquhoun, K. Thomas, R. Walton, D. Fentie

    The new Roasting Facility at Barrick’s Goldstrike Mine in Nevada, U.S.A. was developed to process 12,000 tons per day of refractory gold ore. The process consists of crushing, dry grinding, roasting,

    Jan 1, 2001

  • SME
    Ambitious Endeavors in Mechanized Shaft Construction: A Case History of Two Mine Shaft Projects in Australia

    By John Zeni

    In Australia during the 1990s, Zeni Drilling took on several demanding shaft boring contracts. This paper describes the safety, operational, technical and environmental advantages derived through the

    Jan 1, 2001

  • SME
    Design And Construction Challenges Of Hard Rock TBMS At The Gotthard Base Tunnel

    By Michael Rehbock-Sander

    The Gotthard Base Tunnel (GBT) is 57 km (35 miles) long and consists of two par-allel single-track tubes with an ex-cavation diameter ranging from 8.8 to 9.5 m (28.8 to 31.2 ft). These are interlinked

    Jan 1, 2012

  • SME
    A New Packed Column Flotation System

    By David C. Yang

    A packed column (or static tube) flotation system is an innovative technology which utilizes a controlled dispersion reagent scheme and a new machine. The unique aspect of the machine is its packed-be

    Jan 1, 1988

  • SME
    Numerical Analysis of Time-Dependent Creep Behaviour of Tunnel Support Systems

    By R. Chen

    Most tunnels built in Sydney encounter similar ground situations; they penetrate either the Hawkesbury Sandstone or the shales that lie beneath the city. Tunnels in these materials are generally sup-p

    Jan 1, 2008

  • SME
    New Developments In Ground Support Technology For Open-Type Tunnel Boring Machines

    By Steve Chorley

    Open-type, or main beam, tunnel boring machines (TBMs) can achieve impressive rates of production. This type of TBM typically outperforms other types of TBMs currently in use around the world. In good

    Jan 1, 2011