Crisis Management: What To Do If Disaster StrikesBy Joseph J. Zaluski, J. Steven Gardner, Marco M. Rajkovich
The telephone rings at 3:20 a.m. An exasperated voice on the other end says, “There has been a mine explosion at Mine No. 5 and we have not heard from three units of men.” Twenty-three minutes later
Jan 1, 2004
-
A Thermodynamic and Environmental Assessment of Lanthanide Chloride Production from BastnaesiteBy A. Nivala, S. Ulgiati, M. Canino
Mining and processing of bastnaesite ore, (Ln)CO3F, for lanthanides extraction is investigated in this paper. This series of elements proved to be applicable for a wide range of high-tech uses. In spi
Jan 1, 2005
-
Evaluation of deep-seated crib block fire tests (7bc9e718-229c-42f8-a8a2-7a3b0ae77860)By M. A. Trevits
The National Institute for Occupational Safety and Health (NIOSH), in partnership with the Mine Safety and Health Administration (MSHA), is conducting research to test, evaluate, improve or modify coa
Jan 1, 2009
-
Alternative Contracting MethodsBy John Reilly
Traditional methods of project procurement of have remained virtually unchanged in the U.S. infrastructure construction industry for more than 50 years. The traditional method, Design-Bid-Build (DBB),
Jan 1, 2007
-
Wetting Phenomena In Oil Sand Systems And Their Impact On The Water-Based Bitumen Extraction ProcessBy J. Drelich
The highly-efficient and economically-feasible technology for bitumen recovery from US oil sands using a water extraction approach was developed at the end of the last century. This water-based bitume
Jan 1, 2007
-
Ocean Bottom Tap Point Lepreau Cooling Water Tunnels New BrunswickBy Fred Breu, Ronald E. Heuer
INTRODUCTION The Point Lepreau nuclear generating station was constructed in the late 1970's and early 1980's by the New Brunswick Electric Power Commission. Point Lepreau is a small peni
Jan 1, 1985
-
The Role of Gas Hydrate in a Global Gas MarketBy M. D. Max, A. H. Johnson
INTRODUCTION Gas hydrates have considerable potential to be a major energy resource owing to their apparent abundance in Arctic regions and along continental margins throughout the world (Kvenvolden,
Jan 1, 2006
-
Discussion - Commercialization of eastern US oil shales — a review - Technical Papers, MINING ENGINEERING, Vol. 97, No. 12, December 1985, pp. 1381-1385By V. Rajaram
R.K. Leininger, N.R. Hasenmueller, and D.D. Carr The content of the paper by V. Rajaram does not fulfill the expectations of the title. But Rajaram submitted the article in October 1983, and he cou
Jan 10, 1986
-
Carburization Effects On Pig Iron Nugget MakingBy B. Anameric, S. K. Kawatra, K. B. Rundman
The iron nugget process is an economical, environmentally friendly, cokeless, single-step pig iron making process. Residence time dependent process requirements for production of pig iron nuggets at a
Jan 1, 2005
-
Benefits of a Good Quality Assurance Program to an Electric UtilityBy W. J. Mahoney
A good quality assurance program at a coal mine or power plant is accurate, timely and consistent. The quality analysis is accurate due to a complete sampling of the coal stream loaded into the unit t
Jan 1, 1994
-
Analysis Of Us Small-Mine Compliance Feasibility With Proposed New Respirable Dust Standards And Implications For Better Dust Control MethodsBy R. L. Grayson
In 2010, MSHA began holding hearings on a new coal mine respirable dust rule, which proposes a 1.0 mg/m3 standard, a separate 0.1 mg/m3 quartz standard, and the use of single-shift samples for complia
Jan 1, 2012
-
Batu Hijau: From Discovery to ProductionBy Thomas J. DeMull
Development of the Batu Hijau copper project was completed in the fourth quarter of 1999 with the formal handover and start-up of ore processing facilities. The project began in August 1996 when the
Jan 1, 2002
-
Cut And Fill Narrow Vein Mining At HollisterNarrow vein mining, with enough challenge and also where the cutting edge technology can be applied, is still a very important and exciting portion of the mining industry. Based on the deposit charact
Jan 1, 2012
-
Construction Of Shin-Kanmon Tunnel On Sanyo ShinkansenBy Kazuo Magata, Hirohiko Fujita, Masazumi Tashiro, Yoshiaki Sato, Yoshio Shinoda
The Shinkansen of the Japanese National Railways (JNR) presently in operation between Tokyo and Hakata, approximately 1,000 km, was constructed at three stages: between Tokyo and Shin-Osaka opening in
Jan 1, 1976
-
Earth Pressure Balanced Shield Machine To Cope With BouldersBy Shigeru Nishitake
The Earth Pressure Balanced (EPB) shields designed by Mitsubishi Heavy Industries, Ltd., are recently more enthusiastically accepted by tunnel boring specialists. This company having built 1,000 tunne
Jan 1, 1987
-
Bottom Stability of Shafts with Cohesive Soil Plugs Overlying an Artesian AquiferBy Steven W. Hunt, Safdar A. Gill
Design and construction of temporary shafts for underground facilities often require evaluation of bottom stability due to rupture (blow-ins) caused by water pressure acting on a bottom plug. This pa
Jan 1, 1997
-
Underground Mine Ramp Design for Beginners - SME Annual Meeting 2024By William G. Pariseau
Safety of mine ramps begins with an analysis of stress that almost certainly must be done numerically to take into account ramp geometry, route geology, rock properties, and pre-ramp stresses. The pop
Feb 1, 2024
-
Development of Steel-Fiber Reinforced High Fluidity Concrete Segment and Application to ConstructionBy Aki Fujii, Hiroshi Dobashi, Mitsuro Matsuda, Yoshinari Kondo
INTRODUCTION The Metropolitan Expressway Central Circular Route with a total length of approximately 47 km is located outside the Inner Circular Route of Tokyo (at a radius of approximately 8 km f
Jan 1, 2007
-
Acid Base Accounting: Low-Level Data Comparison Of Net Carbonate Value Versus Modified Sobek Procedures As Described By The State Of NevadaBy T. Patten
Inter-Mountain Labs, IML, performed a study comparing mining waste rock sample analysis by Net Carbonate Value (NCV) and Modified Sobek acid-base accounting procedures. The study looked at 468 waste r
Feb 27, 2013
-
Evaluating Ground Conditions Ahead of a TBM Using Probe Drill DataBy Steven K. Duke, Jay Arabshahi
An economic, real-time probe drill monitoring system was developed for Metropolitan Water District’s Arrowhead Tunnels project to quantitatively evaluate ground conditions ahead of a TBM. This system
Jan 1, 2007