Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Mining, EPA, and toxic waste : Will your mining company be liable?By Peter Haller
Introduction The impact of the Comprehensive Environmental Response, Compensation, and Liability Act, or Superfund, as well as the Resource Conservation and Recovery Act (RCRA) and their state counte
Jan 2, 1987
-
Ground Condition Mapping: A Case StudyBy H. Lawson
The Mine Safety and Health Administration (MSHA) issued Program Information Bulletin P09-03in April of 2008, providing formal guidance on using programs that model the redistribution of stress during
Jan 1, 2012
-
Class I Areas Impacts Analyses For A Proposed Expansion Of A Taconite Processing Facility In Northeast MinnesotaBy D. M. Wagner, G. Biggs, M. Osmundson, C. J. Twaroski
Potential air emission impacts to federal Class I areas from distant sources are receiving increasing scrutiny by federal land managers (FLMs). This paper provides summary results of the impact analy
Jan 1, 2001
-
Development of buffer station for safe and eco-friendly mining of seabed mineral resourcesBy Tae-kyeong Yeu, Jong-Choi, Cheon-Hong Min, Hyung-woo Kim, Jae- Won Oh, Sup Hong, Minuk Lee, Sung-Soon Kim, Chang-Ho Lee, Ki-Young Seong
"Collecting mineral resources from the seabed using a seafloor crawling robot is the firststep in the mining operation. The second-step is lifting the collected ore up to the water surface. For liftin
Sep 1, 2014
-
WMATA Use Of The New Austrian Tunneling Method For Lining And SupportBy Larry H. Heflin
The Washington Metropolitan Area Transit Authority's Wheaton Station and tunnel design was completed and offered for bid in the Spring of 1983. The format was unique to the Authority: a four part
Jan 1, 1985
-
Feasible Tunnel Construction Options For The Systems Conveyance And Operations Program Reach 3 TunnelBy S. H. Jason Choi
The Systems Conveyance and Operations Program (SCOP) is being implemented to convey tertiary-treated effluent to Lake Mead near Las Vegas, Nevada. The Reach 3 Tunnel Project is part of SCOP. The tunne
-
Comparing Simulated And Interpreted Geologic ModelsBy M. Rossi
Geologic ore controls are usually interpreted and modeled from cross sections and plans, as they are critical to construct meaningful and accurate ore reserves models. The geologic boundaries are oft
Jan 1, 2004
-
The Utilization Of Coarse Pre-Concentration Rejects In The Preparation Of Underground Backfills At Xstrata Nickel?s Ontario OperationsBy T. Weatherwax
As part of a strategic research initiative at UBC to design and evaluate integrated underground mining and mineral processing systems, work has been done to determine how to utilize the coarse rejects
Jan 1, 2008
-
Improvement of Working Conditions and Opinions of Mine Workers When Battery Electric Vehicles (BEVs) Are Used Instead of Diesel Machines — Results of Field Trial at the Kittilä Mine, FinlandBy A. Halim, J. Gustafsson, A. van Wageningen, J. Johansson, · J. Lööw, K. Kocsis
A major part of the European Union’s (EU) project Sustainable Intelligent Mining System (SIMS) is investigating the development of diesel-free/carbon–neutral underground mines in order to ensure susta
Oct 25, 2021
-
Upgrading Gasifier Slag – Preprint 97-69By M. S. Klima, V. Choudhry
Coal gasification solid residue (slag) contains unconverted carbon (char) which is considered an impurity for utilization applications of slag. Under this study, table concentration was used to proces
Feb 24, 1997
-
Turbocharged engines require special lubrication maintenanceBy Jerry T. Shelby
Surface and underground mining operations require equipment with high power output ratings. Haul trucks, loaders, dozers, and other equipment need increasing horse-power to meet production demands.
Jan 3, 1987
-
Five To Be Honored By National Mining Hall of FameThe National Mining Hall of Fame will induct five mining greats on Saturday, Sept. 17, 2005 at the Museum Convention Center in Leadville, CO. The 18thAnnual National Mining Museum and Hall of Fame In
Jan 1, 2005
-
Exploratory Analysis Of Morenci Concentrator System DataBy R. C. Troxell
Alternative methods of analyzing data acquired by the Morenci copper concentrator process control instrument-computer system are presented. Experimental measures of ore characteristics, for proposed f
Jan 1, 1979
-
Discussion - Lemniscate-guided powered roof supports adapted for proper operation with the roof on longwall faces (857baea3-2787-49de-993d-00b3908db795)By J. B. Gwiazda
S.S. Peng The highlights of this paper are : • The shield supports with lemniscate links will exert a tangential force on the roof strata, causing unnecessary and harmful roof movements, thus dama
Jan 12, 1986
-
Measurements At A State Of The Art 2 X 5 Mw Dual Pinion Mill DriveBy M. Rufli
Until not so long ago most ring geared mills were operated with fix speed motors only. By using the latest generation of medium voltage frequency converters, new possibilities have arisen to improve t
Jan 1, 2011
-
Technical Note - Borealis Project: A Fast-Track Approach to Mine DevelopmentBy W. E. Coughlin, R. L. Faverty, F. H. Lightner
Introduction The intent of this paper is to present the general strategy and method of implementation to achieve a "fast-track" mine development. The major objectives of a "fast-track" or rapid devel
Jan 11, 1983
-
Appalachian Operators Maintain Significant ProductionBy Henry A. Signore
The Appalachian coalfield, located in eastern Kentucky, Pennsylvania, Virginia and West Virginia, has been one of the most productive in the United States. Total production from the Appalachian coalfi
Jan 1, 1995
-
Development of the Design Build Philosophy—Tren Urbano to Second Avenue SubwayBy Chris Bennett, Drupad Desai, Kirit Mevawala
INTRODUCTION The design/build (D/B) philosophy of contract delivery is neither new nor unusual when it comes to at-grade, elevated or high-rise structures. But when it comes to constructing underg
Jan 1, 2005
-
Design, Testing, and Production of Steel Fiber Reinforced Concrete Segmental Tunnel Lining for the East Side Combined Sewer Overflow TunnelBy K. Wongaew, R. F. Cook, J. E. Carlson, T. Cleys, C. R. Smith
Steel fiber reinforced concrete segmental rings are the final tunnel lining for approximately 85% of the alignment for a 6.706-meter (22-foot) internal diameter tunnel being built as part of the East
Jan 1, 2007
-
Ground Freezing A Proven Technology In Mine Shaft SinkingBy Paul C. Schmall
The link between artificial ground freezing and the mining industry stretches back more than 140 years, and across an ocean. Patented by the German scientist F.H. Poetsch in 1863, the technique is re
Jan 1, 2007