Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Rock Engineering Method To Pre-Evaluate Old, Small Coal Pillars For Secondary Mining ? SynopsisBy J. N. Van der Merwe
Due to the approaching depletion of reserves in the Witbank Coalfield, and the fact that the Waterberg Coalfield is as yet under developed, there is increasing pressure to extend the lives of the oper
Jan 1, 2012
-
Annual Mine Planning And Execution Buffering - A Safety Imperative ? SynopsisBy R. C. D. Phillis
The annual mine planning process is one of the most important tactical/operational steps towards achieving strategic goals. These tactical plans are part of a very comprehensive Mineral Resource Manag
Jan 1, 2011
-
Improvement Of High-Temperature Electric Characteristics Of Manganese OresBy K. Saito, Y. Miyauchi, T. Nishi, Y. Kizu
At Tokushima Plant of Nippon Denko Co., Ltd. high-carbon ferromanganese is produced by the electric furnace method using lump manganese ores and sintered manganese ores manufactured from fine manganes
Jan 1, 2004
-
Improved Understanding Of Explosive?Rock Interactions Using The Hybrid Stress Blasting Model ? SynopsisSince 2001, the Hybrid Stress Blast Model (HSBM) project members have developed a software suite to model the complete blasting process from non-ideal detonation to muck pile formation. To preserve th
Jan 1, 2012
-
A Feasibility Study Of Recycling Of Manganese Furnace DustBy R. Shen
This paper presents results of a feasibility study of recycling manganese furnace dust generated in production of ferromanganese and silicomanganese at Tasmanian Electrometallurgical Company, Australi
Jan 1, 2007
-
The gas-dynamic method of calculation of explosion-proof distances during explosions of methane-air mixture in mines with regard to explosion protective structuresBy D. Yu. Paleev, O. Yu. Lukashov, A. Yu. Krainov, E. R. Shrager, I. M. Vasenin
The gas-dynamic method is presented of calculation of explosion-proof distances during an explosion of the methane-air mixture in mine working. On the basis of this method is modelled of shock waves i
Jan 1, 2003
-
Universities and Decision-Making: Programme and Qualification Mix ? Four Learning PathwaysBy W. P. Nel
The introduction of the Higher Education Qualifications Framework (HEQF) and the updated Higher Education Qualifications Sub-Framework (HEQSF) has caused many South African university departments to r
Jan 1, 2014
-
Corrosion Protection Of Reinforcement For Concrete StructuresBy R. E. Wilmot
The problem of corrosion of reinforcement in concrete structures is internationally recognised and represents the single biggest expenditure in the preservation of steel reinforced concrete structures
Jan 1, 2006
-
Applications of seismic hazard assessment methods in minesBy G. van Aswegen
Large structures in mines (faults, dykes, pillars, abutments) fail when the load exceeds the strength. If the loading system stiffness (LSS, also referred to as the ‘local mine stiffness’) is lower th
Jan 1, 2003
-
Theory And Application Of Magnesia Ramming Material In Ferroalloy Refining FurnacesBy Y. Jin
Magnesia ramming materials have been widely used in China instead of magnesia bricks as furnace lining materials of ferroalloy refining furnace. The paper introduces the development of the ramming mat
Jan 1, 2004
-
A Review of Work-Integrated Learning in South African Mining Engineering UniversitiesBy L. A. Maseko
"As part of the mining engineering curriculum, students are required to be placed in industry for vacation work or work-integrated learning (WIL). In this paper we review work-based placement as done
Dec 1, 2018
-
Hard rock tunnel boring, cutting, drilling and blasting: rock parameters for excavatabilityBy K. Thuro, R. J. Plinninger
ABSTRACT: Determining tunnel stability is a key issue during preliminary site investigation. In contrast, problems of excavatability have been largely ignored. While the choice of an economic tunnelli
Jan 1, 2003
-
Design of open pit slopes in Ganboke gold mine, ChadBy K. -C. Han, S. -Y. Kim
This study was carried out in a bid to survey Ganboke gold mine in Pala, Mayo-Kebbi Province, southwestern Chad. The Ganboke mine is now being prepared for investigation and development, and the resea
Jan 1, 2003
-
Continuing Professional Development (CPD) For Professionals In Engineering - 1. IntroductionLike it or not, CPD is upon us. As from 1 January 2006, all registered engineering professionals, i.e. professional engineers, professional engineering technologists, professional certificated enginee
Jan 1, 2006
-
Study on Tunneling in Rock Masses with Inclined Layers Using Discontinuous Deformation Analysis (DDA)By J. -H. Wu, S. Nishiyama, Y. Ohnishi
The behaviors and stress distributions of the inclined jointed rock masses with different dip angles obtained from DDA are compared to the results of laboratory tests. By calculating the block stress
Jan 1, 2003
-
A Critical Evaluation Of The Installation Equipment Of In-Stope Rock Bolts And The Effectiveness Thereof In The Merensky Stoping AreasBy G. M. J. van Heerden
Paper written on project work carried out in partial fulfilment of B. Eng (Mining Engineering) degree The Union Section of Anglo Platinum is situated ±18 km west of the town of Northam on the north
Jan 1, 2002
-
Rock avalanche run out prediction: combined application of two numerical methodsBy R. Poisel, C. Scavia, Preh A., W. Roth, M. Pirulli
ABSTRACT: Two methodologies for the three-dimensional simulation of the run out of rock avalanches are presented: one based on a granular approach and the other based on a continuum equivalent approac
Jan 1, 2003
-
An expert system approach in rock engineering risk assessmentBy A. V. Z. Brink
Rock engineering risk is defined in this paper as a function of the potential ground motion; the vulnerability of the workplace; exposure of people; and a general term – quality of information. The pa
Jan 1, 2003
-
Characterization Of Au Catalysts - SynopsisBy T. van Heerden
A range of supported gold catalysts was prepared by ion exchange, varying many of the preparation variables, including concentration in the precursor solution, washing procedure, as well as drying and
Jan 1, 2012
-
Deformation analysis for the middle pier of the Permanent Ship Lock of Three Gorges ProjectBy H. Zhu, F. Xu, T. Wang
Abstract : The deformation monitoring data of the middle pier of the in permanent ship lock in Three Gorges revealed several interesting deformation phenomena. Conclusions and explanations are made co
Jan 1, 2003