The presinking of Harmony No. 4 shaft by use of the MA TLA headgearBy I. M. W. Preston
A new shaft system was required to replace stope face for the North Section of Harmony Mine and to allow for systematic opening up of the North Eastern Section. Owing to the economic circumstances at
Jan 1, 1983
-
Guidelines for the derivation of reliable material balances from plant dataBy L. C. Woollacott
Some of the factors that may influence the reliability of a consistent material balance derived from plant data were investigated, data taken from a sampling of the Iow-grade tin-flotation circuit at
Jan 1, 1987
-
The influence of resin functional group on the ion-exchange recovery of uranium (778860ee-6156-4db6-a821-46f732b870f3)By J. Ungar, F. X. McGarvey
The selectivity of ion-exchange sites varies with the matrix of the polymer, the nature of the site. and the method of application. The effect of these variables on the recovery of uranium is examined
Jan 1, 1981
-
Application of redox titration techniques for analysis of hydrometallurgical solutionsBy O. Bazhko
Regular analysis of different streams is important for the control of hydrometallurgical processes. Various physical and physical-chemical methods are applied for this purpose. Many modern methods req
Jan 1, 2009
-
Granulation Of Titania SlagBy P. Beukes, D. Bessinger, R. Glenewinkel
High titania slag is produced by the smelting of ilmenite and a suitable carbonaceous reductant in electric furnaces. Currently liquid slag is cast into large blocks, which take about 10 days to cool
Jan 1, 2007
-
GENFLOW: An Equation-oriented Computer-aid for the Calculation of Ore-dressing Material Balances Using Performance IndicatorsBy L. C. Woollacott
A computer-aid is described that is designed to calculate steady-state material balances for ore-dressing circuits. The program determines the material balance from a specification of the process cond
Jan 1, 1987
-
Some Pitfalls And Misuses Of Rock Mass Classification Systems For Mine Design - Synopsis (57b4eff3-65a5-4143-acc2-167abb07c5f7)Rock mass classification systems are extensively used in rock engineering design work, and mine design is no exception. Among the systems most widely used for mining-related design work are the NGI 0-
Jan 1, 2012
-
Characterization and optimization of the high temperature caustic conditioning (HiTeCC) activated carbon process for optimized gold recovery from double refractory ores, P.J. Pieterse, R.F. Sandenbergh, and C. van BuurenBy C. van Buuren, R. F. Sandenbergh, P. J. Pieterse
Gold extraction from double refractory ores using conventional cyanidation has proved challenging due to the presence of carbon within the ore. Carbon particles may adsorb leached gold resulting in go
Jan 1, 2020
-
Witbank/Middleburg Branch Proceedings of the January, 1969, General MeetingThe January General Meeting was held at The Moth Hall, Witbank, on Thursday, 30th January, 1969. Mr C. G. Sowry (Chairman of the Witbank/Middelburg Branch) was in the chair. There were also present
-
Occupational Health Risk Assessment: Central To The Management Of Occupational HealthBy C. J. Badenhorst
Occupational illnesses and diseases tend to be chronic and are generally characterized by temporary or permanent physical dysfunction. With the exception of some symptoms, they are not generally visib
Jan 1, 2004
-
Recommissioning A Two-Km Long Waste Mica Slurry PipelineBy P. Harris, N. Heywood
An existing 1 800 m long pipeline, which carried waste mica slurry from kaolin processing, is to be recommissioned. The mica solids throughput is to be substantially increased from 5.2 t/h up to a max
Jan 1, 2007
-
Book news1. Reviews Extraction metallurgy, by J.D. Gilchrist. 3rd ed. Oxford, Pergamon, 1989. 431 pp. £50.00 (hard cover), £14.95 (soft cover). Reviewer. Prof. M.D. Brayshaw. Reviewer. Prof. M.D. Brayshaw This
Jan 1, 1991
-
Material tracking system for bulk material handlingBy M. H. Lampen
The SILAG Material Tracking System MTS monitors and controls the complete material flow throughout the plant - and even companywide. The customized system developed by Siemens especially for bulk mate
Sep 1, 2001
-
The Performance Of Coatings Compared To Pt-Based Superalloys Intended For High Temperature Applications Subjected To Hot Corrosion: A ReviewBy L. A. Cornish, R. Süss, M. Sephton, N. B. Maledi, J. H. Potgieter, L. Chown
The gas turbine industry is faced with a challenge to improve the performance of engines, while simultaneously adhering to stringent environmental legislation. One way of addressing the problem is by
Jan 1, 2006
-
A Stochastic Cut-Off Grade Optimization Model to Incorporate Uncertainty for Improved Project ValueBy J. Githiria, C. Musingwini
"Cut-off grade is a decision-making criterion often used for determining the quantities of material (ore and waste) to be mined, ore processed, and saleable product. It therefore directly affects the
Mar 1, 2019
-
Back To Basics At Richards Bay Minerals? Mining Operation: Examples Using Six Sigma MethodologyBy C. I. Ware
The phrase ?back to basics? is used to describe the fundamental principles and philosophies on which a successful mining operation is based. At Richards Bay Minerals (RBM), ?back-to-basics? (BTB) has
Jan 1, 2007
-
A Framework To Simplify The Management Of Throughput And ConstraintsBy A. Cambitsis
We show that the prioritization of business improvement and performance management decisions may be significantly improved by taking into account the systemic effects of changes made in a single proce
Jan 1, 2012
-
The education, training, and employment of engineersBy Colin M. Spence
If one is to discuss sensibly and beneficially the whole spectrum of education, training, and employment of engineers, it is not possible to confine oneself to Professional Engineers because the profe
Jan 1, 1985
-
Book reviewsIntroduction to high temperature oxidation of metals, by N. Birks and G. H. Meier, London, Edward Arnold, 1983. 19S pp. R30,25. Reviewers: M. B. Cortie and G. G. Garrett Seam gas drainage with particu
Jan 1, 1984
-
Transformation Of The Palabora Copper Smelter From A Captive Smelter To A Toll / Custom SmelterBy D. Brazier, W. Laing, D. Nixon
Keywords: Pyrometallurgy, furnace, smelter, copper, Palabora The Palabora copper smelter has operated for the past 38 years, treating concentrates produced at the mine site. Palabora has reduced c
Jan 1, 2006