    Rebuild of a Flash Smelting Furnace Using Explosives

    By Scott G. Giltner, Terry Millar, Ben Bringhurst

    "Kennecott Utah Copper (KUC) Smelter scheduled a rebuild of their flash smelting furnace forSeptember, 2014. KUC’s goal in this project was to reduce the rebuild time from 65 to 55 days by using explo

    Jan 1, 2016

  • ISEE
    Application of Geostatistical Tools in Measurement While Drilling to Assess Geotechnical Rock Conditions in Sublevel Caving

    By Clara Godoy, Álvaro Dapía, Paulo Couceiro, Pablo Segarra, José Ángel Sanchidrián, Juan Navarro

    This paper applies geostatistical tools in Measure While Drilling (MWD) data to estimate the probability distribution of values in all the points of the studied domain in order to assess the continuit

    Feb 1, 2020

  • ISEE
    A Review of Recent Accidents Involving Explosives Transport

    By James Rowland, Richard Mainiero

    When most people think of explosives transport they think of a hazardous operation. We all know that we aren’t allowed to transport explosives through tunnels and are discouraged from traveling throug

    Jan 1, 2008

  • ISEE
    What Really Is ANFO?

    By Jean M. Bouvet, Pierre M. Vuillaume

    There is not just one ANFO: ANFO explosive behaviour depends significantly on the blasting conditions and on its physico-chemical characteristics. For instance, ANFO effficiency increases whereas AN p

    Jan 1, 1993

  • ISEE
    The Changing Economics of Percussion Blast Hole Drilling

    By Henry P. Jr Van Ormer

    During any blast hole operation the first choice to be made is hole size - it seems simple, just calculate all the factors, spacing, burden, depth, rock characteristics, powder factor, etc. and you ha

    Jan 1, 1983

  • ISEE
    A Study of the Impact of Explosive Quality on Blast Performance

    By Alastair Torrance

    The performance of commercial explosives is clearly influenced by the conditions under which they are used. Mining companies are supplied with Technical Data Sheets which provide details about explosi

    Jan 1, 2013

  • ISEE
    Optimization of Ring Blast Design for Ore Dilution Control in Underground Hard Rock Mine Using Numerical Simulation

    By A. Vishwakarma, V. Himanshu, K. Dey

    Underground mining is the most feasible method after extinction of shallow depth ore deposits. Longhole stoping method is the most technically advanced method for the faster excavation. In this method

    Jan 1, 2024

  • ISEE
    Blast Optimization and Vibration Control at a Multi-Seam Coal Mine, Brazil

    By Enrique Munaretti, Vitor Rosenhaim, Jair Carlos Koppe, Joao Francisco Feijo

    The B3 mine is a multiple coal seam strip mining in operation in Rio Grande do Sul, the southernmost state in Brazil. A traditional truck & excavator operation is used to remove the overburden and sel

    Jan 1, 2012

  • ISEE
    Development of Controlled Blasting Pattern for Rock Excavation to Create Foundation of an Industrial Establishment

    By Dipankar Gorain, A K. Vishwakarma, Vivek K. Himanshu, Murari P. Roy, Shubham Singh, R S. Yadav

    The industrial establishments of a power plant consist of many important structures viz. cooling tower, wagon tippler, track hopper, plants and offices. The leveled foundation is the utmost need for e

    Feb 6, 2023

  • ISEE
    Shock Impedance Method Applied to Detonation Pressure Measurements

    By Santiago Gómez, Pablo Segarra, José A. Sanchidrián

    In-hole detonation pressure measurements are unusual in the production environment of a mining operation, partly owing to the hostile conditions to which recording equipment and pertinent probes must

    Feb 6, 2023

  • ISEE
    Safe Blasting Parameters And Seismic Influences During Construction Blasting

    By Mario Dobrilovic, Zvonimir Ester, Vinko Skrlec, Vjecislav Bohanek

    The first public garage in the city of Dubrovnik has been built in highly urbanized area, on location Ilina Glavica. The excavation of the building pit has been done partly by construction machinery,

    Jan 1, 2009

  • ISEE
    Effect of Geology and Mechanical Properties of Rock on Blast Results

    By Ph. D. Favreau, Favreau Patrice B. Eng, R. F.

    Geology is important in mining by helping to identify the rocks which contain sufficient valuable ore to justify their excavation. Geologists give a geological name to each rock type, so geology is a

    Jan 1, 2019

  • ISEE
    The Effects of Various Wet-Hole Loading Methods on Powder Factor

    By Neal Lee

    Often the effects of wet boreholes are not taken into consideration when designing a blasting program to exhibit a certain amount of explosive energy per unit of rock such as design by powder factor,

    Jan 1, 2011

  • ISEE
    Blasting Specifications and Guidelines for Protective and High-Profile Blasting

    By Brian Lewis, Reinhold Daykin Schnell

    Blasting specifications and guidelines are very important aspects of detailed project specifications covering any scope of work (SOW) that involves explosives and blasting procedures. A lot of larger

    Feb 6, 2023

  • ISEE
    Blast Optimization Through Drilling Information: GBlast®, a Predictive Modeling Software

    By Claudio Lechuga, Carlos Scherpenisse, Juan Rafael Otaiza

    From the analysis of drilling process, Block Model information, drilling pattern data and expected fragmentation targets; GBlast® software optimizes the explosive charge design in order to standardize

    Feb 1, 2020

  • ISEE
    Crack Displacement and Vibration Measurement of an Underground Portal

    By Douglas Rudenko PG, Jay Elkin, Siavash Mahvelati Ph. D.

    Very little studies have investigated the behavior of cracks in unlined tunnels over long periods of time, especially when such flaws are subjected to blast-induced vibrations. Using a pool of 30+ bla

    Feb 1, 2020

  • ISEE
    Automation of Rock Fragmentation Analysis

    By Hairong Zeng, Matthew Baumann, Shahram Tafazoli, Edmond Chow

    Measurement of rock fragmentation has evolved from a completely subjective and manual process to a statistically objective and semi-automated process. However, ultimately, the vision is to achieve a s

    Jan 1, 2012

  • ISEE
    Automation of Drill and Blast - Measurement Techniques to Develop Standard Procedures (a3ef629c-b178-4045-bc88-d04c273fd2c0)

    By Ewan Selers, Gary Cavanough

    Drilling automation technology is well advanced and automated drill rigs are in use at a number of operating mines. This is not the case for the other drill and blast processes due to significant tech

    Jan 1, 2016

  • ISEE
    Full-Scale Testing of Delay Timing Effects on Rock Fragmentation in the Shock Collision Regions

    By M R. Hettigner, J Nawrocki, C E. Johnson, P G. Cahill

    This study evaluates the effects of both short inter-hole and intra-hole delay times on rock fragmentation and throw. Full-scale test blasts were analyzed at a granite quarry in Talbotton, GA. This an

    Jan 1, 2017

  • ISEE
    Minimising Coal Damage and Loss Due to Cast Blasting

    By Tapan Goswami