Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    The European Integration through a Major Drill & Blast Tunneling Project

    By Demosthenes (Dennis) Efstratiadis

    After European Council’s Directive 93/15/EEC of 5 April 1993 on the harmonization of the provisions relating to the placing on the market and supervision of explosives for civil uses, the so called ”I

    Jan 1, 2018

  • ISEE
    Disruption of the Powder Column

    By Jack Eloranta

    "Unwanted, dynamic interaction of adjacent blastholes is a well-recognized phenomenon. Timingschemes and products are selected to minimize adverse effects. Large diameter, surface blasting is less pro

    Jan 1, 2016

  • ISEE
    Mine-to-Plant Optimization Through Ultra High-Energy Explosives and Blending Strategies in Extremely Hard Rock Conditions

    By Luis Huaroc, Jorge Cardenas, José Salvador

    One of the current challenges in mining is managing increasingly competent rock conditions within the mine-to-plant value chain, particularly when working with marginal ore grades. This study presents

    Jan 26, 2026

  • ISEE
    The Recovery of a Dozer from a Highwall Using Blasting

    By Tyler Acorn, Tristan Worsey

    A dozer operator at a surface gold mine accidentally drove a D10 off the side of a highwall. The blade of the dozer caught on the lip of a catch bench 60 ft. (18.3 m), down stopping its descent. The o

    Jan 1, 2014

  • ISEE
    Physics Based 3D Rock Blast Movement Modelling

    By THOMAS BAMFORD, Dale S. Preece, Amir Behbahanian, Mick Lownds

    An important aspect of blasting is rock movement and final muck configuration. Computer modeling of this process has been done in 2D for many years, revealing insights into the blasting process and en

    Jan 26, 2026

  • ISEE
    Urban Tunneling for the MWRA's Boston Harbor Clean Up

    By Gordon C. Petersen, Gary A. Almeraris

    This paper describes the controlled blasting techniques required to mine a rock tunnel section of a main interceptor located in the Boston Metropolitan area. The 3m (10 ft) x 2.8m (9.25 ft) horseshoe

    Jan 1, 1991

  • ISEE
    HDAN and Gasified Emulsion Blends Improving Blasting at Peruvian Mines

    By Romel Villanueva L.

    "Peru does not produce ammonium nitrate; nevertheless it is a large consumer of both, porous prill (PP) and high-density (HD) varieties. Explosives cost is an important preoccupation in Peru, due tofl

    Jan 1, 2016

  • ISEE
    Method for Developing Explosion Damage Potential Contours in Urban Areas

    By Braden Lusk

    The problem of predicting damage in densely developed areas due to incidental or malicious explosions is one of considerable importance to local, state, and federal governmental bodies. The difficulty

    Jan 1, 2010

  • ISEE
    Diamonds are a Driller's Best Friend

    By Langdon T. Mitchell, Karl Ingmarsson

    The title is not referring to jewelry; nor is it about diamond core drilling. This article is instead about an emerging application for diamonds, hard rock percussive drilling with diamond drill bits.

    Jan 1, 1999

  • ISEE
    HMX Based Electronic Initiation System for Blasting in High Temperature Ground and/or Extremely Reactive Ground

    By K. Dufresne

    Blasting in geothermally high temperature ground and/or extremely reactive ground is an increasing common challenge for surface and underground mines. Many current PETN based non-electric and electron

    Jan 1, 2024

  • ISEE
    Seismic-Controlled Blasting Near a Critical Tailings Dam: A Case Study from an Open Pit Copper Mine in Chile

    By Gabriel Gonzalez, Paulo Couceiro, Luis Manriquez, Alejandro Gutierrez, Juan Navarro

    A high-stakes blasting campaign was successfully executed at a major open pit copper mine in northern Chile. This operation posed a significant technical challenge due to its immediate proximity to th

    Jan 26, 2026

  • ISEE
    An Explosive Delivery System implementation in the Steep Gullies at the Arapahoe Basin Ski Area

    By Mark Bosse

    This is a paper demonstrating the use of a fixed wire and trolley system to deliver 2 or 5 lb cast primers (with 2 meter cap/fuse assemblies) deep into avalanche terrain. This avalanche terrain is mi

    Feb 1, 2020

  • ISEE
    Efficient Blasting for Bench Stability and Fragmentation Results Improvement

    By Javier Illanes Pizarro, Gustavo Huerta Valer, Jorge Cárdenas Miranda

    Bench stability is the basis of sustainability in an open pit mining operation. Taking care of the pit walls while maintaining fragmentation results can prove a challenge. In this study, technical pro

    Feb 6, 2023

  • ISEE
    Efficient and Safe Pre-Split Blasting Through Mechanized Explosive Loading System

    By Jorge Cárdenas, Gustavo Huerta, Regina Rocha Oriundo, Miguel Angel Humpire, Johan Salas Flores

    Currently a critical activity for slopes stability and safety in mining is pre-split blasting to reduce damage from trim blast. Most common explosive used are based on packaged explosives, with 1 ½ in

    Feb 6, 2023

  • ISEE
    Vibration impact reduction to the community through low density bulk emulsion.

    By E. Líder, J. Pavez, J. Rivera

    The application of new technologies, methodologies, and the use of new products in mining operations is a practice that is becoming more common in the industry every day, added to the new challenges a

    Jan 1, 2024

  • ISEE
    Drone Technology Utilization to Increase Safety and Support Analysis for Blasting Process

    By Ery Wardhana, Stefanus Jagad, Relinda Sanistya, Hasucita Tausi, Rido Situmorang

    The blasting process is one of the most high-risk activities in mining operations. Shotfirers and blasting crews face hazards from slope failure, toxic gas and fumes, or unstable ground condition ever

    Feb 6, 2023

  • ISEE
    The Effect of Charge Mass and Delay Timing on Airblast Overpressure

    By Adrian Moore, Dominic Hooton, Alan Richards

    Significant factors affecting airblast overpressure (AOP) emissions include charge mass per delay, distance from the blast site, burden, stemming height, and delay timing, topographic shielding, and m

    Jan 21, 2025

  • ISEE
    Improvements to Blast Performance by Use of a Low-Density Emulsion at Barrick Goldstrike's Meikle Mine

    By Tony Francelj, D. Scott Scovira, Remi Proulx

    The Meikle Mine is a high-grade, underground gold mine that utilizes a primary and secondary stoping method with delayed backfill. The newly developed Rodeo Mine will start production using similar mi

    Jan 1, 2002

  • ISEE
    Recent Projects - Emergency Bridge Blasting

    By Brent Blanchard

    As most veterans of our industry are aware, explosive demolition by its very nature is often a challenging proposition. Even under the best of circumstances, proper planning and care must be taken dur

    Jan 1, 2003

  • ISEE
    The Specifications said No Blasting

    By Timothy Fogarty, Gregory Poole, Roger Reeder, David Switz

    This project involved the construction of a new pump station and intake structure at an existing water treatment facility. Although the project involved a significant amount of rock removal, the speci

    Jan 1, 2012