Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Dewatering Tests for Underground Stations in RomeBy Antonio Zechini, Giuseppe Iorio, Massimo Grisolia
"The new C Line of the Rome Metro runs northwest to southeast across the city center, with 30 new stations and a total length of more than 15.5 mi (25 km). Due to the presence of a dense urban environ
Jan 1, 2017
-
Design and Construction of the Deepest Base Grouted Bored Piles at Moorehouse in LondonBy Adam Pickles, Duncan Nicholson, Richard E. Prust, Hoe C. Yeow
"Moorhouse is founded on what at the time of construction were the deepest base grouted piles ever installed in London, specifically designed to accommodate settlement from the proposed development of
Jan 1, 2005
-
St. Louis Service Base Floating Wharf Mooring System ReplacementBy A. Bozorgzadeh, B. M. Jensen, B. N. Koelling, B. R. Murtaugh
"The Service Base mooring system originally consisted of two general types of structures, 19 timber piles cabled together and steel three-legged pipe piles. The St. Louis District fleet moored to the
Jan 1, 2017
-
A Non Linear Fractal Model for the Analysis of Pile FoundationsBy Paola Campana, Maurizio Lenzi
"In the paper a non linear model for the analysis of the pile response to the axial loads is presented. The study aims to find a general analytical solution concerning the pile-soil interaction modele
Jan 1, 2017
-
Evaluation of Elongation Criteria and Friction Loss in Ground AnchorsBy John P. Turner, Benjamin J. Turner
"This report describes a research project for evaluating the applicability of the widely accepted 80 percent criterion for elongation of ground anchors to anchors with unbonded lengths exceeding 100 f
Jan 1, 2017
-
Design Of Bored Piles In Chalk At The New Medway Crossing Based On Instrumented Load TestsBy David J. Puller
As part of the value engineering process on a major Design Build highway project, instrumented trial pile load tests were used to achieve savings in cost and time on the foundations for a major river
Jan 1, 2002
-
Limiting Damage To Historic Structures In New York City, 1981 To PresentBy Andrew J. Ciancia
The construction of the Pennsylvania Station in Manhattan, the Beaux-Arts masterpiece, was completed in 1910. In financial ruin, the Pennsylvania Railroad Company sold the station in the 1960?s and t
Jan 1, 2008
-
On Driven Piles In The Arabian Gulf: Imperfections, Potential Challenges, And Lessons LearnedBy Waddah Akili
The demand on pile installation in the offshore of the Arabian Gulf has, over the last two decades, experienced unprecedented boom, triggered by the construction of platforms, to help facilitate the p
-
Practical Reuse of Foundations in High Rise ConstructionBy William H. Walton, Clyde N. Baker Jr., Darren S. Diehm
"A 51-story concrete core and steel frame commercial office tower was recently constructed on the site of the former US Gypsum building in downtown Chicago, Illinois, USA The structure foundation reus
Jan 1, 2005
-
Performance of Open-Ended Pipe Piles in Cretaceous Soils of BaltimoreBy Sanjeev Malhotra
"This paper presents the results of a pile installation monitoring and performance assessment program for pile foundations supporting 14 piers and 2 abutments of the 1700-ft long bridge crossing over
Jan 1, 2005
-
Optimized Neural Network Model For The Prediction Of Driven Pile's ResistanceBy Hyun. I. Park
Although numerous investigations have been performed over the years to predict the behavior and bearing capacity of piles, the mechanisms of these behavior and bearing capacity of piles have yet to be
Jan 1, 2006
-
Engineering The Mansion's HeritageBy Ken MacLeod
A development at 83 Queens Road in Melbourne, Australia required construction of a three level basement. The normal geotechnical constraints of excavating adjacent to an existing relatively new buildi
Jan 1, 2006
-
Optimization Of Drilled Shaft Design For A Highway Bridge In Arizona Using Load Test ResultsBy John C. Niedzielski
The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter)
-
Development of Lattice-Shaped Cement Treatment Method for Liquefaction CountermeasureBy Seiji Mizutani, Hirofumi Taguchi, Makoto Yoshida, Hidenori Takahashi, Naotoshi Shinkawa, Kazuo Konishi, Yoshiyuki Morikawa, Masaya Kawata
"The lattice-shaped cement treatment method has been used to improve the seismic performance of liquefied sandy soil in Japan. The efficacy of the method has been confirmed by the huge earthquake in J
Jan 1, 2015
-
Comparison of LRFD Resistance Factors to Tension Pile Load TestsBy Seth H. Hamblin, John E. Regan, Dimitrios Palantzas
"Through reliability-based calibration of larger pile load test databases, recent developments of the Load Resistance Factor Design (LRFD) methods, which include geotechnical load and resistance facto
Jan 1, 2015
-
Failure Modes for Embankments over Ground Improved with DCM Column Walls beneath the SlopeBy Manasi Wijerathna, D. S. Liyanapathirana
"Deep cement mixing is a popular soft ground improving technology that improves the bearing capacity and settlement characteristics of natural soil. When Deep Cement Mixed (DCM) columns are installed
Jan 1, 1900
-
Building The Devil’s Playground: How a Ground Improvement Program Eliminated the Need for Pile FoundationsBy Christian B. Woods, Joe C. Drumheller
"Kenneth A. Huber, P.E., Langan Engineering & Environmental Services, New York, New York, USAThe dream to bring New Jersey Devils hockey to the largest city in New Jersey became a reality in the summe
Jan 1, 2015
-
The Use of Vibratory Driving of Foundation Piles for Offshore Applications - State of the PracticeBy Nicolas Moscoso, Gerald Verbeek, Marcel Bielefeld, Rob van Dorp
Upon recently, most offshore foundations were based on a number of driven piles that were installed with an impact hammer. With the increase in offshore windfarms two major developments have occurred:
Jan 1, 2019
-
Commentary on the Selection, Design and Specifcation of Ground Improvement for Mitigation of Earthquake-Induced LiquefactionBy Ground Improvement Committee
The evaluation of earthquake-induced liquefaction has become a routine part of geotechnical engineering design. For a given project, if an analysis identifies a potential for liquefaction and the cons
Aug 1, 2013
-
Overview of Construction and Design of Auger Cast-in-Place and Drilled Displacement PilesBy Monica Prezzi
"Auger cast-in-place (ACIP} piles and drilled displacement piles are being increasingly used as foundation elements for structures, particularly in projects requiring accelerated construction or invol
Jan 1, 2005