Innovative Use of an Active Soil Nail Wall in Lieu of Pit Underpinning for a Historic BuildingBy Tai Luu, Maxim C. Schisler, Yaser Taheri
The Stevens Gateway Project is an expansion of the Stevens Institute campus overlooking the Hudson River in Hoboken, NJ. The plans call for 90,000 ft2 (8360 m2) of new classroom, research, and student
Jan 1, 2019
-
Observed Driving Performance of Open-Ended Steel Pipe Piles with and Without Plugged ToesBy Chu E. Ho, Paul Napoli
This paper presents the performance of nineteen open-ended steel pipe piles driven through highly variable overburden soils into glacial till and schist bedrock. The piles were 16 inches in diameter a
Jan 1, 2019
-
Augered Cast-In-Place Piles Quality ControlBy Rudolph P. Frizzi
The current trend of increasing augered cast-in-place (ACIP) pile diameter, length, and load carrying capacities demonstrates improvements in installation equipment, increased acceptance, and that qua
Jan 1, 2001
-
Inspector?s Guide to Augered Cast-in-Place PilesBy Matthew E. Meyer
The intent of this manual is to provide guidelines for observing and documenting the installation of ACIP piles. The manual may also serve as a guide for the training of inspection personnel. It is ex
Jan 1, 2010
-
Inspector?s Guide To Augered Cast-In-Place Piles - Second Edition - Title ? Table Of Contents - 1.0 GeneralThis manual is limited to Augered Cast-in-Place (ACIP) piles constructed using a hollow stem continuous flight auger. 1.1SCOPE AND LIMITATIONS The intent of this manual is to provide guidelines
Jan 1, 2010
-
Contactless Anchor Measurement with Elastomagnetic SensorsBy Damir Dedic, Wörle. Patrick
"Soil properties within a construction project area are analyzed during the planning phase. However, it is only possible to achieve selective soil exploration, even in the case of very extensive inves
Jan 1, 2017
-
Deep-Sea Quay Wall for Offshore Wind Energy Terminal on Maasvlakte 2 Rotterdam – NLBy Patrick van der Schaaf
"During 2016, foundation piling works were completed to allow for the construction of a production and storage/handling terminal in Rotterdam. It is there that steel foundations will be produced for o
Jan 1, 1900
-
Optimization of Drilled Shaft Design for a Highway Bridge in Arizona Using Load Test Results (0a742001-9cf1-441f-b0fc-5890697ef97e)By John C. Niedzielski, A. Frances Ackerman
The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter) l
Jan 1, 2017
-
Fraser Heights Bridge – Comparison between PDA Tests and Pile Capacity Estimation MethodsBy Ali Azizian, Brian Hall
"Driven piles were selected to support the Fraser Heights Bridge bents. Piles were a key component of the top-down construction approach, which was adopted for minimizing potential impacts on an envir
Jan 1, 2016
-
-
Interdisciplinary And Inventive Approaches To Drilled Shaft RemediationBy William D. Oder, Seth H. Hamblin, Les R. Chernatskas, Jonathan L. Ernst
Large diameter drilled deep foundations are a widely utilized solution throughout North America and the world. Numerous design and construction techniques developed over the past 100 years have made t
Oct 1, 2022
-
Allowable Compressive Design Stresses For Pressure-Treated Round Timber Foundation Piling - Presented Before The American Wood-Preservers' Association Reno, Nevada, May 1985By James S. Graham
Research at the University of Colorado on southern pine and Douglas-fir piling has determined that the existing building code design stress values of 1200 psi and 1250 psi, as determined by ASTM D-289
Jan 1, 1986
-
Environmental Considerations Regarding The Danish Landworks For The Fixed Link Across The Øresund - SynopsisBy Uwe Hess
For the Danish landworks for the coming fixed link between Denmark and Sweden across the Øresund the focus has been on the environmental aspects of the construction and operation of the facilities. Th
Jan 1, 1996
-
High-Capacity Driven-Pile Foundation for a 33-Story High-Rise in Milwaukee, Wisconsin, USABy Patrick J. Hannigan, William H. Walton, Ryan C. Rusk, Van E. Komurka
"The project consists of a 33-story building with two levels of below-grade parking across the entire building footprint. Timely and cooperative teamwork among the owner/developer, geotechnical engine
Jan 1, 2017
-
Ground Disturbance Due to Static Pressure Driving of Opened-Ended PHC PilesBy Xiaocen Lu, Guowei Li, Jiantao Wu, Thang N. Nguyen, Andrew C. Amenuvor
"This paper investigates the effect of driving a group of 52 open-ended Prestressed High Strength Concrete (PHC) piles on an existing highway embankment based on field measurements of excess pore pres
Jan 1, 2016
-
Grouting of an Artesian Zone in Advance of Powerhouse Excavation for the Red Rock Hydroelectric ProjectBy Dewey W. Geary, Rachael V. Bisnett, R. Michael Bivens, Thomas G. Andrews
"The powerhouse for the Red Rock Hydroelectric Project is being constructed at the toe of the existing U.S. Army Corps of Engineers’ Red Rock Dam immediately adjacent to the existing stilling basin re
Jan 1, 2016
-
The Berkeley Art Museum: Repurposing a Historical BuildingBy Timothy Nelson, Simon Burnworth
"The Berkeley Art Museum and Pacific Film Archive (BAMPFA), which currently resides in a 1970s-era post-modern concrete structure just south of the University of California, Berkeley campus, was in ne
Jan 1, 2016
-
Rammed Aggregate Pier Group Load Test Results For Large Infrastructure Project In The Middle EastBy Brian Metcalfe, Kord Wissmann, Gianni Martinez
The Middle East consists of vast deserts that reach temperatures up to 50 degrees Celsius, with some areas characterized by endless sand dunes. When the project team selected the location for a large
May 1, 2022
-
Execution Example of the Expanded Dry Jet Mixing (EX-DJM) Method (71db6e71-57a4-4d54-81bc-d746d501291d)By Kiyotaka Ohno, Nobushige Yasuoka, Yosuke Hioki
"The diameter of improved columns adopted by the original DJM Method had been 1000 mm, however, in order to comply with the social need for construction cost reduction, the Expanded Dry Jet Mixing (EX
Jan 1, 2015
-
Effects of Deep Mixing Method to Reinforce Earth Levees in the Mekong Delta, VietnamBy Bao K. Le, Khang T. Truong, Masaki Kitazume, Toru Kobayshi, Long P. Le, Tanaka Hitoshi, Makoto Kamimura, Hoang-Hung Tran-Nguyen
"Earth levees constructed using dredged materials taken from a river along an earth levee have annually damaged in the Mekong Delta due to high void spacing in earth levees and floodwater. Sliding and
Jan 1, 2015