Underpinning System Based On Preloaded Micropiling For Construction Of Additional Underground FloorsBy Wolfram Groh
New underground floors comprising the complete footprint area of the building structure, were constructed under an existing building in sand, located in the Verdun district of Beirut / Lebanon. The wo
Jan 1, 2002
-
Behaviour Of Model Pile Group Under Axial Monotonic LoadingBy A. Le Kouby
We present in this paper the results of a parametric study carried out in a calibration chamber on instrumented model piles. The aim is to point out group effect on piles within a group through their
Jan 1, 2006
-
Piled Raft System - Approximate Design Methods. - SynopsisBy S. L. Karunakaran
There are cases where it is found that a raft foundation would have adequate factor of safety against ultimate bearing capacity failure but the settlements would be excessive. Piles may be introduced
Jan 1, 1996
-
Engineering Practice Of Ground Improvement ? IntroductionBy H. R. Taber
The extensive subject area "Engineering Practice of Ground Improvement" will be treated within the limitations of space and the writer on the basis of personal practice and experience?largely in North
Jan 1, 2010
-
Numerical Analysis Of The Osterberg Cell Loading TestBy Brunella Recinto
Pile loading tests are carried out with two main objectives: 1) evaluating the ultimate resistance; 2) checking the behaviour of the pile under live load. In the first case and particularly for large
Jan 1, 2003
-
Nailed It! The Great Wall of the Chinese EmbassyBy Fred Tarquinio, Giovanni Bonita, Lars Wagner
"A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large
Jan 1, 2007
-
Monotonic And Cyclic Lateral Full-Scale Testing Of Reinforced Helical Pulldown MicropilesBy M. Meckkey El Sharnouby
In this paper, the results of full-scale field testing of reinforced helical pulldown micropiles (RG-HSP) installed in clayey till soils and resting on sandy soils are presented. Piles were tested und
Jan 1, 2011
-
2022 OPA Winner: Mosul Dam Rehabilitation ProjectBy Raffaella Granta
Mosul Dam is an earth fill dam located on the Tigris River, approximately 40 km (25 mi) northwest of Mosul, Iraq. The construction of the dam was completed in 1984. It is one of the largest multipurpo
Oct 1, 2022
-
Static Behavior Of Single Piles Subjected To Repeated And Reciprocating Loadings ? SynopsisBy L. Z. Xie
The results of the experimental study on the static behavior of single piles subjected to repeated and reciprocating axial loadings are recommended in this paper. Tests of four full-scale single piles
Jan 1, 2010
-
Diaphragm Walls for Infrastructure Projects how to Deal with Complex Demands?By Franz-Werner Gerressen, Manfred Schoepf
"Diaphragm walls are known as underground structural elements commonly used as retention systems for excavation pits and shafts and permanent foundation walls or elements. It can be anticipated that,
Jan 1, 2015
-
The Choice between HSDT and RLT: Selection Criteria for Concrete Pile TestingBy P. Middendorp, Gerald E. H. Verbeek
"INTRODUCTIONStatic Load Testing (SLT) is generally considered the pile testing method that provides the de-facto answers regarding pile capacity and load-deflection behavior. However, as this testing
Jan 1, 2006
-
Case History: Comparison of CSL Results to Physical ObservationsBy David S. Graham, Paul J. Axtell
Crosshole Sonic Logging (CSL) non-destructive integrity testing identified anomalous readings near the base of a 6.5-foot diameter drilled shaft rock socket. The anomaly was confirmed to be a defect b
Jan 1, 2019
-
Diplomacy And Innovation: Octakong And The Hong Kong-Zhuhai-Macau Bridge ProjectBy David White
When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau a
-
Foundation Contracts And Law - Part -1: Relevan[i] LawBy Kirty Dave
Foundations in any contract are the most uncertain parts of the contract and most of the "Construction-Contract-Disputes" are either directly related to foundations or arise as 'Side-effects of c
Jan 1, 1996
-
Transverse Isotropy Effects On P-Y Curves For RockBy Ehab S. Shatnawi
It is common in practice to design laterally loaded rock-socketed drilled shafts using the p-y curve methods. However, the existing p-y curve criteria for rock were derived either semi-empirically or
Jan 1, 2007
-
Design and Construction of Specialty Foundation for the Historic Virginia State Capitol BuildingBy Robert S. Thomas, Bernard M. Tarralle, Nasser Massoudi
"The Commonwealth of Virginia is restoring and expanding its Capitol of great historic significance. Designed by Thomas Jefferson in 1785, it is the second oldest Capitol building in the United States
Jan 1, 2005
-
Drilling And Grouted Pipe Pile Foundation For Department Of Energy Spallation Neutron Source Target Building, Oak Ridge, Tennessee ? IntroductionBy Ronald E. Walkington
The U.S. Department of Energy (DOE) is building the world's newest accelerator-based, pulsed-neutron system, called Spallation Neutron Source (SNS). The facility, located in Oak Ridge, Tennessee,
Jan 1, 2001
-
Fundamental Issues Of Displacement Auger Piling: The European PerspectiveBy Maurice Bottiau
When dealing with displacement auger piling, some general and fundamental issues have to be considered, irrespective of the system. More than with other pile types, the interplay between the soil cond
Jan 1, 2003
-
Engineering Foundation Support For Las Vegas Strip's Tallest Hotel CasinoBy Nicholas P. Gura
This paper presents the analysis, design, and load test program results for drilled shafts to support a 70-story hotel tower and associated 10 story podium structures located in Las Vegas, Nevada. A
Jan 1, 2007
-
Switching From Monetary Process Management To Critical Success Factors Using An Appropriate Process Information SystemBy Jochen Maurer, Dr. Christian Hoyme, Dr. Hans Regler
Currently, it is very difficult to obtain qualitative and quantitative information about the status and production process of a construction site. As a rule, companies depend on reports from on-site e