    Rock Socket Piles In The Sherwood Sandstone Of Central Birmingham

    By L. J. Whitworth

    Five trial piles were constructed during the trial pile programme for the Birmingham International Convention Centre. In addition, trial piles have been tested on two other sites in central Birmingham

    Jan 1, 1989

  • DFI
    Application Of Deep Foundation Structures To Great Bridges In Vietnam

    By Cau T. Bui

    Thanks to Doi-moi (renovation) policy, many great bridges were constructed in Vietnam to meet demands of her booming economy in the recent decade and deep foundation structures were the only alternati

    Jan 1, 2008

  • DFI
    Innovations in Mass Stabilization for Ground Improvement and Environmental Remediation

    By Charles M. Wilk

    "Mass stabilization (MS) is a ground improvement technique that can prepare areas of low bearing strength soil for subsequent infrastructure development. The technique involves mixing binding agents s

    Jan 1, 2015

  • DFI
    Construction of Jacking Pits in Boston’s Central Artery/Tunnel Project

    By Arturo Ressi di Cervia

    "The Construction of the Thrust Pits for Jacking of the I-90 Tunnel for the Central Artery/Tunnel Project (Part of Contract No. C09A4) in Boston MA was nominated for DFI’s 2002 Outstanding Project Awa

    Jan 3, 2003

  • DFI
    Load Tests On Large Diameter Bored Piles In Cemented Sands

    By Nabil F. Ismael

    Load tests were carried out to examine the ultimate bearing capacity of short, large diameter bored piles in connection with the construction of a multistory building on the Arabian Gulf in Kuwait.

  • DFI
    Dynamic Load Testing Of Augered Cast-In-Place Piles (Rausche)

    By Frank Rausche

    The more widespread use of Augered Cast-in-Place (ACIP) Piles has generated increased demand for improved quality control measures. These deep foundation elements are often relatively long and slender

    Jan 1, 2001

  • DFI
    Augered Cast-In-Place Pile Installation, Grand Forks, North Dakota

    By Kyle A. Kershaw

    The City of Grand Forks, North Dakota obtains drinking water from both the Red River and Red Lake River through a system of raw water intakes, shallow pipelines, and pump stations. However, during flo

    Jan 1, 2003

  • DFI
    Safe Load Of A Single Pile In Earthquake Loading - Synopsis

    By Shamsher Prakash

    Estimation of vertical load carrying capacity of a single vertical pile under earthquake loading is an important task of a design engineer. Lateral vibration of vertical pile is highly influenced by t

    Jan 1, 1996

  • DFI
    Optimization of Deep Foundation Design in a Sand, Gravel and Cobble Formation - Using Pressuremeter Testing In Slotted Sleeve Casing (8ff70823-b892-4925-865f-fae636443d0f)

    By Emad Farouz, Roger Failmezger

    "The proposed reconstruction of I-75 downtown consists of widening an approximately 2.46 Km section of IR-75 through the northern section of downtown Dayton, OH, USA. Bridge B-13 is a 9-span continuos

    Jan 1, 2007

  • DFI
    Very Deep Piling For The Highrise ‘De Zalmhaven’ In Rotterdam (Nl)

    By Ed Revoort, Robert Schippers

    In Rotterdam in the Netherlands the project ‘De Zalmhaven’ is being developed. The project consists of the realization of houses, parking facilities, two residential towers of 70 m and a residential h

    May 1, 2022

  • DFI
    The Geo-Impuls Programme: Towards Reducing Geotechnical Failure in the Netherlands

    By Paul M. C. B. M. Cools, Martin Th. van Staveren

    In 2010, the 5-years joint industry programme Geo-Impuls started in the Netherlands. The ambitious goal of this programme is to reduce geotechnical failures in our civil engineering projects by half i

    Jan 1, 2017

  • DFI
    Surprises And Solutions When Driving Piles In Mountain Valleys Of Vermont

    By John E. Lens

    Driving bridge foundation piles into glacio-fluvial sands and gravels and glacial tills brought surprisingly longer than predicted driving lengths on several recent projects in Vermont. In some insta

    Jan 1, 2007

  • DFI
    Non-Braced And Non-Anchored Diaphragm Walling In Soft Soil ? Synopsis

    By D. Y. Peng

    A Large Sub-structure with open top of S.Y.P. float line requires a 90m x 50m in plan and 13m-deep excavation in soft soil, Shanghai. The geological conditions in site are rather severe. The technolog

    Jan 1, 2010

  • DFI
    Risk Management and Ground Improvement Technologies in the Case of Liquefaction

    By Sebastian Fischer, Rolf Katzenbach, Steffen Leppla

    "The risk management in the case of liquefaction is one of the most serious and also difficult issues in geotechnical engineering because failure caused by liquefaction is always a sudden failure with

    Jan 1, 2015

  • DFI
    Caisson Foundations For Mississippi River Bridges In The New Orleans Area

    By William B. Conway

    This paper will describe the large caisson pier foundations for four of the bridges crossing the Mississippi River in the New Orleans area; and will discuss some of the unusual problems encountered du

    Jan 1, 2013

  • DFI
    Construction Of Foundations For Zuari, Mandovi Railway Bridges In Goa ? Synopsis

    By N. V. Nayak

    Konkan Railway Project is one of the most ambitious railway construction projects in India, involving construction of a 760.km long, Broad Gauge (1676 mm), single track railway line, connecting Roha i

    Jan 1, 1996

  • DFI
    Experiences From A Large Scale Driven Precast Piling Project In India

    By Rajesh A. Vaidya

    A large scale piling work is undertaken in India for an important fast track industrial project. Thousands of solid square precast concrete piles are driven to depths of around 50m. Soils encountere

    Jan 1, 2007

  • DFI
    Lateral Load Tests on Step Tapered Bored Piles in Calcareous Sands

    By Nabil F. Ismael, Mohamed El Deeb

    "The behavior of laterally loaded step tapered bored piles in calcareous sand was examined by field tests. Lateral load tests were carried out on straight and step tapered bored piles 5.3 m long embed

    Jan 1, 2005

  • DFI
    Calibration of the Gates Pile Driving Equation for LRFD in Louisiana

    By Glenn J. Rix, Eduardo Tavera, Raphael Siebenmann, Zhongjie Zhang, Robert C. Bachus, Jongwon Jung

    "The Louisiana Department of Transportation and Development (LADOTD) uses a variation of the FHWA-modified Gates equation to verify the nominal pile bearing resistance, typically on smaller projects w

    Jan 1, 2017

  • DFI
    Innovative Methods Of Dealing With Contaminated Soils In Drilled Shafts - Synopsis

    By William F. Loftus

    When high capacity diameter pipe piles are driven open-ended into the underlying bedrock, the material gathered inside the pipe often must be excavated to allow concrete to be placed within, in a clea