Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction Approach

    By M. D. Riegel, P. B. Pizzimenti, E. M. Zamiskie, Britain A. Materek

    "The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB

    Jan 1, 2016

  • DFI
    Construction of a Deep Slurry Cutoff Wall for the Sacramento River East Levee Program

    By Louay Owaidat, Daniel Jabbour, Allan Frappier, Jose Gomez, Mark Stanley, Tino Maestas

    The U.S. Army Corps of Engineers (USACE) is implementing a levee strengthening program along the Sacramento River East Levee (SREL) designed to correct 11 miles of deficient levees as identified by re

    Sep 8, 2021

  • DFI
    Impact Of Clay On Early Jet Grouting Strength

    By Debra F. Laefer

    Jet grouting is a ground improvement technique that has become widely adopted over the past three decades, yet relatively little data has been published about performance characteristics of mixes unde

    Jan 1, 2009

  • DFI
    Rock Socketed Drilled Shafts for the Goethals Bridge Replacement

    By John P. Turner, Steven S. Dapp, Dan A. Brown

    "The Goethals Bridge Replacement (GBR) spanning the Arthur Kill Waterway between Elizabeth, NJ and Staten Island, NY consists of a dual-span 1,982.5-ft long cable-stayed bridge with approach spans of

    Jan 1, 2016

  • DFI
    Challenges Of Earthen Cofferdam In Deep Excavations For Waterfront Structures, A Case Study

    By Balasubramani M., Ramana P. V., Bairagi K.

    This paper is a case study of an earthen Cofferdam, constructed for a deep excavation at Intake location in river Aaundha, Maharashtra, India. A 12 m (39 ft) deep excavation was made to construct the

    Nov 1, 2022

  • DFI
    DFI Mission Executed Through Growth of Micropile Technology

    By Jim Bruce, Peggy Hagerty Duffy, Mary Ellen Large, Allen Cadden

    "Over the past 40 years, Deep Foundations Institute (DFI) has executed its mission “to bring together multi-disciplined individuals and organizations to find common ground and create a shared vision a

    Jan 1, 2017

  • DFI
    A Case History – Termination of Pile in Rock Based on Penetration Resistance for a Bridge across River Mandovi in Goa

    By Akshay Sakhuja, M. S. Karthika, R. Vignesh

    "The bridge across River Mandovi in Goa is a cable stay bridge structure proposed parallel, along existing bridges for regulation and reduction of vehicular traffic; the entire bridge structure is sup

    Jan 1, 2015

  • DFI
    Constructing Tsunami Walls with Pressed-In Sheet and Pipe Pile Combi-Walls

    By Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano

    The city of Naruto in the southwestern part of Japan is situated at the mouth of the mighty Yoshino River. An approximately 1,000m-long levee/bulkhead along one of the river’s tributaries in the city

    Sep 8, 2021

  • DFI
    “Trevi-Calatore”: Innovation in Cut and Cover and Tunneling for the Installation of Plunge Columns Aimed to Excavate Underground Structures through the Top-Down Method

    By Alessandro Bertero, Manuel Toniolo, Vincenzo Tirozzi

    "The installation of foundation elements (large-diameter Bored Piles or Diaphragm Walls) for the execution of underground works to be performed through the ""Top Down"" Technique (Stations, Car Parks,

    Jan 1, 2016

  • DFI
    Use of Enhanced Pre-Mixed Self-Hardening Grout for an Emergency Cut-Off Wall Intervention in West Africa

    By Maurizio Siepi, Bruno Vingiani, Claudio Asioli

    "The article describes an emergency rehabilitation intervention executed at Buyo Dam, in Ivory Coast, to intercept a significant water seepage occurring through the foundation of this zoned earthfill

    Jan 1, 2016

  • DFI
    Nicholson In The Neighborhood: Virginia’S North Hill Project

    By Dominic Ammon, Mark Rothbauer, Paul Landers P. E.

    Across the Potomac River from the location of the DFI47 Annual Conference (October 2022), in Alexandria, VA, two large permanent anchored walls with a decorative shotcrete face were recently construct

    Oct 1, 2022

  • DFI
    Construction of a Deep Soil Mixed Cut-Off and Retaining Wall in Richmond BC

    By Keith MacKay, John Carter, David Siddle, Fernando Faminia

    "The River Green Residential development, is located in the municipality of Richmond, BC adjacent to the Fraser River. Ground conditions at the site consisted of medium to fine grained alluvial sands

    Jan 1, 2016

  • DFI
    Urban High Capacity Deep Foundation Solutions in Sites with Complex History and Geology

    By Karen C. Armfield, Gisele R. Passalacqua, Joanna Smith

    New York City is an urban environment with a history spanning over 200 years. The coastline of New York has changed over the years. In the East River, old bulkhead and remnant of relieving platforms t

    Jan 1, 2019

  • DFI
    Signal Anomalies in Crosshole Sonic Logging Testing with a Case Study in Metro Manila

    By Benjamin B. Buensuceso III

    Crosshole sonic logging (CSL) is a popular quality assurance and quality control method used to examine the concrete quality of cast-in place deep foundations, though the evaluation of the results is

    Sep 8, 2021

  • DFI
    Lateral Stresses On Multilevel Tieback Walls

    By Liiban A. Affi

    The most difficult task of designing multilevel tieback walls for deep excavation support is the determination of lateral stresses. These lateral stresses act not only on the shored height, but also

    Jan 1, 2010

  • DFI
    Cyclic Degradation on Wind Turbine Foundations in Cohesive Soils

    By Yazen Khasawneh, Osvaldo P. M. Vitali, Mohammad Nassim

    Wind turbines are subjected to complex form of cyclic loadings with variable amplitudes and frequencies. The cyclic loading and the accumulation of plastic strains with the number of cycles will resu

    Sep 8, 2021

  • DFI
    The Need For Air Control In Down The Hole Hammer Casing Advancement Drilling

    By Frank J. Purcell

    “Down The Hole” (DTH) hammer drilling is often necessary to advance the casing during pile construction where the test bores have determined difficult drilling conditions with obstructions such as bou

    Nov 1, 2022

  • DFI
    Shaftcam: A Practical and Cost Effective Solution to Drilled/Bored Pile Hole Inspection

    By Sastry Putcha, Santosh Mummaneni, Avasarala Swamy

    "Inspection of bored pile hole bottom prior to placement of concrete is one of the most crucial element of foundation design and construction, especially for end bearing piles. Pile hole bottoms that

    Jan 1, 1900

  • DFI
    Overcoming Constructability Challenges for Drilled Displacement Pile Installation in Difficult Geology

    By A. Rod Kern, Michael A. McNicholas, Yaser Taheri

    Deep foundations were required for construction of an 18,000 ft2 (1,672 m2) 4-story office building and an adjacent 23,750 ft2 (2,206 m2) 5-story parking garage in Queens, New York due to an existing

    Jan 1, 2019

  • DFI
    Replacing Top Layer Of Soft Clay With Compacted Engineering Fill To Improve The Lateral Capacity Of Piles

    By Venugopal Bonani, Kumaran M., Thomas John

    Liquid storage tanks are usually located in nearshore or coastal regions with soil profiles containing thick layers of compressible soils. These storage tanks are usually of large diameter up to 90m a

    Sep 1, 2022