Collaborative Value Engineering Redesign - DFI 2020By Martin Mcdermott, Kevin Tehansky, Robert Ross, Jeffrey Goodwin
A foundation value engineering redesign is a collaboration between the project owner, original design team, general contractor, foundation contractor and redesign team. Without the acceptance and coll
-
Drilled Displacement Piles - An Innovative Alternative to Typical Steel Driven PilesBy Patrick Granitzki, Alicia Plinio, Janitha Batagoda, Peter Howell
The City of Newark is making a comeback with new mixed-use multi-storied Residential Development projects. The majority of developers tend to use driven H-pile deep foundation systems to support their
Sep 8, 2021
-
Session 27 "Grouted Cutoffs"By Trent Dreese
For critical velocities in gravel units we use Bush-Luckner, Sichardt, other empirical equations, and equations derived from laboratory experiments too. On the base of these, we compiled critical velo
Feb 10, 2003
-
Simulation Of Soil-structure Interaction With Sheet Pile And Retained SoilBy Clarissa Aguiar, Seok hyeon Chai, Thamer Yacoub, Sina Javankhoshdel
Sheet piles are used as an excavation support for soil retention. They are interlocked systems to form a wall for earth support along with anchors to provide an extra lateral support in excavations. T
-
TTMJ – The New System for Slurry (Diaphragm) Wall JointsBy Maurizio Siepi, Paul van Horn, John Coupland, Julian Crawley
"TTMJ is the acronym for the Slurry (Diaphragm) Wall Tension Track Milled Joint currently in development as part of the European Union's innovative and far-reaching Horizon 2020 initiative (FTI Pilot-
Jan 1, 2017
-
Stemmers Run Steel Sheet Pile Cofferdam And TrestleBy Jennifer Peirce Brandt
Project documents and the United States Army Corps of Engineers? permit for construction of the Stemmers Run Relief Wastewater Force Main across the Back River in Baltimore County, Maryland specified
Jan 1, 2008
-
Foundation Challenges And Innovative Solutions: The Wharf Phase 2, Washington, DcBy Aaron L. Sacks, David R. Good, Srinivas Yennamanda, Joseph K. Carey
Construction of Parcels 6 and 7, the second phase of The Wharf, began in 2019 and geotechnical construction was completed by December 2020. The overall project consisted of horizontal site, parks, and
Oct 1, 2022
-
Utilizing Real-Time Data and Statistical Analysis for Wet Soil Mixing: A Case HistoryBy Sunil Arora, Lisheng Shao, Chris Conkle
"The East Garden Grove - Wintersburg Channel located in Orange County, California, required upgrades along the levees to mitigate potential liquefaction and lateral spreading hazards. The Orange Count
Jan 1, 2015
-
Ground Freezing for Groundwater Cutoff at the Seattle Seawall Replacement ProjectBy Brenton Cook, Daniel Mageau, Larry Applegate, Aaron McCain
"Ground freezing was successfully used to create an impermeable barrier wall along 3,000 feet of the downtown Seattle waterfront as part of the Seattle Seawall Replacement Project. This $360 million r
Jan 1, 2016
-
Ground Improvement for Reclaimed LandfillsBy Steven E. Darnell, William W. Haasz, Brandon T. Buschmeier, Frederic Masse
"Landfills often cover expansive areas in locations where large building facilities or infrastructure is in high in demand after the land has been reclaimed. Most landfills have soil or fill propertie
Jan 1, 2017
-
Construction of the Tailings Storage Facility Freshet Management Embankment Cut Off Wall at Mount Polley MineBy Terry Eldridge, Keith MacKay, David Siddle, Luke Moger
On August 4th, 2014, a breach occurred in the Perimeter Embankment of the Tailings Storage Facility (TSF) located at the Mount Polley Mine, releasing approximately 10.6 million m3 of supernatant water
Jan 1, 2016
-
A Resilience Approach for Design of Earth Retaining Systems with Application on MSE WallsBy George Gazetas, Sissy Nikolaou, Fani Gelagoti, Irene Georgiou, Rallis Kourkoulis
"The need to shift geotechnical design from a “factor of safety” to a “performance based” design (PBD) approach has increased rapidly in the past years following examples from structural engineering.
Jan 1, 2016
-
Design of Grillage and Helical Pile Foundation for Limited Access Transmission LineBy Benjamin Jennings, Jason Herron
In the summer of 2016 Xcel Energy experienced a storm event that resulted in the collapse of approximately 8.5 miles of a 345 KV transmission line near Rogers, Minnesota. In design of the new transmis
Jan 1, 2017
-
Deep Compaction Using Vibratory Pile HammersBy Dennis Nottingham
The need for deep compaction of submerged granular soils has led to improvements in this area. In 1971, L.B. Foster Company personnel patented a method of deep compaction using a vibratory pile hammer
Jan 1, 2013
-
Secant Pile Barrier Wall Overlap, Thickness, and Position at the U.S. Army Corps of Engineers Wolf Creek Dam, Jamestown, KYBy Bernard B. Vannoy, Howard W. Gault, Ramesh Bobba
"Treviicos-Soletanche Joint Venture (JV) and the US Army Corps of Engineers (USACE) have installed a 3800-foot long, 275-foot deep and minimum 2-foot wide secant pile barrier wall at Wolf Creek Dam in
Jan 1, 2015
-
The Use of Controlled Modulus Column (CMC) Ground Improvement for Support of Large WarehousesBy Brandon T. Buschmeier, Sonia S. Swift, Michael P. Walker, Frederic Masse
"Ground improvement has undoubtedly become a cost-efficient and effective solution to support the development of poor soil sites. Ground improvement elements, such as Controlled Modulus Columns (CMCs)
Jan 1, 2017
-
A Tall Slender Tower Rises On Secant Piles and Drilled ShaftsBy Renzo D. Verastegui, T. C. Michael Law, Sitotaw Y. Fantaye, Alfredas Daugiala
"When completed, 520 Park Avenue will amend the Manhattan skyline and be one of the most prestigious high rise towers in New York City. The 52-story condominium building is located on a 60 by 100 feet
Jan 1, 2016
-
Sloping Rubble Marine Seawalls Founded on Soft Soil Improved by Stone ColumnsBy Eleonora Di Mario, Colin B. Turnbull, Matthew G. Mills, Chengbin Miao, Wilhelm S. Degen
"In the past decade, the ‘zero-dredge’ philosophy has become the preferred option for the formation of marine seawalls and reclamations, compared to the partially or fully dredged options, as this sol
Jan 1, 2017
-
Load Distribution for Underpinning System Using Inherent Rigidity of Concrete DamBy Rick Deschamps, Amanda Blank, Matthew W. Drewek, Michael P. Walker
The Prairie du Sac Dam, located on the Wisconsin River, northwest of Madison, Wisconsin, was constructed 1912-1914. The spillway is an Ambursen-type, consisting of a series timber pile supported pier
Sep 8, 2021
-
Cement Deep Soil Mixed Walls/Grout Plug for Groundwater Cut Off and Excavation Support at the Bart Warm Springs ExtensionBy Harry Schnabel, Mitchell L. Fong, Douglas R. Jenevein, Thomas S. Lee
"The Warm Springs Extension (WSX) is one of a series of projects that will eventually extend the Bay Area Rapid Transit System (BART) from Fremont to San Jose, California. A cut and cover tunnel was u
Jan 1, 2015