Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Study of interaction zone between aluminum and alumina under static and dynamic flow conditions

    By Y. Kocaefe, S. Afshar, D. Kocaefe, Z. Kunt, C. Allaire

    Interaction of aluminum with silica based ceramics Jose M. Soto, Jeffrey D. Smith, William G. Fahrenholtz. Department of Ceramic Engineering University of Missouri-Rolla Rolla, MO 65409-0330 USA ABSTR

    Jan 1, 2004

  • CIM
    Zinc Concentrate Drying at Noranda Mines Limited (Geco Division)

    By C. Barnett

    "The mill at Noranda Mines Limited, Geco Division in Manitouwadge, Ontario went into production in 1957 treating 3,500 tons per day of copper, zinc, silver, lead ore. It was not until 1964, however, t

    Jan 1, 1972

  • CIM
    Wesfrob’s Infra-Red Dryer Installation and Operation

    By K. Blower

    "Since there was no representative from Wesfrob Mines Limited, the information on their infra-red concentrate drying operation, which had been prepared by Mr. K. Blower, was presented by Mr, Dorland.

    Jan 1, 1972

  • CIM
    A knowledge-Based System for a Off-Line Optimization of Ball Milling Circuits

    By A. Farzanegan, D. A. Lowther, A. R. Laplante

    "Off-line optimization studies are often necessary to improve the efficiency of grinding circuits. These studies are primarily based on the mathematical modelling of processing units (e.g., ball mills

    Jan 1, 1997

  • CIM
    Continuous minicell test of collectorless flotation at Mattabi Mines Ltd.

    By M. Leroux, S. R. Rao, J. Kim, J. A. Finch

    "Continuous in-plant testing of collectorless Cu/Pb bulk flotation on Lyon Lake ore at Matlabi Mines Ltd. Was conducted using a portable circuit based on 5 L mini flotation cells. It is concluded that

    Jan 1, 1994

  • CIM
    Evidence for a Feeder Pipe and Associated Alteration at the Brunswick No. 12 Massive-Sulfide Deposit (6ba284c3-b619-4b87-9743-c3aba495d77c)

    By Wayne D. Goodfellow, William M. Luff, Steven J. Juras

    Brunswick No. 12 is a vent-proximal massive sulfide deposit that formed above a feeder pipe with associated hydrothermal alteration. Because of the replacement of bedded sulfides deposited above the h

    Jan 1, 1992

  • CIM
    A mille for a junior

    By Robert B. Parsons

    "The junior mining company's bank account is depleted, but there are high hopes for the company's property. Where to get the necessary development funds is a common problem facing many junio

    Jan 1, 1983

  • CIM
    Computer modelling limitations and new directions-Part 2

    By Simon Houlding

    "Part 1 (CIM Bulletin, August 1991) of this article identified the limitations of the traditional modelling methods and demonstrated the approximations and errors introduced by their application to co

    Jan 1, 1991

  • CIM
    Study on Stress Wave Propagation across an Artificial Rough Rock Joint using a Modified SHPB Apparatus

    By J. C. Li, Y. Zou, L. He

    "The effect of rock joints is significant in characterizing dynamic behaviors of discontinuous rock masses. To reveal the relation between the transmission coefficient and the contact situation of the

    Jan 1, 2015

  • CIM
    Bevcon·Mine

    By H. R. Kempthorne

    "The Property of Bevcon Mines Limited, including a recently acquired adjoining south group, occupies an area of 2,625 acres in northeast Louvicourt township, Abitibi county, Quebec. It is situated 17

    Jan 1, 1949

  • CIM
    Transitioning from Open Pit to Underground Mass Mining: Meeting the Rock Engineering Challenges of Going Deeper

    By K. Woo

    "With ever-increasing global demand for mineral resources, mining companies are considering developing deeper, more complex and lower grade ore bodies. Recent years have seen the transition from surfa

    Jan 1, 2015

  • CIM
    Digital InstrumentationSystems for Geotechnical Monitoring Systems

    By A. J. Hyett

    Due to the ongoing revolution in electronics and communications more cost-effective geotechnical instruments can be manufactured using digital technology. This new generation of digital instruments ha

    Apr 1, 2005

  • CIM
    The Quintette Coal Project Plant Design and Operational Experience

    By G. B. Bosworth, M. J. Lake, J. W. Hogg

    The Quintette Coal operation in northeastern British Columbia has one of the world's largest Preparation Plants, with a design capacity of 6.5 million tonnes per year of clean coal.This paper will dis

    Jan 1, 1987

  • CIM
    Effect of Zr and V Additions on Microstructure and Mechanical Properties of the AlSi10Mg Cast Alloy

    By Z. Zhang, X. -G. Chen, F. Breton, A. Arici

    "The microstructure of Al-10Si-0.3Mg-0.5Mn alloy with 0.27% Zr and 0.19% V addition was quantitatively analysed and compared to the base material. The addition of Zr and V in the AlSi10Mg alloy exhibi

    Jan 1, 2018

  • CIM
    The Influence of Quench Rate on the Mechanical Behaviour of AA6082

    By N. Sarmady, Mei Li, N. C. Parson, W. J. Poole

    "The mechanical behaviour of AA6082 is a function of the extrusion conditions and in particular, the quench rate after extrusion. It is well known that precipitation of Mg-Si phases on grain boundarie

    Jan 1, 2018

  • CIM
    Temporal Observations of the Geochemistry and Mineralogy of a Sulfide-rich Mine-tailings Impoundment, Heath Steele Mines, New Brunswick

    By J. L. Jambor, E. J. Reardon, E. C. Appleyard, J. A. Cherry

    Since the 1957 initiation of deposition of mill tailings at the Heath Steele mine, New Brunswick, periodic detailed studies of the tailings geochemistry and mineralogy have been conducted, thereby pro

    Jan 1, 1992

  • CIM
    Detailed OPEX Comparison of Modern Copper Smelting Technologies Using HSC-SIM Modelling

    By Ali Bunjaku, Lauri Pesonen, Hannu Johto

    It is well known that there are many ways to process copper concentrates into copper anodes using the pyrometallurgical route. All modern copper smelting technologies are fundamentally energy efficien

    Jan 1, 2019

  • CIM
    An Approach to Assess and Control the Flotation of Minerals – Semiconductors

    By V. Panayotov, M. Panayotova

    "Finding a reliable relationship between fundamental properties of minerals of non-ferrous metals and their ability to float is extremely important. The approach presented in this work allows us to dr

    Jan 1, 2016

  • CIM
    Crusher and inclined conveyor system at Detour Lake Mine

    By P. Hansman

    "Place Dome Canada's Detour Lake Mine is a low-grade gold producer located in northeastern Ontario. Production is targeted for 2850 tonnes of ore per day. As reserves and mining areas continued t

    Jan 1, 1995

  • CIM
    Exposition of Applications of Uncertainty Quantification to Modeling Pyrometallurgical Processes Using a Model of Copper Fire Refining as an Example

    By P. E. Mather, M. J. M. Krane

    Uncertainty quantification is a means of articulating the reliability of model estimations. Models of copper pyrometallurgical processes have been published for decades but discussion of their reliabi

    Jan 1, 2019