Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A dry milling process for the production of ground mica

    By Jacque Turgeon, Gontran Foy

    "The Mineral Research Centre of the Quebec Department of Energy and Resources has worked extensively on the development of a dry process to extract pure mica flakes from a phlogopite ore. The liberati

    Jan 1, 1982

  • CIM
    Dragline Gearbox Filtration: The Proven Solution

    By Paul Clayton

    Case Study ? Site: BMA Saragi Coal Mine Queensland Australia ? Model: Marion 8050 ? YOM: Mid 1970s ? Boom: 97M ? Bucket: Original capacity of 100 Tonnes upgraded to 125 tonnes at time of filtrati

    May 1, 2008

  • CIM
    Prototype Test Results & Data Analysis

    The cost benefits of controlling dilution of extracted ore have been very well understood by miners and mining professionals for many years. However, as we strive towards more mechanization, the dilut

    May 1, 2009

  • CIM
    Estimating the Geometry of Conjugate Veins

    By Margaret Armstrong, Chris Roth

    Abstract -Estimating ore reserves for vein type deposits is a two-stage procedure: first, calculate the geometry of the vein system, and second, estimate the grades within this system. The grade estim

    Jan 1, 1998

  • CIM
    Treatment of Gold Mill Effluents for Removal and Recovery or Destruction of Cyanide -A Summary of the Joint Project with Six Gold Mills

    By G. M. Ritcey, V. M. McNamara

    "In the processing of gold ores by the cyanidation route, effluents which are discharged to the tailings areas can contain up to several hundred parts per million of cyanide in complex combination wit

    Jan 1, 1978

  • CIM
    The Highmont Concentrator

    By C. V. Sibbald

    "This paper provides a description of the Highmont copper-molybdenum concentrator from primary crushing through grinding, flotation, tailings disposal and water reclamation. The unique features of the

    Jan 1, 1981

  • CIM
    Application of computer-based core logging to the Sustut copper deposit, north-central British Columbia

    By D. H. Wilton, C. I. Godwin, A. J. Sinclair

    "A computer-based drill core logging system used to examine computer-based drill core logging system used to examine copper mineralization hosted in volcaniclastic rocks at the Sustut deposit, in nort

    Jan 1, 1980

  • CIM
    Process for the recovery of niobium oxide from pyrochlore concentrate

    By G. Gabra

    "A process of leaching niobium oxide from pyrochlore concentrate using hydrofluoric acid is described. Variables such as acid concentration, temperature, reaction time, solid/acid ratio, agitation spe

    Jan 1, 1985

  • CIM
    Dynamic Tests of a New Type of Energy Absorbing Rock Bolt ? The D Bolt

    By C. C. Li

    The D bolt is a new type of energy-absorbing rock support element recently developed in Nor-way. The D bolt is not only able to accommodate large rock deformations, but can also provide a load-bearing

    May 1, 2009

  • CIM
    Dilution measurement and control at Lupin Operations, N.W.T.

    By P. D. Soares, H. R. Bullis, R. A. Hureau

    "Echo Bay's Lupin Operation has produced more than 2.15 million ounces of gold since start-up in 1982. The mining method used to the£ present time has been longhole open stoping using trackless e

    Jan 1, 1994

  • CIM
    Simulation as a Tool to Enable World’s Best Mill Relining Practice (aafeded2-af45-4edf-b535-58771fc04187)

    By Peter Rubie

    "For many years, optimising the relining of hard rock grinding mills has been complicated by:?? the large number of variables;?? the low frequency of relines (slow feedback loop);?? the potential econ

    Jan 1, 2012

  • CIM
    Truck Shovel User Group

    Purpose of TSUG Continuous Improvement in Mining Share Best Practises Exchange Ideas Network for Frontline Supervisors and Middle Management Meetings ? Two per Year -Spring and Fall ? Thirt

    May 1, 2010

  • CIM
    Case study of a hoisting facility upgrading

    By D. C. Brady

    "Within six months from award of a project management contract, Les Mines Dumagami Limitée, Cadillac, Quebec, was operating its new hoisting facility. This was accomplished with less than a six-week s

    Jan 1, 1991

  • CIM
    Ontario and the mineral filler industry

    By G. Robert Guillet

    "Ontario enjoys the advantage of its proximity to the large industrial market of northeastern North America. Together with Quebec and fifteen nearby U.S. states, an industrial base of more than half t

    Jan 1, 1987

  • CIM
    A modified accumulator method for measuring surface radon flux from a uranium tailings pile

    By T. P. Lim, N. K. Davé

    "A modified accumulator method was devised to measure surface radon flux from porous media. It consists of a collector hood type of accumulator with a homogenizer pump and a pressure balancer. The lat

    Jan 1, 1982

  • CIM
    Gold exploration using tills of the Beardmore-Geraldton area, northern Ontario

    By Fridrik J. Kristjansson, Stephen R. Hicock

    "Three varieties of till are recognized in the Beardmore-Geraldton area: local lodgement till, nonlocal carbonate till, and local supraglacial till. The local lodgement till unit is examined in detail

    Jan 1, 1989

  • CIM
    Gold-bearing veins around a felsic stock near Wawa, Ontario: implications for gold exploration

    By P. A. Studemeister

    "A trondhjemite stock intrudes a volcanic sequence that has massive sulphide lenses and that is metamorphosed to the greenschist facies at Gutcher Lake, 25 km north of Wawa, Ontario. The stock is 4 km

    Jan 1, 1985

  • CIM
    A preview of things to come?

    By Robert D. Brown

    "The Conservative Government 's budget proposals brought forward on December 11, 1979 have been withdrawn, but they are far from dead. On the contrary, a number of those budget proposals, especia

    Jan 1, 1980

  • CIM
    Development of a Water Quality and Stability Index for DC Casting Process

    By G. Girard, A. Larouche, J. Colbert, G. Doyer

    "The Direct Chill (DC) casting process uses water to extract heat from molten aluminium and helps to control the solidification process. Many factors such as the water flowrate, water distribution ar

    Jan 1, 2016

  • CIM
    Linking Flotation Metallurgical Performance to Bubble Size

    By Jose R. Hernandez-Aguilar

    "This paper revisits data from previous studies (Hernandez-Aguilar, 2010, 2011) to better understand the link between metallurgical performance and bubble size (Db) in the collection (pulp) zone of fu

    Jan 1, 2016