Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Towards a Worldwide Network of Education in Mineral EngineeringBy Hans de Ruiter
"Delft University of Technology, RWTH Aachen, Helsinki University of Technology and Imperial College established the Federation of European Mineral Programs (FEMP) in 1999 as a legal body to coordinat
Jan 1, 2004
-
Investigating Total Media WearBy Peter Radziszewski
"Comminition process costs, which typically represent an important contribution to mining operating costs, can themselves be divided roughly between energy and liner /charge wear. As such, developing
Jan 1, 2001
-
La Fabrication de fer Préréduit Pour Utilisation au Four à Arc ÉlectriqueBy A. H. Marquis
Since the start-up of its first Direct Reduction Module in April 1973, S1DBEC has produced over 2 million tons of prereduced iron. During this period, SIDBEC has acquired comprehensive experience in t
Jan 1, 1979
-
The Cigar Lake project — Mining, ore handling and millingBy 12670
The Cigar Lake project will develop the world’s second largest high-grade uranium deposit. The Cigar Lake Phase 1 orebody contains approximately 226 million pounds U3O8 at an average grade of 20.7% U3
Jan 1, 2004
-
Red Lake Gold Mine Autoclave Optimization ProjectBy K. K. Murray, D. G. Gelderland
"The pressure oxidation autoclave at the Goldcorp’s Red Lake Gold Mines (RLGM) was commissioned in 1991. Since commissioning, the circuit has been well maintained and its capacity increased to mechani
Jan 1, 2017
-
Grinding Circuit Final Grind Control at Agnico Eagle Meadowbank MineBy Pathies Nawej Muteb, Tom Strombotne, Karl Leetmaa, Irma Gabric, Keith Darby
"Continuous control of the final grinding product size is important to optimize gold liberation for Gold Milling operations. At Meadowbank Mine an on-line Particle Size Monitor has been employed succe
Jan 1, 2017
-
Advancing Sudbury Exploration with 3D ModellingBy D. Richardson
Presentation Objectives ?Demonstrate the utility of 3D modelling for visualizing exploration data ?Demonstrate the target generation ability of 3D model query methods Exploration Criteria -Example
May 1, 2006
-
Towards an Integrated Framework for Asset and Process Health Monitoring and Optimization on a Milling Circuit"In mining operations, it is widely accepted that strategies to drive operational goals must revolve around improving plant availability, reliability and process efficiency. In this paper, an integrat
Jan 1, 2014
-
Design, Implementation, and Commissioning of the Gibraltar Development Plan 3By S. A. H Tyrrell, R. Rotzinger
"Taseko Mines Limited recommenced operation of the Gibraltar copper-molybdenum mine in 2004 and embarked on series of development projects to modernize the mine and increase throughput capacity. The G
Jan 1, 2014
-
A Geomorphic Approach for the Design of Drainage Systems on Reclaimed Mine AreasBy Anil K. Beersing
Effective drainage systems are required for reclamation of mine-disturbed areas to control surface water runoff and avoid excessive erosion. For the conventional structural design approach, armouring
Apr 1, 2005
-
Flash Flotation Circuit Design Considerations"The first SkimAir flash flotation cell was installed in Outokumpu’s Hammaslahti Copper Concentrator in 1982 to prevent overgrinding of soft sulphides in the milling circuit. Since this first installa
Jan 1, 2017
-
Membrane Technology Applications in Mineral ProcessingBy Rory Cameron, Chuck Edwards
"Stringent environmental performance criteria and regulations, and the desire to minimize water use have made membrane-based treatment and separation processes an attractive option. This has lead to m
Jan 1, 2012
-
The Need to Innovate: Celebrate the Past....Look to the FutureBy Dominic Fragomeni
"The mineral processing industry has had a long history of innovation that is recognized but not often celebrated. These include significant advances in mineral measurement, testing, comminution, min
Jan 1, 2017
-
Ore pass database: Quebec underground metal minesBy J. -F. Lessard
Most underground mines rely on ore pass systems to ensure the transport of ore and waste. The design and operation of ore pass systems often rely on past experience, which is often anecdotal and at ti
Jan 1, 2006
-
The Removal of Iron-Bearing Silicate Minerals from a Hard Rock Lithium OreBy T. Gammatikopoulos, C. Gibson, M. Aghamirian
Lithium is an alkali metal found in brine deposits in the United States, Chile and Argentina, as well as in hard rock deposits in Australia and North America. In hard rock deposits, spodumene (LiAl(Si
Jan 1, 2017
-
Ingénierie de la maintenance, de la conception à l?exploitationBy Turcotte. Yves-Laurent
Notre conférencier, Monsieur Yves L. Turcotte, Vice-président et Directeur général chez Promaintech Novaxa est diplômé en génie industriel de l?Université du Québec à Trois-Rivières et détient une maî
Feb 1, 2008
-
Commissioning of a Brownfield CDS Plant: Victories and Pitfalls (48th Annual Canadian Mineral Processors Operators Conference)By N. Romani, R. Provost
"Commissioning of a circulating dry scrubber (CDS) plant was recently completed at an existing facility in Québec, Canada. The CDS plant treats the sulphur dioxide off-gas emitted from rotary kilns i
Jan 1, 2016
-
Optimization of open pit short- and long-range production schedulingBy Charle Pelley, Kosta Fytas, Peter Calder
"A computer model has been developed which is capable of evaluating alternative production schedules (long- and short range) of an open pit mine once the ultimate pit limits have been defined. The mod
Jan 1, 1987
-
Remarks Deposits ? on Some Sulphide Volcanic ExtrusivestBy G G. Suffel
T HESE remarks on the occurrence of strata-bound massive sulphide deposits are submitted be-cause the writer recently visited the principal Cyprus deposits (in January, 1965) and has also a back-groun
Jan 1, 1965
-
The Kemess Mines Ltd. Tailings Dam Construction Using Tailings Construction SandBy John Hoffert, Darren Colwell, Greg Tucker, Jeremy Kinch, Greg Rasmussen
"The Kemess Mine, a major producer of gold and copper, is located in north-central British Columbia. Kemess was brought into production in May 1998 by Royal Oak Mines. On February 11, 2000 Northgate E
Jan 1, 2004