Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Comparison of Open Circuit versus Closed Circuit SAG Milling at the Williams Mine

    By David Evans, David Barnes, Robert Raponi

    "The Williams Mine processes, on average, 6,450 t/d of gold bearing ore using two parallel grinding circuits, leaching and C.1.P., carbon stripping, electrowinning and refining. At present, each grind

    Jan 1, 1997

  • CIM
    Process Improvement Update at Brunswick Mine

    By Jodi Roberts, Curtis Deredin, Jean-Guy Paulin

    "Since the establishment of the Six Sigma quality improvement program in 2001, several projects have been successfully carried out in the copper-lead, zinc, copper separation, lead upgrading and bulk

    Jan 1, 2008

  • CIM
    Control System Performance Assessment-Best Practices

    By Michel Ruel

    "PID loops – also known as base layers or regulatory controls – form the foundation of any plant’s control layer and it is generally accepted that PID loop health has a direct impact on the plant’s bo

    Jan 1, 2011

  • CIM
    Estimation Errors for Gold Inventory in Large Carbon-In-Leach Tanks

    By Jr. Blanchette, Claude Bazin, Paul Blatter

    "Reporting of the gold production during a month implies to estimate the mass of gold that is processed by a mill, recovered as dorés, lost to the tailings and the change of gold inventory within the

    Jan 1, 2011

  • CIM
    Investigation on Efficiency and Wear with the LCM Centrifugal Mill

    By Peter Mitschke, Friedrich Rosenstock, Heinrich Meiler

    "The development of the Centrifugal Mill jointly by Chamber of Mines (Johannesburg) and LURGI GMBH (Frankfurt) had been described by L. Kitschen e.al. during the 14th IMPC at Toronto in October 1982.

    Jan 1, 1985

  • CIM
    Fleet management system for underground mines (dd9c7c45-cd77-4292-966a-863f63e39c89)

    By R. Grimard, M. Gamache, L. -P. Bigras, P. Cohen

    This paper describes a real-time fleet management system for an undergroun mine. Dispatching, routing and scheduling are handled simultaneously, taking into account the mine status, operational constr

    Jan 1, 2004

  • CIM
    An Investigation in the Stand up Time of Stopesat Birchtree Mine in Thompson, Manitoba

    By Matthew Violot

    Introduction ?Located off highway 6, approximately 5 km, SW of Thompson, Manitoba ?Base metal mine: Nickel? Maximum Depth: 4100 ft ?Started Production in 1966 (INCO, 2006)?Halted in 1978?Re-opened

    Nov 1, 2011

  • CIM
    The Echo Bay Mines Silver Mill

    By Graham A. Karklin

    "The Echo Bay Mines silver property is located 875 air miles north of Edmonton, Alberta. The mine is on the east shore of Great Bear Lake at Port Radium which is twenty six miles south of the artic ci

    Jan 1, 1981

  • CIM
    Technological Advances in Telecommunications for Mines

    By Patrick M. Y. Waye

    As mines utilise more automation in mining operations to improve efficiency and safety, a corresponding increasing demand is placed on the transport of information. Some of the recent technological ad

    May 1, 2001

  • CIM
    The Development of a Small-scale Test to Determine Work Index for High Pressure Grinding Rolls

    By Dave Bulled, Khiratt Husain

    "The use of High Pressure Grinding Rolls is gaining significant interest as a replacement for SAG milling in the comminution of hard rock ores because of the potential for reduced costs in terms of en

    Jan 1, 2008

  • CIM
    Operational Improvements in Seven Mineral Processing Plants by Increasing Grinding Circuit “Classification System Efficiency (CSE)”

    By Robert E. McIvor

    "“Classification System Efficiency (CSE)” is a powerful, emerging tool that can be used to increase grinding circuit efficiency. It is defined as the percentage of the ball mill energy being used to g

    Jan 1, 2013

  • CIM
    The Design of Instruction to Introduce a New Technology: A Case Study in Canadian Mineral Processing

    By H. D. Stolovitch, M. L. Lavallée

    "An engineering system used to analyze and improve the performance of industrial grinding circuits has been adapted into a training program. The systematic approach to the design of training was appli

    Jan 1, 1992

  • CIM
    A New Tool for Sag Hardness Testing

    By Glenn Kosick, John Starkey, Glenn Dobby

    "A practical new test has been developed for SAG hardness determination. Using two kilogram samples of minus one inch diamond drill core or crushed muck samples, the Starkey SAG Test has been shown to

    Jan 1, 1994

  • CIM
    A Novel Approach to Recover Precious Values from Low-Grade Canadian Ores

    By V. I. Lakshmanan, D. A. Mackie

    "1. INTRODUCTIONIn the past two decades, low-grade gold and silver ore bodies in the United States have been exploited by heap leaching, primarily with sodium cyanide solutions. This method has proven

    Jan 1, 1989

  • CIM
    Flotation at Les Mines Selbaie

    By Adam Wright

    "Les Mines Selbaie have been producing copper and zinc concentrates from the A-1 ore zone since 1986. This paper reviews major developments in flotation practice over that period. Firstly, ore blendin

    Jan 1, 1995

  • CIM
    Development of AERO® MX3048 Promoter for MMG Sepon Concentrator, South Central Laos

    By Tony Moore, Peter Riccio

    "MMG (Minerals and Metals Group) operates the LXML Sepon’s mineral processing facility located 40 kilometers north of the town of Sepon, in the Savannakhet Province, Lao PDR. The Sepon copper plant pr

    Jan 1, 2011

  • CIM
    CIP - Who Needs It? A combination circuit of Gravity, Flotation and Intensive Leach may provide the Optimal Environmental and Cost Outcome for Gold Plants.

    By Garry Johansen, Andrew McCallum, Sandy Gray, Gary Patrick, Jennifer Abols

    "The authors challenge the traditional thinking that whole ore cyanidation followed by Carbon in Pulp (CIP) or Carbon in Leach (CIL) should be applied as a standard process in the majority of gold pro

    Jan 1, 2003

  • CIM
    Crystallex’s Las Cristinas gold project

    By J. R. Goode

    "The Las Cristinas deposit in Venezuela contains reserves of 12.8 million ounces of gold at a grade of 1.20 g/t (Crystallex, 2004). The deposit comprises fully oxidized saprolite (SAPO) overlying a la

    Jan 1, 2005

  • CIM
    CIM 2011 - Process Development for Primary and Weathered Ores at the London Mining Marampa Iron Ore Project, Sierra Leone

    By Peter Dunn

    London Mining Plc. is developing an iron ore project in Sierra Leone. The Marampa mine is a brownfield development effort, having been operated by others since the 1930?s until low iron ore prices for

    May 1, 2011

  • CIM
    Biological Preoxidation Leaching for Refractory Gold and Silver

    By R. W. Lawrence

    "Biological leaching can be used to enhance the recovery of gold and silver from refractory ores, concentrates and tailings. The method liberates precious metals associated with sulphide minerals such

    Jan 1, 1985