Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Network Analysis of Pre Development Regulatory Procedures

    By Hughes DC

    Coal development in New South Wales can involve a complex series of government approvals, a requirement that results from the coincidence of many development sites with environmentally sensitive ar

    Jan 1, 1983

  • AUSIMM
    Land Reclamation Trials and Practices at Martha Hill Gold Mine, Waihi, New Zealand (81918f20-43ae-4806-8567-9e3a20ae8542)

    By Gregg PEH, Stewart RB

    Reclamation field trials commenced in 1985, two years before the granting of the Mining Licence. The level of pasture production on varying soil depths (0 cm, 5 cm, 15 cm and 25 cm) overlying both ta

    Jan 1, 1995

  • AUSIMM
    Some Concepts of Stack Injection

    By Collins BJ

    Basic principles of stack injection are outlined and supported by calculations of thermal, chemical and aerodynamic requirements of an ideal 4000 tpd furnace. Calculated results show that these requi

    Jan 1, 1975

  • AUSIMM
    Beyond the Mine Gate - The Issues

    By Collins L

    The commercial success of a mining project can be strongly influenced by the business activity which takes place away from the mine site. The project revenue is determined by marketing success whic

    Jan 1, 1997

  • AUSIMM
    Leaching of sulphated calcine

    Fluid bed sulphation roasting followed by leaching at low pH was developed as a means of separating copper and bismuth from a mix- ture of flotation concentrates and flash fur- nace flue dust. A 65

    Jan 1, 1986

  • AUSIMM
    Environmental Optimisation : Gaining Values from the Environmental Approvals Process

    The resurgence of mining over the last 30 years has coincided with a growing awareness in the community of the importance of environmental protection and conservation. This involves a growing conce

    Jan 1, 1991

  • AUSIMM
    Engineering of a Modern Coal Preparation Plant

    The detailed engineering of a coal preparation plant is important from the point of view of optimum constructibility, operational security, ease of maintenance, operating costs, meeting environment

    Jan 1, 1982

  • AUSIMM
    Technology and Equipment for X-Ray Radiometric Sorting of Secondary Metallic Raw Materials

    By Satayev IS, Shepelev DV

    Various ways for applying the X-ray fluorescent method to process lump-by lump separation of secondary aluminium raw materials (scrap, slags, waste) as well as ferrosilicon and ferrochromium are bei

    Jan 1, 1993

  • AUSIMM
    Copper Tank House Technology Reviewed and Assessed

    The present practices in electro-refining of copper are shown to be the result of piecemeal and gradual improvements and innovations as metallurgists responded to changing cost pressures and the avail

    Jan 1, 1985

  • AUSIMM
    Conceptual Planning For The Expansion Of Primary Steelmaking At New Zealand Steel Limited (The Aus. I. M. M. Conference, New Zealand, May 1980)

    By C. P. BATES

    In November 1969, New Zealand Steel Ltd pioneered the commercial use of the SL/RN solid fuel direct reduction process to make sponge iron as a feed material for electric arc furnaces. Serious proc

    Jan 1, 1980

  • AUSIMM
    A New Future at HBMS - The 777 Project

    The paper describes the $US240 million expansion at Hudson Bay Mining and Smelting Co LimitedÆs operations in Canada. The company has been continuously producing copper and zinc from local area mines

    Jan 1, 2000

  • AUSIMM
    The Regulatory Environment for Expert Reports NCSC and ASX Requirements

    I stand here as a financial advisor who has been particularly close to the whole concept of reporting, independence and all the issues that are brought together in Release 149. However, I was asked

    Jan 1, 1989

  • AUSIMM
    Comminution Research - A Success Story that has not yet Ended

    Some fundamental aspects of recent single-particle fracture studies are reviewed. Findings from this research shed new light on the utilisation of energy during comminution operations and provide us

    Jan 1, 1993

  • AUSIMM
    Excavation Design and Ground Support of the Gyratory Crusher Installation at the DOZ Mine, PT Freeport Indonesia

    By A Mulyadi, J Barber, R Golden

    The Deep Ore Zone (DOZ) underground mine will be a 25 000 tpd mechanised block cave operation starting production in 2000. The ore handling system consists of a direct truck dumping 54 +74 gyratory cr

    Jan 1, 2000

  • AUSIMM
    Pelletisation of Coal Fines: An Experimental Study

    Modern mining and coal cleaning techniques lead to the generation of large quantities of fines which give rise to problems in their storage, handling, transportation and further processing. Pelletisat

    Jan 1, 2000

  • AUSIMM
    Adsorption of Organic Dye Depressants on Carbonaceous Sulphide Ores

    Organic dyes such as nigrosine and sun yellow act as depressants for carbonaceous particles in the, flotation of sulphide ores. Depression is achieved when initially hydrophobic organic surfaces are

    Jan 1, 1975

  • AUSIMM
    Process Control Developments at Queensland Alumina

    The completion of the 3rd expansion at Queensland Alumina added 725,000 t.p.y. capacity to what was already the world's largest alumina refinery. Rated design capacity is now 2.0 million t.p.

    Jan 1, 1974

  • AUSIMM
    An Expert Neural Network to Control a Mineral Flotation Process

    By Durao F

    A multi-layer feed-forward neural network was trained (using the error back-propagation algorithm) to learn a subset of rules designed to stabilise the performances of the copper flotation section o

    Jan 1, 1995

  • AUSIMM
    Monitoring Underground Diesel Emissions û Two Solutions

    Diesel-engine exhaust emissions represent a concern to the mining industry due to the poten- tially harmful health effects of the pollutants, as well as high costs associated with providing proper

    Jan 1, 1988

  • AUSIMM
    The Corex Process Hot Metal Production by Coal Reduction

    By Kepplinger W

    The COREX process is a technology for production of liquid hot metal on the basis of coal (without the use of a coking plant) developing by VOEST- ALPINE AG, Austria and its subsidiary company Kor

    Jan 1, 1987