Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Development of a Mathmatical Model of the Lead Flotation Circuit at the Zinc Corporation LimintedA static equilibrium mathematical model of the lead,flotation circuit at The Zinc Corporation Limited is developed to permit the feasibility of applying computer control techniques to be studied. The
Jan 1, 1964
-
Mining Equipment - Mine TransportationEQUIPMENT TO BE DISCUSSED It is the intention of this paper to discuss the transporting of large skid mounted equipment and track machines around open cut mines. By large I mean 100 to 350 tonne cap
Jan 1, 1989
-
Recoverable Resource Estimation - A Comparison Using Constrained and Unconstrained Geology Models - Anwia Gold DepositBy D Clarke, R Simpson
The Main lode in the Anwia Gold deposit is difficult to interpret due partly to the fact that three separate grid and drill hole orientations exist over the area and partly due to a lack of understand
Jan 1, 2006
-
An Integrated Neural Network and Machine Learning Model for Multi-Dimensional Mineral Resource AssessmentThe potential of the developed multi-dimensional analysis system to assist interpretation from large data sets through derived digital mapping models is presented accompanied by preliminary results.
Jan 1, 1995
-
Best practice sampling QA/QC for gold and base metal mining – including how to assess the applicability of underground reverse circulation grade control samplingBy J T. Carswell
Best practice mine sampling should provide a detailed quantification of all potential sources of error at each stage of sampling, sample preparation and assaying.Quality assurance (QA) should include
Sep 20, 2017
-
Panel Caving Scheduling Under Precedence Constraints Considering Mining SystemBy E Rubio, N Morales
Currently, mine plans are optimised by using several criteria as objective functions, like profit, life-of-mine, concentration of some pollutants, mining costs, confidence level or ore resources, with
Sep 26, 2011
-
Mercury Sorption on ClinoptiloliteBy K Friese, H P÷llmann
Clinoptilolites, modified with sodium, produced a material which has been tested for the ability to remove Hg (II) from aqueous nitric acid. The amount of adsorption depends on contact time, acid conc
Jan 1, 2008
-
Earthmover Tyre Operations at Coal and Allied's Hunter Valley No. 1 MineCoal production from Coal & Allied's Hunter Valley No 1 open cut is presently hauled 10 km by road to washing and train loading facilities at Liddell. This road haul, using bottom dump trucks
Jan 1, 1982
-
Geological Reserves - Cut-Off GradesThis is a philosophical paper. it discusses some of the concepts underlying the estimation of geological reserves and the determination of cut-off grades. It explores how they interrelate and how they
Jan 1, 1990
-
Computer aided core logging at Pasminco Broken HillThe geologists at the Zinc Mine in Broken Hill have developed a method of logging core using portable MS-DOS computers and LOTUS 123. The computer based logging system has almost halved both the time
Jan 1, 1990
-
Autogenous Grinding at CobarThe design of the grinding section is discussed and details are given of the equipment installed for the autogenous grinding of ores from the C.S.A. mine at Cobar.The first section of the concentrator
Jan 1, 1969
-
Development of Lancefield Panel StopingA combination of highly structured, fissile stope hangingwalls and high ground stresses have caused difficult mining conditions in the Main Lode Deeps at Lancefield Gold Mine. Cyclic reviews of grou
Jan 1, 1995
-
Mineralogical and Metallurgical Results at Pe±olesÆs Mining Operations, MexicoBy R Espinosa-G=mez
Industrias Pe±oles, S A de C V (Pe±oles) in Mexico, is a major silver producer. The Pe±oles mining division has eight operations and the flotation process in seven of them to concentrate the metal and
Jan 1, 2005
-
Management Systems and Employee Rosters - The Western Metals WayThe Lennard Shelf Operations owned by Western Metals Ltd evolved from the Cadjebut Zinc Lead Mine (BHP) in August 1994. Original production of 0.5 mtpa will rise to 2.0 mtpa at the end of 1998. Employ
Jan 1, 1998
-
How to Get Value Out of BenchmarkingBenchmarking of mining operations has been in vogue for a number of years: it seems teams are forever flying around the world to try to understand what other operations are doing. However, unless a be
Jan 1, 2003
-
Optimal Resource UtilisationBy D von Horn
Mineral sand orebodies are typically mined for their TiO2 content. Increasingly over the past 30 years, the major mineral focus has shifted from natural rutile to ilmenite and an acceptance that the l
Jan 1, 2001
-
Risk Based Closure Engineering for SustainabilityBy J M. Dwyer, S Williamson
Acceptable post-closure performance of decommissioned mining operations is a critical factor in persuading todayÆs environmentally conscious public that the mining industry will not continue to burden
Jan 1, 2003
-
Setting Plant CapacityThe optimum plant capacity for a new mine is usually based on empirical studies or ærules of thumbÆ, subject to confirmation by detailed scheduling of the proposed mining operation. The mining industr
Jan 1, 2002
-
Product Stewardship - A Mine ManagerÆs Guide to Business Risk ManagementBy J de Vries
Arthur Page, a past President of AT&T said:All businesses in a democratic society begin with public permission, and exist by public approval. Product stewardship in its most basic form is simply risk
Jan 1, 2006
-
Research and Application of Total Tailings Backfill at Zhangmatun Iron MineBy Wang Xia, Zhou Aiming, Shi Shengyi
Zhangmatun Iron Mine is situated in the suburbs of Jinan city, Shandong, China. Because of surface environmental constraints, no suitable site can be selected to dispose of mill waste. The full mill t
Jan 1, 1998