Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Research and Development in the Micron Research (W. A.) Solvent Procedure for Gold Elution from Carbon

    By Hinchliffe WD, Griffin A

    The desorption of gold from activated carbon is promoted by adding organic solvents to aqueous cyanide solutions. At 65-80¦ the elution of gold is fast and is not affected by water quality. The Micron

    Jan 1, 1984

  • AUSIMM
    using Simulation to Assess the Impact of Improvements in Drill and Blast on Down Stream Processes

    A simulation model of the load and haul process where the loader cycle has been subdivided into its individual components is used to consider the benefits derived from improved drill and blast metho

    Jan 1, 1998

  • AUSIMM
    Improving the Reliability of Machines and Systems Used in the Production Processes, Automation and Control Technologies.

    British Coal has made a practical progressive approach to improving the reliability of its mining equipment. Reliability must be addressed at the specification stage but does not end there and routine

    Jan 1, 1991

  • AUSIMM
    The Use of New South Wales Coals in Large Pulverised Fuel Fired Boilers for Power Generation Purposes

    The Electricity Commission of New South Wales is the largest single user of coal in the State, burning some 8.5 million tonnes during 1972-73. This coal is converted in power stations into electrical

    Jan 1, 1975

  • AUSIMM
    Chemical Compositions of Manganese Nodules - In Situ Microenergy Dispersive X-Ray Fluorescence (m-EDXRF) and Bulk Data

    By F Melcher, M Wiedicke, A Wittenberg

    Ferromanganese nodules form a specific category of widespread marine mineral deposits. The tremendous increase in metal prices during the last decade raised new economic interest in their exploration.

    Jan 1, 2008

  • AUSIMM
    An Investigation of the Impacts of the Blasts in A Mining Process Upon A Concrete Shaft Lining

    By Rozycki J

    The results of shaft lining monitoring gave rise to an investigation of cracks observed in the structure. An hypothesis was made that the cracks might be due to stresses caused by energy wave prop

    Jan 1, 1987

  • AUSIMM
    Underground Mining of Shallow-Dipping Orebodies in Australia ù Mechanised Updip Stoping Versus Transverse Retreat Panel Stoping

    By C J. Corbett

    Many underground mining methods rely on blasted rock moving under gravity to report to extraction points. Mining of orebodies dipping between 20 - 45 degrees poses a unique challenge for mining engine

    Jan 1, 2003

  • AUSIMM
    Paper No. 186. The Electrolytic Refining of Auriferous And Argentiferous Copper at Lithgow, in New South Wales.

    FOR some reason there is not any extensive literature in print on the electrolytic refining of copper, although the method is in general use in America and Europe. In Australia there are but three pla

    Jan 1, 1911

  • AUSIMM
    A Possible Origin of Pisolitic Iron Ore Deposits from Raindrops and Sheetwash in a Semi-Arid Environment

    Pisolitic iron ores (also known as channel iron deposits) are an important resource of medium-grade iron ore in the Hamersley Province of Western Australia. They are a special case of transported piso

    Jan 1, 2007

  • AUSIMM
    Possible Heat Stress Problems Associated with Underground Mining in the NT, with Particular Reference to Woodcutters Mine

    By Wetzeil N

    High ambient temperatures combined with high surface humidity in the north of Australia and, in particular, the northern areas of the Northern Territory can make underground workplaces relatively in

    Jan 1, 1994

  • AUSIMM
    On the Planning of Underground Storage of Stormwater and Mechanical Boring of Sewer Shield Tunnelling in Tokyo

    Tokyo Metropolitan Government designs the stormwater storage plans in underground, as a measure of flood control in completed urban district and improvement of combined sewarage system. This time,

    Jan 1, 1987

  • AUSIMM
    A Simulation Model of the Waste Handling System Proposed for the Lihir Project in Papua New Guinea

    By Ritter K-C, Sturgul J. R, Filess T

    The proposed Lihir open pit gold mine is located on Lihir Island in New Ireland Province, Papua New Guinea. The mine will be located within a volcanic caldera, part of which forms the adjacent Luise

    Jan 1, 1995

  • AUSIMM
    Application of the Proton Microprobe to the Partitioning of Platinum Group Elements in Sulphide and Oxide Phases

    By Ryan CG, Ramsden AR, Sie SH, French DH, Griffin WL

    Proton microprobe and electron microprobe analysis are being used in combination for in situ determination of the trace element contents of oxide, sulphide and silicate minerals in a sample of the

    Jan 1, 1989

  • AUSIMM
    Considering the effects of milling media and water chemistry in the flotation of selected base metal sulfides

    By S N. Nyoni, K C. Corin, C T. O’Connor

    Considering future water scenarios, as influenced by the increasing scarcity of water and the move towards sustainable process engineering etc, the closed water circuit becomes an important point of s

    Aug 24, 2022

  • AUSIMM
    A case study of technical, social and environmental challenges for a gold project development in Western Turkey

    By R Valenta

    Most developing projects face a range of technical and non-technical challenges, and examination of development histories can potentially provide insights into improved approaches to project developme

    Nov 21, 2018

  • AUSIMM
    Implementing A Safety Programme, or Changing Attitude in the Minds of Men - A Sign of the Times?

    Before any accident prevention and total safety programme can succeed, a safety concientiousness or attitude needs to be implanted in the employees' minds. Psycholog- ical and physiological con

    Jan 1, 1975

  • AUSIMM
    Vertical Zoning of Gold-Silver Tellurides in the Emperor Gold Mine, FIJI (b1896fb0-832e-4b16-ab7a-90456644fb33)

    An increase in the silver to gold ratio with increase in depth in the main ore shoot of the Crown-Crescent lode in the Emperor gold mine, Fiji, was found to be due mainly to vertical zoning of gold-si

    Jan 1, 1971

  • AUSIMM
    The use of High-Pressure, Water-Hydraulic (Hydropower) Technology in South African Narrow-Reef, Hard-Rock Mines

    By P D. Fraser

    This paper examines the new water-hydraulic (hydro powered) drill rigs that have been developed and proven in the last decade primarily in tabular, shallow-dipping, narrow-reef, hard-rock South Africa

    Mar 26, 2012

  • AUSIMM
    Sumps Aids The Broken Hill Proprietary Company Limited In Saxonvale Feasibility Study (4f6b06bb-7b16-41b9-9052-ce170d293140)

    By Kukla G. T

    A Seam deposit User oriented Mine Planning System (SUMPS) was developed by The Broken Hill Proprietary Company Limited (BHP) at its head office in Melbourne. It is one of the computer mine plannin

    Jan 1, 1980

  • AUSIMM
    Effect of Regrinding Conditions on the Flotation of Chalcopyrite and its Separation from Pyrite in the CleaneráStage

    By Y Peng, D J. Bradshaw, X Chen

    At NewcrestÆs Telfer gold mine, a strategy of regrinding pyrite rougher flotation concentrates has been proposed to increase gold recovery and reduce cyanide consumption in the CIL circuit. The regrin

    Oct 29, 2012