    Construction of the Seven Thousand Tonne per Day – Big Gossan Production Shaft

    By N Herault

    PT Freeport Indonesia recently completed preproduction development and construction of the Big Gossan underground copper and gold mine, located in the Ertsberg mining district of Papua, Indonesia. Pro

    Mar 21, 2011

  • AUSIMM
    Optimisation of Ok Tedi's Medium-Term Production Schedules Using the Life of Business Optimisation System (LOBOS)

    By D Horacek, I K. Sheppard

    Ok Tedi is in a period of transition. By 2008 mill feed will consist of higher levels of high-grade but metallurgically challenging skarn ores. Additionally, the Taranaki pit will start production in

    Jan 1, 2007

  • AUSIMM
    Particle Density Meter

    By R Nicholson, N D. Cox, N W. A Lambert

    "This paper reports on the long-term operation of a particle density meter (PDM) at the Bloomfield coal handling and preparation plant (CHPP). This unit has been operating continuously for over three

    Oct 10, 2016

  • AUSIMM
    Getting the Most out of Technology to Drive Mine Productivity Improvements

    By K Sommerville, J Parkinson

    "Open pit mines today have more technology and data available. The challenge is to effectively use resources to analyse and identify mine productivity improvements. AMC Consultants Pty Ltd (AMC) has c

    Nov 15, 2016

  • AUSIMM
    Design and Construction of the Access Tunnels for the New Top Ryde City Shopping Centre, Northern Sydney

    By Q Yang

    This paper describes the design and construction of three 7.2 m span access ramp-tunnels to the three level underground car park of the newly redeveloped Top Ryde City Shopping Centre in northern Sydn

    Mar 8, 2011

  • AUSIMM
    Advanced Ventilation Control – An Analysis of Innovation and Environmental Sustainability

    By V S. Mutton, M J. Shearer

    "The current economic challenges faced by the mining industry led to a review of options for reducing the cost of ventilation control devices (VCDs). The VCDs at the Mount Isa Mines site operated by G

    Aug 31, 2015

  • AUSIMM
    Understanding Ore Characteristics and Equipment Selection

    By K T. Broekman, R L. Koenig

    "The Braemar Iron Formation is atypical ore when compared to the current magnetite ores being processed. In attempting to process and economically recover the vast quantities of iron ore stored within

    Aug 12, 2013

  • AUSIMM
    Simulation of Flotation Feed Pre-Classification

    By J Arola, B Kettunen, W M. Bond

    Separation of fine and coarse particles as separate streams prior to flotation, and their differential treatments, could substantially increase recovery and reduce collector consumption. A series of s

    Jan 1, 2005

  • AUSIMM
    Development of an acQuire Based Geotechnical Data Management System

    By V Pere

    A geotechnical data management system has been developed to manage drillhole and mapping data generated from in house and consultant administered field programs. This system comprises a data collectio

    Aug 22, 2011

  • AUSIMM
    Flotation launder design and the measurement of critical froth transport parameters

    By B Wong, R G. Coleman

    In flotation, the selection of the size, number and type of cell for a particular duty depends on two important factors. Firstly, the required flotation residence time and secondly, the physical const

    Aug 29, 2018

  • AUSIMM
    Now to the Future – A Path Toward the Future Mine

    By I Gipps

    Each of us has a vision of what the future mine will be and, generally, these visions have many similarities and some differences. One of the major discrepancies in visions of the future mine is not t

    Nov 22, 2011

  • AUSIMM
    Parametric assessment of tailings liquefaction and earthquake induced embankment deformations using FLAC

    By B Ghahreman‐Nejad, M Munro

    Design of embankment dams often requires seismic analyses, or an assessment of earthquakeinduced ground and dam movements. There are a large number of cases where earthquakes have triggered sliding an

    Jul 1, 2021

  • AUSIMM
    A Phased Approach to Test Programs to Meet Feasibility Study Requirements

    By E Williams

    The role and importance of a well designed test work program during the development of an orebody is often underestimated. A test work program should be tailored to deliver very specific answers to re

    Oct 5, 2011

  • AUSIMM
    Numerical Analysis of Extreme Deformation and Ground Support Performance at the N3500 Project

    The N3500 orebody is the northern continuation of the 3500 orebody at Xstrata Copper's Enterprise Mine and occurs at a depth of 1.3 to 1.8 km. At the nearby S3500 orebody, extreme deformation was

    Nov 25, 2010

  • AUSIMM
    Dredging fine tailings

    By S H. Burgmans, B Anderson

    This paper aims to define the specific challenges relating to dredging fine tailings from an above ground storage facility for transferral to a mined-out pit. In addition, it compares dredging and min

    Jul 1, 2021

  • AUSIMM
    Simulation Aided Engineering – Integration of Monitoring, Modelling and Planning

    By D Beck

    Open access to forecasts of mine geotechnical performance in the form of open databases of model results has been considered risky in the past, with a concern that the results will not be understood o

    Mar 21, 2011

  • AUSIMM
    Cover System Performance Monitoring for Tailings – Are We Doing It Correctly?

    By R Barritt, P Scott

    Across the globe, it is a common scenario that tailings storage facilities (TSFs) are being decommissioned; however, their subsequent impact on the local environment and landscape can often be overloo

    Jul 27, 2015

  • AUSIMM
    Taming the dragon – the art of transitioning from reactive to proactive tailings management through strategic operator engagement

    By C N. Hatton, K Ward

    Tailings operations are inherently reactive as operations personnel continuously contend with a concentrator reject feed (tailings) transient in physical and engineering properties, which places a con

    Jul 1, 2021

  • AUSIMM
    Washability modelling and estimation techniques used to improve coal handling preparation plant beneficiation

    By P J. Handley

    "Predicting how coal seams will be beneficiated through the coal handling processing plant (CHPP) has long been challenging within BHP Coal. Various coal seams from different areas are mined and stock

    Sep 20, 2017

  • AUSIMM
    Ventilation Upgrade at the FrogÆs Leg Mine - Case Study

    By A Llewellyn, M Varvari

    The ventilation circuit at the FrogÆs Leg Mine was originally designed to permit mining to progress down to 440 m below surface at a maximum production rate of 500 kt/a, as per the feasibility study.