Construction of the Seven Thousand Tonne per Day – Big Gossan Production ShaftBy N Herault
PT Freeport Indonesia recently completed preproduction development and construction of the Big Gossan underground copper and gold mine, located in the Ertsberg mining district of Papua, Indonesia. Pro
Mar 21, 2011
-
Optimisation of Ok Tedi's Medium-Term Production Schedules Using the Life of Business Optimisation System (LOBOS)By D Horacek, I K. Sheppard
Ok Tedi is in a period of transition. By 2008 mill feed will consist of higher levels of high-grade but metallurgically challenging skarn ores. Additionally, the Taranaki pit will start production in
Jan 1, 2007
-
Particle Density MeterBy R Nicholson, N D. Cox, N W. A Lambert
"This paper reports on the long-term operation of a particle density meter (PDM) at the Bloomfield coal handling and preparation plant (CHPP). This unit has been operating continuously for over three
Oct 10, 2016
-
Getting the Most out of Technology to Drive Mine Productivity ImprovementsBy K Sommerville, J Parkinson
"Open pit mines today have more technology and data available. The challenge is to effectively use resources to analyse and identify mine productivity improvements. AMC Consultants Pty Ltd (AMC) has c
Nov 15, 2016
-
Design and Construction of the Access Tunnels for the New Top Ryde City Shopping Centre, Northern SydneyBy Q Yang
This paper describes the design and construction of three 7.2 m span access ramp-tunnels to the three level underground car park of the newly redeveloped Top Ryde City Shopping Centre in northern Sydn
Mar 8, 2011
-
Advanced Ventilation Control – An Analysis of Innovation and Environmental SustainabilityBy V S. Mutton, M J. Shearer
"The current economic challenges faced by the mining industry led to a review of options for reducing the cost of ventilation control devices (VCDs). The VCDs at the Mount Isa Mines site operated by G
Aug 31, 2015
-
Understanding Ore Characteristics and Equipment SelectionBy K T. Broekman, R L. Koenig
"The Braemar Iron Formation is atypical ore when compared to the current magnetite ores being processed. In attempting to process and economically recover the vast quantities of iron ore stored within
Aug 12, 2013
-
Simulation of Flotation Feed Pre-ClassificationBy J Arola, B Kettunen, W M. Bond
Separation of fine and coarse particles as separate streams prior to flotation, and their differential treatments, could substantially increase recovery and reduce collector consumption. A series of s
Jan 1, 2005
-
Development of an acQuire Based Geotechnical Data Management SystemBy V Pere
A geotechnical data management system has been developed to manage drillhole and mapping data generated from in house and consultant administered field programs. This system comprises a data collectio
Aug 22, 2011
-
Flotation launder design and the measurement of critical froth transport parametersBy B Wong, R G. Coleman
In flotation, the selection of the size, number and type of cell for a particular duty depends on two important factors. Firstly, the required flotation residence time and secondly, the physical const
Aug 29, 2018
-
Now to the Future – A Path Toward the Future MineBy I Gipps
Each of us has a vision of what the future mine will be and, generally, these visions have many similarities and some differences. One of the major discrepancies in visions of the future mine is not t
Nov 22, 2011
-
Parametric assessment of tailings liquefaction and earthquake induced embankment deformations using FLACBy B Ghahreman‐Nejad, M Munro
Design of embankment dams often requires seismic analyses, or an assessment of earthquakeinduced ground and dam movements. There are a large number of cases where earthquakes have triggered sliding an
Jul 1, 2021
-
A Phased Approach to Test Programs to Meet Feasibility Study RequirementsBy E Williams
The role and importance of a well designed test work program during the development of an orebody is often underestimated. A test work program should be tailored to deliver very specific answers to re
Oct 5, 2011
-
Numerical Analysis of Extreme Deformation and Ground Support Performance at the N3500 ProjectThe N3500 orebody is the northern continuation of the 3500 orebody at Xstrata Copper's Enterprise Mine and occurs at a depth of 1.3 to 1.8 km. At the nearby S3500 orebody, extreme deformation was
Nov 25, 2010
-
Dredging fine tailingsBy S H. Burgmans, B Anderson
This paper aims to define the specific challenges relating to dredging fine tailings from an above ground storage facility for transferral to a mined-out pit. In addition, it compares dredging and min
Jul 1, 2021
-
Simulation Aided Engineering – Integration of Monitoring, Modelling and PlanningBy D Beck
Open access to forecasts of mine geotechnical performance in the form of open databases of model results has been considered risky in the past, with a concern that the results will not be understood o
Mar 21, 2011
-
Cover System Performance Monitoring for Tailings – Are We Doing It Correctly?By R Barritt, P Scott
Across the globe, it is a common scenario that tailings storage facilities (TSFs) are being decommissioned; however, their subsequent impact on the local environment and landscape can often be overloo
Jul 27, 2015
-
Taming the dragon – the art of transitioning from reactive to proactive tailings management through strategic operator engagementBy C N. Hatton, K Ward
Tailings operations are inherently reactive as operations personnel continuously contend with a concentrator reject feed (tailings) transient in physical and engineering properties, which places a con
Jul 1, 2021
-
Washability modelling and estimation techniques used to improve coal handling preparation plant beneficiationBy P J. Handley
"Predicting how coal seams will be beneficiated through the coal handling processing plant (CHPP) has long been challenging within BHP Coal. Various coal seams from different areas are mined and stock
Sep 20, 2017
-
Ventilation Upgrade at the FrogÆs Leg Mine - Case StudyBy A Llewellyn, M Varvari
The ventilation circuit at the FrogÆs Leg Mine was originally designed to permit mining to progress down to 440 m below surface at a maximum production rate of 500 kt/a, as per the feasibility study.
Jul 1, 2013