Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Design of raise caving operations in LKAB mines

    By T Ladinig

    Raise caving is a novel cave mining method, which has been proposed for mass mining at increasing mining depths in LKAB operations. The method makes use of the raise mining technology and an active st

    Mar 29, 2023

  • AUSIMM
    Improved assurance for Mineral Resource and Ore Reserve estimates and reporting through peer review and auditing

    By M A. Noppé

    Mining is inherently a risk-based business and risk governance is an integral part of corporate assurance and business decision-making. Mineral Resources and Ore Reserves are the key assets for a mine

    Sep 20, 2017

  • AUSIMM
    Drill hole spacing analysis for classification and cost optimisation – a critical review of techniques

    By J Levett, O Rondon, I Glacken

    Reporting Codes are not prescriptive on methodologies to report or classify Mineral Resource Estimation results, but the assessment of risk and uncertainty is required, and is likely to be increasingl

    May 24, 2023

  • AUSIMM
    How to Create a Perfect Storm

    By A Chadwick, J de Ross, C Adams

    Imagine a æshinyÆ new mine, $1 B in the bank and record commodity prices. So how does a company and its management team create enough tension to maximise profit and to establish a culture that can wea

    Nov 20, 2012

  • AUSIMM
    Raising the Simulator Training Bar - Strategies for Improved Work Performance and Effective Utilisation of Site-Based Simulators

    By P Wood, S Leveritt

    This paper will introduce some innovative strategies for simulator training that are intended to improve the level of safety and operational performance of heavy equipment operators. The key strategy

    Sep 18, 2012

  • AUSIMM
    Redefining Competent Persons Criteria for Resource Geologists

    By J Coombes

    There is much debate on the Competent Persons qualifying criteria for providing classified resource estimates for public reporting. The CRIRSCO family of codes including the JORC Code, SAMREC, PERC an

    Aug 18, 2014

  • AUSIMM
    Linking Mineral Resource and Ore Reserve classification with technoeconomic study levels and forecast relative accuracy

    By D Reid, J McKibben, M Noppe

    International mineral disclosure standards and guidelines aligned with the CRIRSCO (Committee for Mineral Reserves International Reporting Standards) template were developed to inform stakeholders abo

    Mar 22, 2022

  • AUSIMM
    Optimum Dig Lines for Open Pit Grade Control

    By I Treloar, T Elenbaas, E Isaaks

    Critical reviews of grade control generally focus on blasthole sampling and the estimation of ore control block model (OCM) grades, with little or no attention given to dig-line design. For example, t

    Aug 18, 2014

  • AUSIMM
    Modelling Blast Movement for Grade Control

    By O Handayani, R Barr, E Isaaks

    The mining industry has focused a great deal of attention recently on the impact of blast movement on grade control. Although the problem of blast movement and its contribution to dilution and ore los

    Aug 18, 2014

  • AUSIMM
    Is the Python Right for Me? Python

    Gekko Systems Pty Ltd have developed the Python Underground Processing Plant for the concentration of gold and sulfide ores. The Python plant has an established flow sheet including fine crushing, scr

    Aug 1, 2010

  • AUSIMM
    Optimisation of the Prominent Hill Flotation Circuit

    By P Woodward, T Ly, N Muhamad

    OZ Minerals' Prominent Hill copper-gold concentrator is located 650 km north-west of Adelaide in the Gawler Craton of South Australia. The concentrator was built in 2008 and commenced commercial

    Jul 15, 2013

  • AUSIMM
    Learning from and managing a significant saprolite instability

    By M Bouare, C Holland, K N’Diaye

    Two adjacent open pits in Mali hosted by deeply weathered saprolitic materials were mined consecutively over the course of approximately 12 months. During excavation, both pits experienced significant

    Jun 22, 2022

  • AUSIMM
    Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning Scheduler

    By D R. Seaman, R P. Tooher, B A. Seaman

    "Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove

    Oct 10, 2016

  • AUSIMM
    Fluorine Removal From Ok Tedi Copper/Gold Concentrates

    By J W. Glatthaar, M Mavotoi

    The occurrence of fluorine in the copper/gold concentrates produced by Ok Tedi Mining Limited has provided a series of challenges to metallurgists since 1988. Although fluorine is distributed througho

    Jan 1, 2003

  • AUSIMM
    Site Investigation and Design for Melbourne’s New Metro

    By H Asche

    The Melbourne Metro project has evolved from the Victorian Transport Plan. MM1 is the second major phase of the proposed separation of Melbourne’s radial railway system, creating a line that will oper

    Mar 8, 2011

  • AUSIMM
    Fibre-reinforced Geopolymer Concrete – An Innovative Material for Tunnel Segments

    By M Wieloch, D Wimpenny, M Chappell

    Fibre-reinforced geopolymer concrete (FRGC) contains no Portland cement or steel reinforcement, but instead uses synthetic fibre reinforcement and a geopolymer binder. The use of geopolymer binder in

    Sep 17, 2014

  • AUSIMM
    Preliminary Design for the Rockwater Power Project, South Island, New Zealand

    By H Asche

    The proposed Rockwater Power Project is a hydropower development on the Waitaki River in the South Island of New Zealand. The proposed development will have an installed capacity of 250 MW with a peak

    Mar 8, 2011

  • AUSIMM
    Metallurgical Performance Models to Improve Cut-Off Grade Determination at Mount Isa Mines

    By J Simpson, M Johnston

    Recently Mount Isa Mines undertook a study to review the lead-zinc orebodies to extent of resource and reserves and determine the new life-of-mine schedule, as the Mount Isa and Hilton orebodies had n

    Jan 1, 2003

  • AUSIMM
    Unique Coal Mine Drift Construction Method

    By C Donnelly

    Redpath Australia is using a unique mining method for the Australian underground coal industry at Kestrel Mine Extension in the Bowen Basin, Central Queensland.The project involves completing two sepa

    Mar 21, 2011

  • AUSIMM
    Implementation of the BIOX® process at the Runruno Gold project

    By J A. van Niekerk, J G. Jardine, J W. Olivier

    The Runruno Gold Project is located on the island of Luzon, approximately 200 miles north of Manilla in the Philippines. The mine is an open cut operation and uses the proven BIOX® and carbon-in-

    Sep 11, 2017