Adapting to Geotechnical Change – a Case Study of the Carina Open Pit MineBy R Jaine, D Strang, M Fowler
"This paper presents a case study demonstrating active geotechnical pit slope management at the now completed Carina Iron Ore Project operated by Mineral Resources Ltd (MRL). The site is located 105 k
Nov 15, 2016
-
Effectively Installing and Commissioning Flotation EquipmentBy B Murphy, J L. Heath
Installation of flotation equipment is a lengthy and intricate process involving conceptual design, detailed design and layout, equipment installation, equipment commissioning and handover prior to th
Sep 1, 2014
-
"A Geometallurgical Proxy for Nickel Laterite Heap Leaching"By J Li, A McFarlane, J Yu, L L. Kuhar, R Meakin, N Chapman
"Column leach tests are used frequently to predict recoveries and reagent consumption for nickel laterite heap leaches. These column leaches often run for more than 100 days and therefore require long
Jun 15, 2016
-
Automatic search strategy for ROM stockpile recovery optimisationBy M Wagner, H Assimi, F Neumann, C Garcia, B Koch
Run-of-Mine (ROM) stockpiles are the inventory of valuable materials extracted from the mine. Depending on the customer requests, a selective addition of ore from stockyards should be selected at the
Nov 10, 2020
-
Is Truck Queuing Productive?By P Malkin, S Thomas, P M. Stone, D Kostyuk
In open pit mining, it is common that the bottleneck to productivity and profit lies in the truck-shovel mining operation, especially as strip ratios and mining intensity have increased with resource
Nov 24, 2014
-
Conservation of Effective Efflux Velocity from a Road Tunnel Ventilation Outlet by Varying the Effective Cross-Sectional AreaBy A Bagis
Road tunnels are an accepted and effective transportation solution in urban areas to mitigate increasing traffic congestion and facilitate improved urban connectivity in a cost effective manner while
Mar 8, 2011
-
Real-time fluorine mineral sensor – taking research to prototypeBy J Moffatt, T Payten, N Spooner, L Teixeira, L A. Balzan, G Wilkie, G Tsiminis
Fluorine is a penalty element due to its reactive nature. In acidic environments many fluorine minerals dissolve to form hydrofluoric acid (HF), changing processing conditions. When smelted HF can be
Aug 24, 2022
-
Journey to the Edge of the Basin - Stratigraphic Setting and Iron Mineralisation at the Davidson Creek and Robertson Range Projects, Hamersley Province,Western AustraliaBy R McCarthy, P Hawke
FerrAus Ltd's Robertson Range and Davidson Creek Projects are located in the Hamersley Province about 100 km east of Newman, Western Australia. Significant iron mineralisation defined by an aggre
Jan 1, 2009
-
Modular SAG mill discharge trommel for maintenance flexibility and performanceBy K Katov, S T. Ciutina, J D. Pyke
The development and optimisation of mill discharge trommels, and specifically their screen panels, can be a neglected area in the complex operation of a minerals processing plant. Trommels are often s
Aug 29, 2018
-
The development of optimised pulp lifter design for the Ahafo SAG mill using discrete element method modellingBy E Asakpo, S Chaffer, A Heath
Newmont has had continuous production at their Ahafo operations, Ghana, since 2006. In 2013, Ahafo initiated an efficiency programme to improve mill performance and reduce energy consumption. Followin
Aug 29, 2018
-
Maximising Value Through Maintaining Your Flotation EquipmentBy B Murphy, S O’Connell, J L. Heath
In the 1989 best-seller The 7 Habits of Highly Effective People, the author, Stephen Covey, highlights the importance of maintaining not only ‘production’, but also, ‘production capacity’. When operat
Sep 1, 2014
-
Flexigel™ – A Variable-density SolutionBy D R. Andrew, K T. Morrison, J F. Tiedgen
Waste blasting in iron ore operations can pose a number of technical challenges, including blasting through variable geology and blasting soft ground in wet conditions. Blast patterns are designed to
Jul 13, 2015
-
Developing Mineral Reporting CompetencyBy J Coombes
The JORC Code lists the three core principles of Transparency, Materiality and Competency as fundamental to how mineral estimates are publicly reported. But where the principles of Transparency and Ma
Aug 22, 2011
-
Who is Responsible for Grade? – An Evaluation of the Value Chain at Mt Magnet Gold Project, Western AustraliaBy A Weeks, W J. Shaw, A Kuk
Grade control is a process that requires the interaction between many components of the mining operation and successful grade control is only realised through good data, robust systems, and a well-tra
Aug 18, 2014
-
An assessment of the rate of construction of an upstream raised tailings damBy J J. Moreno, J Willis, P Garvey
Many of the tailings storage facilities (TSFs) in Australia are upstream raised facilities for which the consolidation of the hydraulically deposited tailings is essential to the stability of the TSF.
Jul 1, 2021
-
Characterisation and calculation method of friction resistance based on fractal theory of roadway rough surfaceBy B Wu, C Zhao, B Lei
At present, the friction factor is calculated by measuring pressure drop and airway configurations. However, the workload of on-site measurement is heavy, and the measurement results are easily distur
Oct 12, 2022
-
The Wedge Theory of Borehole Charge Design for Bench Blasting and Its Numerical SimulationBy Q Yu, G Ren, Z-Y Chen, J Yang
The wedge shape theory of the rock fragmentation range in bench blasting is presented according to the dynamic characteristics of rock fragmentation by blasting in open pit under the condition of hole
Aug 24, 2015
-
Excavating the First Underground Gyratory Crusher at the Deep Mill Level Zone Mine, PT Freeport IndonesiaBy E Hernandez, I Agustian, W Kusumohastuti
PT Freeport Indonesia is completing the first underground gyratory crusher excavation at their Deep Mill Level Zone (DMLZ) mine located in the mountains of Jayawijaya, District of West Papua, Indonesi
Mar 24, 2014
-
Getting Accurate Mine Information to the Right Teams to Drive Production ImprovementBy T Elms, R Beckman, M Sampson
"In today’s mining industry, the pressure of reducing costs and increasing production while maintaining high safety standards is at the forefront of operational endeavours. A combination of specific m
Nov 15, 2016
-
Increased productivity using theory of constraints at the Argyle Diamond MineBy B Murphy, N Strong, J Albrecht
Rio Tinto’s Argyle Diamond Mine has a history of underperformance with delivery of ore from the underground operation to the surface for processing with no real clarity in sources of loss and value. I
Mar 15, 2021