Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Genesis of the Large-sized Fozichong Lead-zinc Polymetallic Deposit, Guangxi, South China – Constraints from the Sulfide Mineralogy, Fluid Inclusions and Isotope GeochemistryBy H Q. Zhang, M C Chai, W Fu, H Y Chen, L M. Wei, Q J. Yang
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Fozichong deposit – located in the south-western segment of the giant Qinhang metalloge
Mar 18, 2015
-
Geometallurgy of the South Middleback Ranges Magnetite Deposit – Predicting Plant Performance from the PitBy D Gerrard, J Begelhole, J Gerber
The Iron Magnet deposit has been mined since 2007 when Arrium (then OneSteel) commissioned the magnetite concentrator to supply feed to the pelletising plant in Whyalla. The concentrate quality requir
Jul 13, 2015
-
Localised Indicator KrigingBy I Douglas, L Allen
Localised indicator kriging was developed following a similar approach used by Marat Abzalov (2006) in his paper titled æLocalised uniform conditioning (LUC): A new approach for direct modelling of sm
Sep 26, 2011
-
Improving the Fluxed Pellets Performance by Hydrated Lime Instead of Bentonite as BinderBy J Pan
In this paper, the technology of producing fluxed pellets by using hydrated lime as binder instead of bentonite was carried out. The properties of the two types green balls (0.8 per cent bentonite and
Jul 11, 2011
-
The Use of High Resolution Geophysical Technologies to Map the Base of Ore at BHP Billiton Æs Yandi Channel Iron DepositBy G Hall
BHP BillitonÆs (BHPB) Yandi ore deposit is a channel iron deposit (CID) in the Pilbara district of WA. The ore is predominantly a goethite-hematite pisolite and overlays a clay at the base of the depo
Jan 1, 2002
-
Pastefill - A Multi-Disciplined Review of Barrick Gold Corporation's Pastefill Operations in AustraliaDuring 2009 the technical services staff at Barrick Gold Corporation's Australian Business Unit conducted a review of their five underground mines that utilise pastefill as the backfill component
Nov 25, 2010
-
Mineralisation Styles and Geochemistry in the Paddy's Flat Gold District, Meekatharra, Western AustraliaBy Kavanagh M. E, Henley R. W
The Meekatharra mining district lies in the northern pan of the Murchison Province of the Archaean Ynlgam block of Western Australia. Since dis- covery of the Paddy's Flat belt in the district i
Jan 1, 1991
-
What’s Stopping You? The Role of Sheeting Material Selection in Safe Haulage OperationsBy R Thompson, D Tulloch
"Wet-weather or 24×7 wet-trafficability is a commendable design objective for unpaved mine haul roads, but practically often difficult to achieve, due both to the road sheeting material selected, and
Nov 15, 2016
-
Identify, Convert and Sustain – Resource Development in the Pilbara – The Rio Tinto WayBy G Danckert
The key technical theme of ‘orebody knowledge’ has been applied by Rio Tinto in the Pilbara iron ore precinct from 1966, when operations first started there. It forms the basis of present day applicat
Jul 11, 2011
-
Development of the Presink System for Raise Boring at Xstrata Copper’s Mount Isa Copper OperationsBy G Chitumbura
Raise boring is a critical aspect of mining at Xstrata Copper’s Mount Isa Copper Operations (MICO). MICO’s internal raise boring department regularly develops ventilation rises, orepasses and stope cu
Mar 21, 2011
-
Glass Earth's Greenfields Gold Discovery Strategy Using Multi-Faceted Airborne Geophysical Surveying is Poised to Rewrite the Geology Of Central OtagoBy S Henderson
The Otago Goldfield has produced approximately 8 million ounces of alluvial gold and over 2.5 million ounces of hard rock gold and is currently home to New ZealandÆs largest producing gold mine. In th
Jan 1, 2007
-
Mining method, and controls, to cut back a failed slope at KCGMs Fimiston Pit (KCGM Superpit)By C E. Woolley, H Jebaliya, J Foster
The East wall of the Kalgoorlie Consolidated Gold Mines Fimiston Open Pit (KCGM Superpit) has a history of wall instabilities impacting mining operations; the most significant of which occurred in May
Jun 22, 2022
-
Carrapateena Vent Rise Performance – Geotechnical Design and CalibrationBy G Balog, T Ormerod, D Sidea
Carrapateena is a copper-gold sub level caving operation located in the Gawler Craton, South Australia. One of Australia’s largest undeveloped copper deposits, the project will be a 4.25 Mtpa undergro
Mar 15, 2021
-
Blasting Harmonics and Controlling Peak Particle VelocityBy T J. Laing, A B. Richards, A J. Moore
Blastholes fired in a pattern with a constant initiation delay create a frequency in the ground vibration similar to that from a percussion instrument, such as a drum, in the air. A constant firing de
Aug 24, 2015
-
Never Touch a Running System - Longwall Cutting Sequences and their PotentialThe optimisation and validation of shearer cutting methods is a time consuming engineering task. Many different parameters, of which not all can be controlled, can vary. The easiest solution, to incre
Dec 6, 2010
-
Outside Auger Hollow Claw Tipped Mechanical Sampler for CoalBy Z-Y Pi, B Zhang, S Wen
"The paper introduces the structure and work processes of outside auger hollow claw tipped mechanical sampler for coal. Twenty sets of claw tipped sampler performance tests show that: The design of i
Aug 21, 2012
-
Predicting and modelling Bond Work Index using chemistry (as a proxy for mineralogy)By K Gardner, R Fraval, V Singh
Using new technology to create optimised infill drill programs in underground or open pit settings, it is possible to quantify the value of a drill program. The computer designed programs are optimise
Mar 22, 2022
-
Improvements in Service Life and Cost Reduction for Gyratory Primary Crushers through Mantle and Concaves Optimisation – A Case StudyBy I Elias, E Moya, S Chaffer
This paper is based on a case study from a mine site that operates two gyratory primary crushers. These crushers were encountering problems, which included inconsistent P80, reduced liner life tonnage
Jul 13, 2015
-
Ion Exchange in Hydrometallurgy - Secondary Metal Removal or Primary Production Technique?By J D. Illescas, S N. Arnold, D R. Shaw
Ion exchange (IX) as a primary production technique has been applied commercially since the 1950s; its application in the uranium industry continues to be widespread and is utilised to a lesser degree
Oct 29, 2012
-
Enabling Technologies – The Role of New Communications TechnologiesBy C Fischer
The introduction of digital communications technologies into the underground mining industry, in both coal and hard rock mining, has enabled high bandwidth applications to be applied in the mining ind
Nov 22, 2011