Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Designing Interferometric Synthetic Aperture Radar Surveys for Mine Monitoring with Accuracy AssessmentBy R Ahola, M D. Henschel, M A. McParland
With the introduction in recent years of third-generation interferometric synthetic aperture radar (InSAR) techniques, monitoring of mine slopes, benches and surrounding areas has benefitted from incr
Nov 5, 2014
-
Improving tungsten recovery through the reuse of mine wastewaterBy Z Gao, D Liao, W Sun, S G. Pooley, J Wang, Z Shi, G Jing, S Ren, Q Chen
Yuanjing processing plant is a scheelite and wolframite plant in southern China. Water shortages and recent environmental regulations mean that the plant must reuse the wastewater that comes from the
Aug 24, 2022
-
Water balance management 101By M Rafty, C Lane
Managing water is a key aspect of mining, whether a site is in water surplus or water deficit. Water in tailings storage facilities (TSFs) needs to be managed carefully to maximise the density of the
Jul 23, 2018
-
Managing Coal Loss Using Blast Models and Field MeasurementBy P Brown, M Nagarajan, A Green, P Dare-Bryan
Coal loss is an important issue at many coalmines, with losses of five per cent being common. The type of loss varies from mine to mine but is dependent on mine strata, the drilling and blasting proce
Aug 24, 2015
-
Impact testing of raise bore protection meshBy M Doran
The Olympic Dam mine utilises 1.1 m to 1.4 m diameter raise bores for generating the initial slot void for most production stopes. Slot raise bores generally span two development levels ranging from 3
Mar 29, 2023
-
Development and Evaluation Processes of Cave Production Schedules for the Resolution Copper ProjectBy R Godard, J Gantumur, F Prince, C Pascoe
Resolution Copper Mining LLC (RCML) is one of the largest undeveloped high-grade porphyry copper-molybdenum deposits in the world, with an orebody at depths of approximately 2000 m beneath post-minera
May 9, 2016
-
Material handling testing and control system requirements for dry stack tailingsBy R Stefansen, T Wisdom, A Nicholson, K Rahal
The challenges of increasingly scarce water resources and the risk of dam failures has seen the mining industry turn to sustainable tailings management solutions such as dewatering and dry stacking. F
Jul 23, 2018
-
A guide to ground disturbance permitting and managing ESG riskBy H Arvidson, B Spence, S Helm
Mining is the art of disturbing ground. All phases of a mine’s life cycle from exploration to building and operating a mine, through closure, has a physical impact on the earth. There is currently inc
Sep 18, 2023
-
Mine Dewatering Project - Pasminco Mining, Broken HillBy Mitchell D. S
BackgroundIn March 1990 Pasminco resolved to replace and increase the capacity of the underground pumping system at the Southern Operations, Broken Hill. The existing pump station was built 23 years a
Jan 1, 1993
-
Trigger Action Response Plans for Diesel Exhaust ExposuresBy J Jeffery, P G. Knott, F Velge, C Evans
A trigger action response plan (TARP) provides a structured response to escalating levels of risk. In mining, TARPs are typically applied to primary hazards such as inrush, strata failure or heating.
Aug 31, 2015
-
The Network Centric MineBy G Malherbe, J Gonzalez, D C. Franklin, J Bassan, C T. Farrelly
To respond to ever-increasing challenges, mining companies have been experimenting with new business models and technologies in order to speed mine development, production, processing and transport. T
Nov 20, 2012
-
Visual Communication of Geological Confidence - A Move Toward a Less Subjective ApproachBy J Seery, N Savage, A Wilson, L Nicholas
Geological modelling provides a means of spatially representing the three dimensional distribution of geological information to downstream stakeholders. The geologist completing the modelling work int
Aug 12, 2013
-
How to Prioritise Process ImprovementsBy D J. Hill
"Mining companies routinely invest in improvements to their processing operations, but often these enhancements do not work to full effect.Improvements can be ineffectual because underlying process pr
Sep 1, 2014
-
Strategic Sustainable Development – Creating Shared Value in the Mining IndustryBy M Jones, G Corder, A C. Keith
"Sustainable development has become an issue of ever increasing importance to the mining industry. The Ernst & Young (EY) mining industry risk radar regularly shows several sustainability elements
Jun 22, 2016
-
Case Study of Non-Mining Prediction and Control of Acid Rock Drainage ù The Vancouver Island Highway ProjectBy W M. Tekano, T S. Coulter, N M. Hutt
The Vancouver Island Highway Project (VIHP) was a $CAD 1.2 billion expenditure by the Province of British Columbia to improve travel safety and relieve traffic congestion between Victoria and Campbell
Jan 1, 2003
-
BioHeap® – Breaking the Grade/Recovery Curve for Nickel ConcentratorsBy J Fewings, T McCredden, S Seet, C Fitzmaurice
"Flotation of nickel sulfide ores are generally constrained by nickel grade and impurity concentrations (notably magnesium and arsenic) in the product delivered to smelters. Being a physical separatio
Oct 10, 2016
-
Life-of-mine Development and Production Scheduling Optimisation for Sublevel Cave OperationsBy G Chitombo, A Perryman, A D. Campbell, J White, B Hollis
This paper describes the development and implementation of an optimisation tool developed as part of the Mass Mining Technology (MMT) Project. The tool, known as the SLC Schedule Optimiser, is capable
May 9, 2016
-
Understanding What Constitutes the Mining Industry's 'Social Licence to Operate' in AustraliaSocietal expectations about how the industry operates and treats its people will be a key driver in the development of the Australian mining industry over the next 20 - 30 years (Moffat, Mason and Lit
Jun 1, 2010
-
Effect of Mineral Density for Milling Magnetite OresBy P Holtham, W Valery, P Baguley, A Jankovic
There is a growing interest in magnetite ores because of the increasing demand for this commodity. With these ores, there is significant cost associated with milling the ore to fine sizes using ball m
Jul 13, 2015
-
30 years of seismic system design, implementation and interpretationBy J Player, G Sweby, S Webber, E Jones
Seismic systems are a tool for the monitoring and forecasting the rock mass response to excavation. Common issues encountered at mine site audits and reviews are: how to design an effective seismic sy
Nov 29, 2022