Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Real time LHD dispatch optimisation with ratio targets at Newcrest’s Cadia Valley Operations

    By S N. Donaldson, B L. Hollis, K Wynn, L Potts, M Evans

    A real-time load-haul-dump (LHD) dispatch optimisation tool has been deployed at Panel Cave 1 and Panel Cave 2 at Newcrest’s Cadia Valley Operations. The tool, known as ORB, is the first known success

    Mar 15, 2021

  • AUSIMM
    Thermal phosphorus – it’s a hot commodity with a hot process

    By R Atmuri, W Liang, R Prasad, Y Liu, E Wingate

    Yellow phosphorus (YP) has been commercially produced since the 1920s. First in the USA by the Tennessee Valley Authority (TVA), next in Russian (Kazakhstan) in the 1950s, and finally in China in the

    Aug 21, 2024

  • AUSIMM
    Managing continuous improvement of Mine to Mill begins with measurement

    By J Loeb, R Ramanathan, H Ingham, P Cameron

    Most mining operations, including iron ore, maintain a focus on continuous improvement and asset optimisation in their operations. As all the unit operations in the Mine-to-Mill value chain are interd

    Nov 8, 2021

  • AUSIMM
    Managing Stress and Ground Condition Changes with Increasing Depth at Callie Underground Mine

    The Callie Underground Gold Mine (Callie) is owned by Newmont Asia Pacific and located 531 km north-west of Alice Springs in the Northern Territory. Historically, stopes have been mined util

    Nov 25, 2010

  • AUSIMM
    MEMS – The Mine Event Management System: a process to assist with incident management

    By B Stewart

    It has long been recognised that knowledge of the conditions existing in a mine after an incident is essential in deciding whether to deploy responders as part of the incident recovery process. Applyi

    Apr 16, 2024

  • AUSIMM
    De-bottlenecking Iron Ore Transportation from Mine to Plant

    By T Tan, C P. Holmes, C E. Hartford

    Transportation of iron ore from the mine to the plant is critical to business success. Ore from the mine may have to be transported across states, countries and even continents to get to the processin

    Jul 13, 2015

  • AUSIMM
    Metallurgical Performance of Outotec’s e500 TankCell® at the Kevitsa Cu-Ni-PGE Concentrator

    By B Murphy, T Mattsson, R Crosbie, T Maksimainen

    "An Outotec e500 TankCell, with 500 m³ of actual flotation volume, was commissioned at the Kevitsa Cu-Ni-PGE concentrator in northern Finland during 2014. This flotation cell was implemented at t

    Oct 10, 2016

  • AUSIMM
    Improved sustainability through WHIMS Plant addition at Roy Hill

    By C Jenkins, J Jasper, Y Suryaputradinata, S Lozyk, M J. Hartmann

    The primary objective of mining companies is to function as a profitable business by delivering products that fit customer requirements in a safe and sustainable manner. Optimum resource utilisation i

    Nov 8, 2021

  • AUSIMM
    The evolution of the Monty Geological model and the revolution of the on-site modelling and grade control processes

    By P Willems, J B. Crow, R Dale

    Open pit mining commenced at Lihir Island in 1997 and is undertaken using a conventional drill, blast, load, haul methodology. Unique challenges at the operation include an active geothermal system, a

    Mar 22, 2022

  • AUSIMM
    Integrated process modelling for the Kalgoorlie Nickel Smelter

    By G Sartor, A Rich, D Grimsey, R Forzatti, M White

    An in-depth process model was developed for the pyrometallurgical, off-gas systems and water balance of the Kalgoorlie Nickel Smelter. This model was used to assess plant capacity with changing concen

    Aug 21, 2024

  • AUSIMM
    Oxygen Potentials in Molten Metals, Mattes and Gases

    According to our experimental results, the following oxygen probe recommended, that is, the magnesia stabilized zirconia was employed as a solid electrolyte and Fe.FexO solid elect- rode was used as

    Jan 1, 1980

  • AUSIMM
    Optimising the Telfer Pyrite Regrind Circuit – Effect of Dissolved Oxygen Demand

    By D R. Seaman, B Adamson, P Sharman, M McMahon

    "The Telfer processing plant commissioned its pyrite regrind and flotation circuit in August 2012. The circuit was designed to regrind pyrite concentrate to a p80 of <30µm then float a gold

    Oct 10, 2016

  • AUSIMM
    Tin Exploration in Indonesia - Problems and Solution

    By Umar N

    Traditional exploration has been undertaken by both local and overseas experts to discover tin deposits in Indonesia over almost 300 years. Indonesia is part of a tin belt which runs from Myanmar in

    Jan 1, 1996

  • AUSIMM
    Pushing the boundaries of slag operability – processing of high-MgO nickel concentrates with the Ausmelt TSL process

    By J Coveney, A Rich, D Grimsey, J Wood, S Creedy

    In 2021, BHP and Metso examined processing of high-MgO nickel sulfide concentrates using Metso’s Ausmelt Top-Submerged-Lance (TSL) technology. Test work was conducted in Metso’s pilot test work facili

    Aug 21, 2024

  • AUSIMM
    A Holistic Approach to Managing Blast Outcomes

    By D Genge, E Martin, T Goswami, M Rothery

    Rio Tinto’s Hunter Valley Operations is a large open pit coalmine situated in the heart of the Hunter Valley in Australia. The Riverview West Pit has faced increasing production challenges in recent t

    Aug 24, 2015

  • AUSIMM
    Modelling of an Integrated Waste Storage Facility

    By P Edmondson, S Narendranathan, S Setchell

    The complexities of mining in current economic conditions, where ore extraction schedules are varied on a weekly basis so as to ensure constant supply to the process plant, can result in a number of s

    Jul 27, 2015

  • AUSIMM
    Open Cut Mine Machinery Automation – Going Beyond Global Navigation Satellite System with Locata

    By C Rizos

    Many of the ‘new paradigms in mining’ and notions of ‘sustainable mining’ have at their core the requirement for reliable, continuous centimetre-level positioning accuracy to enable increased automati

    Nov 22, 2011

  • AUSIMM
    Development of a Predictive Geometallurgical Recovery Model for the La Colosa, Porphyry Gold Deposit, Colombia

    By S Leichliter

    La Colosa, Colombia is a large gold-porphyry deposit currently undergoing feasibility studies by AngloGold Ashanti. This period of development allows the opportunity to apply innovative and emerging t

    Sep 5, 2011

  • AUSIMM
    Building a Geometallurgical Model for the Canahuire Epithermal Au-Cu-Ag Deposit, Southern Peru - Past, Present and Future

    By M Dusci, A Trueman, S Poos, R Baumgartner, M Brittan

    The Canahuire epithermal Au-Cu-Ag deposit in southern Peru is a complex and challenging deposit for metallurgical studies. It has issues of gold locking in sulfides and non-sulfides, deleterious eleme

    Sep 29, 2013

  • AUSIMM
    Solid Solution of Tetrahedrite in Chalcopyrite and Bornite

    Records of ex-solution intergrowths with tetrahedrite as a component are rare. Intergrowths of this nature of tetrahedrite with galena have been described by Guild (1917) and Schneiderhohn (1922), and

    Jan 1, 1946