Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Toe angle measurement for SAG mill control at Lihir gold mine

    By M Randall, P Ebzery, F Burns, C Aisthorpe, P Blanz

    SAG Mill process control classically maintains the SAG mill volumetric filling within a set operating range. Typically a SAG mill weight measurement, by either bearing pressure transducers or load cel

    Aug 29, 2018

  • AUSIMM
    An Alternative Genesis for Pisolites and Channel Iron Deposits in Western Australia

    The current genesis of pisolites and channel iron deposits (CID) has been defined in a way that presents CID as unique in the world. The published material on detrital pisolites mostly details the Wes

    Jan 1, 2009

  • AUSIMM
    Telfer Project Process Plant Design

    By R Dunne, G Lane, S Ha, D Dreisinger

    The paper outlines the 17 Mt/a Telfer Project plant process design from sample selection to feasibility study design. The 366 Mt Telfer mine reserve consists of a diverse range of copper and gold mine

    Jan 1, 2003

  • AUSIMM
    Mining at the Redross and Mariners Nickel Mines

    By D Will

    RedrossThe Redross orebody averages 1 m wide, has a strike of 50 - 350 m, dips at 55° and has a basalt footwall and an ultramafic hanging wall. The most successful and innovative aspects of mining Red

    Mar 21, 2011

  • AUSIMM
    Marine Recovery of Tunnel Boring Machine from Botany Bay

    By S Norman

    The Water Delivery Alliance (WDA) was established to design, construct and commission the pump station and desalinated water delivery pipeline to link the desalination plant on the Kurnell Peninsula (

    Mar 8, 2011

  • AUSIMM
    A Bounding Surface Model for Sand Subjected to Blast-induced Vibrations

    By L M. Zhang, T H. Xu, J Zhao

    Blasting is one of the most commonly used strategies for excavation in civil and mining engineering. Yet blasting can also bring along such undesirable effects as ground vibrations and soil disturbanc

    Nov 5, 2014

  • AUSIMM
    The Integration of Geometallurgy with Plant Design

    By G Harbort

    Traditional engineering design for flotation circuits use the “Rule of Thumb” approach. Typically this uses a nominated maximum head grade for design. A scale-up factor is applied to laboratory flotat

    Aug 8, 2011

  • AUSIMM
    The Operation and Application of Hunting's Airborne Thematic Mapper

    By Drury SA, Williams RD, Nind DC

    The Airborne Thematic Mapper is an eleven channel digital scanner which acquires image data in the visible, near infra-red, short wave infra-red and thermal infra-red wave- lengths. A description o

    Jan 1, 1986

  • AUSIMM
    Newmont Tanami Operations – Tailings Storage Facilities

    By S Thacker, M Noakes

    The Newmont Tanami Operations (NTO), formerly the Granites Gold Mine, commenced operation in the mid-1980s with tailings deposition evolving over the past three decades as production has increased and

    Jul 27, 2015

  • AUSIMM
    Life-of-Mine Ventilation and Refrigeration Planning for Resolution Copper Mine

    By R G. Moreby, S Bluhm, FávonáGlehn, C Pascoe

    Resolution Copper Mine in Arizona, USA, is planned to be a 2000 m deep panel cave mine with virgin rock temperatures exceeding 80¦C in rock with high crystalline silica content, resulting in a very ch

    Jul 1, 2013

  • AUSIMM
    The influence of charge density and solution ionic strength on polymer flocculant performance

    By JOHN G. RAYNER

    An examination was made of the filtration characteristics of a haematite slurry using a range of polyacrylamide based flocculants in solutions containing up to 3 per cent sodium chloride. The polymers

    Jan 1, 1987

  • AUSIMM
    Strip and Line versus Blind Sink Shaft Sinking – The Ernest Henry Decision

    By C J. Carr

    The Ernest Henry Mine (EHM) is owned and operated by Xstrata Copper and is located in North-West Queensland, Australia. The mine is currently undergoing a transition from an 11 Mtpa open pit mine to a

    Mar 21, 2011

  • AUSIMM
    Mine Shafts – Planning, Optimising and Constructing

    By D J. Kilkenny

    Work practices involved in shaft construction can be aligned with current industry standard operating practices. However, the working environment during conventional shaft construction introduces uniq

    Mar 21, 2011

  • AUSIMM
    Accounting for Vegetation Dynamics in Landform Evolution Modelling

    By G R. Hancock, S Grant, T Whiteside, J B. C Lowry, J Boyden, T J. Coulthard

    Physically-based landform evolution models (LEM) provide a spatial framework to forecast the long-term geomorphic stability of post-mining landscapes. When used to test the relative stability of diffe

    Jun 28, 2016

  • AUSIMM
    Environmental Blast Design and Effective Implementation

    By A B. Richards

    Effective control of blast vibration and flyrock requires that significant factors be identified and quantified, that the blast be designed to ensure both blasting efficiency and compliance with appli

    Jan 1, 2004

  • AUSIMM
    Recent advances in tailings testing methods

    By D J. Williams

    The majority of surface tailings storage facilities continue to employ sub-aerial tailings slurry deposition. Surface TSFs are typically sized and operated in a way to minimise the initial capital cos

    Jul 23, 2018

  • AUSIMM
    The Geometry and Petrography of Stockwork Vein Swarms, Macraes Mine, Otago Schist, New Zealand

    By D Craw

    The Macraes gold deposit is located in a low angle NE dipping (~15¦) shear zone, the Hyde Macraes Shear Zone (HMSZ) cutting greenschist facies metasediments of the Otago Schist. The shear zone is host

    Jan 1, 2004

  • AUSIMM
    The Value of Geological Human Capital in the Improvement and Maximisation of Ore Deposit Value – The Kalgoorlie Consolidated Gold Mines Experience

    By D Cooke

    In 2010, Kalgoorlie Consolidated Gold Mines (KCGM) was Australia’s largest gold producer, with total annual production of 788 000 ounces. Of the gold produced by KCGM in 2010, 95 per cent was extracte

    Aug 22, 2011

  • AUSIMM
    Bed Load Losses from Experimental Plots on a Rehabilitated Uranium Mine in Northern Australia

    By W D. Erskine, M J. Saynor

    Ranger Uranium Mine, surrounded by Kakadu National Park is located in the Alligator Rivers Region (ARR) in the wet-dry monsoonal tropics, 250 km east of Darwin, Northern Territory. A trial landform (T

    Jun 28, 2016

  • AUSIMM
    How economics drive the application of ore sorting

    By W Kendall

    Ore sorting has the potential to reduce the feed to wet plants and in the case of complex orebodies that can significantly reduce the water, energy and reagent consumptions and resulting operating cos

    Nov 21, 2018