Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Importance of Data Collection to the Blasting Process

    By J Hutchings

    An essential component to the management of any process is the measurement of key parameters, used to monitor, control, and provide the feedback necessary for improvement. This paper discusses how dat

    Nov 8, 2011

  • AUSIMM
    Monorail Technology - A Rapid and Cost-Effective Method of Decline Development

    By B Besa

    Australia is a world leader in the design and operation of mines accessed by the decline method. Literature indicates that a number of metalliferous underground mines using the decline system are also

    Jan 1, 2008

  • AUSIMM
    Development of a Pyrite Regrind Circuit at Telfer Gold Mine

    By D R. Seaman, Y Peng, F Burns, D J. Bradshaw

    Telfer Gold Mine is a gold-copper mine in the eastern Pilbara of Western Australia, owned and operated by Newcrest Mining Limited. TelferÆs ores are processed by a dual train, 21 Mt/a, concentrator wh

    Oct 29, 2012

  • AUSIMM
    Simulation Modelling of Grade Variability for Iron Ore Mining, Crushing, Stockpiling and Ship Loading Operations

    By K Jupp, T J. Howard

    Cliffs Natural Resources Pty Ltd (CNR) operates iron ore mines in the Koolyanobbing region of Western Australia, about 50 km north of the town of Southern Cross. Ore is trucked from three geographical

    Jan 1, 2009

  • AUSIMM
    Introducing HPGR quaternary crushers in a Russian magnetite operation – challenges and solutions

    By B C. Povey, K Lagutin, M Mryasov, V Noll

    The current Stoilensky magnetite concentrator comprises a three-stage crushing circuit followed by three stages of ball milling, grinding and concentration to produce a magnetite concentrate with 66.5

    Sep 11, 2017

  • AUSIMM
    A Model To Control Bins for Hydraulic Hoisting

    A model has been developed for the per iodical maintenance of bins used for hydraulic hoisting in mining of steeply inclining coal seams. This model gives a control plan for hoisting, bin switching

    Jan 1, 1977

  • AUSIMM
    The Evolution of Stope Backfill at Olympic Dam Operations

    Backfil ling of excavated Sub Level Open Stopes has been underway since March 1989 and as at December 1992 some 1 100 000 cubic metres of Cemented Aggregate Fill have been placed. During these three y

    Jan 1, 1993

  • AUSIMM
    Volume and Structural Changes Occuring During the Isothermal and Non-Isothermal Reduction of High Grade Hematite Pellets

    By Morrison AL

    The volume changes occurring during the reduction by hydrogen of single, high-grade hematite pellets under isothermal and non- isothermal conditions were investigated using a time-lapse photographi

    Jan 1, 1980

  • AUSIMM
    Gold mineralisation on Woodlark Island, Papua New Guinea

    By Shatwell DO, Hayward SB, Leach TM

    Following acquisition of the Woodlark Island tenement by Highlands Gold Limited, an exploration programme using extensive diamond drilling has confirmed that the style of gold mineralisation is simila

    Jan 1, 1994

  • AUSIMM
    Integrated Optimisation of Grinding and Flotation Circuits

    By P Holtham, K C. Runge, E Tabosa

    Traditionally, comminution and flotation have been surveyed, analysed and optimised separately. This often results in less than optimal outcomes because of the complex interactions between the two pro

    Sep 1, 2014

  • AUSIMM
    Tunnel Boring Machine Excavation Stability – Double Shield Tunnel Boring Machine Advance with Partially Grouted Annulus

    By M Norbert, P Mok

    The mainline running tunnels for Legacy Way comprise of two-lane tunnel boring machines (TBM) driven tunnels. The length of the TBM tunnel section is approximately 4.2 km. The TBMs employed are double

    Sep 17, 2014

  • AUSIMM
    Risk Management and Use of a Geotechnical Baseline Report for a Competitive Alliance Procurement?Process

    By T Ireland, S Eratne, W Newns, P Spies

    The approach to risk management during the procurement of major projects often has a significant outcome on the ultimate delivery of a project. The NZ$1.4 B Waterview Connection project is the largest

    Sep 17, 2014

  • AUSIMM
    An Integrated Approach to Proactive Tailings Management

    By T Huynh, K Tungpalan, E Wightman, M Edraki, S Palaniandy

    Most preventive environmental management practices promote proactive integrated approaches to waste management. For example, life cycle assessment is often used to find the ‘hot spots’ of environmenta

    Jul 27, 2015

  • AUSIMM
    Exergy - A Useful Indicator for the Sustainability of Mineral Resources and Mining

    By A Valero, G M. Mudd

    There is active debate and research around the most suitable indicators to assess the sustainability of mining. The most common approach is to report a range of data for a given mine site (or less pre

    Jan 1, 2009

  • AUSIMM
    Alkaline Oxidation of Pyrite in Gold Recovery

    By Spencer PA, Winborne DA

    The Porgera mineral deposit in Papua-New Guinea contains gold as finely divided, probably submicroscopic (1 um) particles dispersed in a pyrite sulphide matrix. Only 25-30% of the gold in pyrite

    Jan 1, 1984

  • AUSIMM
    The Spatial and Temporal Variation of the Type and Rank of Australian coals

    Commercial or potentially commercial deposits of coal occur in Australia in strata ranging in age from Permian to Tertiary. The coals of each period tend to show a community of petrographic character

    Jan 1, 1975

  • AUSIMM
    Exploration Rock Geochemistry in The Hauraki Goldfield, New Zealand (84b6bbd9-3523-4b3b-97b9-61989cb0b12f)

    By Nowell SB, Cottrill DA

    Host-rock - wallrock major and trace element geochemistry associated with epithermal gold mineralisation in the Hauraki Goldfield of New Zealand is poorly documented, even though rock geochemistry is

    Jan 1, 1990

  • AUSIMM
    Evaluation of rock joint on construction tunnel face using convolutional neural network

    By H Kusumi, A Nishio, K D. Halim, Y Yun

    In Japan, evaluation of rock mass is crucial in mountain tunnels that are constructed using the NATM (New Austrian Tunneling Method) to determine the support pattern that in turns determine the final

    Nov 29, 2022

  • AUSIMM
    The Geology and Gold Mineralisation of the Batman Deposit, Mt Todd Project, NT

    By Hein K. A A

    The Mt Todd Gold Project is located 42 km northwest of the township of Katherine within the Northern Territory of Australia. It is situated in the southeastern portion of the Pine Creek Geosyncline.

    Jan 1, 1994

  • AUSIMM
    Optimising the recovery of stopes at Bentley Mine through rockfill stabilisation and cemented aggregate fill

    By D Pateman, F de Fredrick

    The Bentley underground mine, which is located 60km north of Leonora, Western Australia, is owned and operated by Round Oak Minerals Pty Limited. A high-grade Zn-Cu Volcanogenic Massive Sulphide (VMS)

    Mar 15, 2021