Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Rosedale Outfall Project – Overcoming Extreme ConditionsBy T Ireland
The Rosedale Outfall Project utilised an earth pressure balance (EPB) tunnel boring machine (TBM) for only the second time in Auckland. Although the tunnel was excavated fully through East Coast Bays
Mar 8, 2011
-
Practical measures of process efficiency and opportunityBy G R. Ballantyne, A N. Mainza, M S. Powell, M Evertsson
Quantifying the performance of a comminution circuit relative to the potential that can be achieved is a standard requirement in justifying operating practice (the stick) and seeking operational upsid
Aug 24, 2022
-
Artificial Intelligence (AI)-based predicting influence of technological innovation on stock price of iron ore mining companiesBy P Mugebe, M Yahyaei, M S. Kizil, R Low
This paper seeks to establish an empirical relationship between the impact of mining technological innovation implementation and a company’s market value. The company’s market value is represented by
Sep 1, 2024
-
Changing Restoration Priorities in the 21st Century – Opportunities for Novel Ecosystem Design in Mine ClosureBy P Audet, D Doley
The mining industry often embraces mine closure criteria that require the reinstatement of predisturbance or even presettlement (ie historic) ecosystems. However, the extent and severity of disturbanc
Jul 16, 2014
-
Rwanda and the Africa Mining VisionBy I H. Wilson
After decades of turmoil, Rwanda launched its Vision 2020 in 2000 aimed at reconstructing government and addressing poverty. Implementation focused on the agricultural sector, infrastructure and educa
Jul 16, 2014
-
Design and Construction for the Widening of the M2 Norfolk Twin TunnelsBy A L. de Ambrosis, S J. Clarke, R Bertuzzi, J Redelinghuys
The M2 Upgrade Project involved widening 15 km of the existing M2 Motorway, which is a key route in Sydney’s road network. The Norfolk Twin Tunnels in North Epping convey traffic over a 460 m length o
Sep 17, 2014
-
Case Study – Engineering Design for a Slurry Preparation Plant for a Paste Application in West AfricaBy G du Toit, P L. Gillot, M Swanepoel
Randgold Resources’ Loulo-Gounkoto Complex is one of the largest gold mining operations in Mali, West Africa. The mine, which is situated on the western border with Senegal, treats more than 4 Mt/a of
Sep 1, 2014
-
Surface-to-inseam (SIS) Drilling at Oaky Creek Coal Mine – SIS Design Aspects and Drilling EnvironmentBy E Corpuz, J Weissman, S Winter, R Evans
The surface-to-inseam (SIS) directional drilling technique has been utilised at Oaky Creek Coal for more than a decade to predrain both the Oaky No 1 and Oaky North mining areas. The cumulative drilli
Aug 31, 2015
-
Geothermal gradient determination for ventilation and air conditioning modelling at Malmberget MineBy F K. R Klose
Malmberget is a sublevel caving mine owned and operated by Luossavaara-Kiirunavaara Aktiebolag (LKAB), a Swedish state-owned iron ore mining company, in northern Sweden. The mine has an annual iron or
Oct 12, 2022
-
Bowen Basin Coalmine Spoil Classification for Improved Mine Rehabilitation OutcomesBy T Baumgartl, J Burgess, B Emmerton, P D. Erskine
Large-scale open cut mining in the Bowen Basin has been undertaken for over 40 years. During this period, improved mechanical capability and economics have allowed extraction to greater depths, result
Jun 28, 2016
-
Increased drilling accuracy leads to significant improvement in ore recovery and dilutionBy R Stimpson, B Johnson, B Hesse
During a period of twelve months between FY18-19, a series of trials were conducted to compare production drilling accuracy using two different methodologies, and the subsequent impact this had on sto
Mar 15, 2021
-
The Geology and Mineralisation of the Carina Iron Deposit, Yilgarn Mineral Field,Western AustraliaBy J Lea, D C. Kettlewell
The Carina iron ore deposit lies 105 km northeast of Southern Cross, WA. The area designated the Yilgarn Iron Ore Project (YIOP) is comprised of five prospects along an east-southeast trending greenst
Jan 1, 2009
-
Collaboration and change management, keys to successful automation implementationBy D Kilkenny, D Nardini, P Kline
This paper is a case study highlighting learnings and success in two areas challenging underground miners: change management and collaboration. It examines the implementation process of a new automate
Mar 15, 2021
-
Considerations for the design and support of underground portalsBy M P. Sandy, R M. Stephenson
Portals to access underground mines are important infrastructure and their design requires careful consideration. Portals are generally expected to last for the life of the mine. Typically, the exposu
Mar 15, 2021
-
Glencore Mount Isa lead zinc flotation circuit – experiences from the implementation of model predictive controlBy A Price, D Okle, K Brooks
The operation of flotation plants has been improved over the years by use of fundamentally based design techniques, a better understanding of reagent chemistry, online metal analysis and the use of di
Aug 29, 2018
-
Designing Energy Efficiency Assessments that Work - Thiess Australian Mining û Case StudyBy P Crittenden
Thiess Pty LtdÆs Australian Mining business unit used 7.6 PJ of energy in the 2007/2008 financial year. This represented more than 85 per cent of Thiess Pty LtdÆs total energy use and therefore meant
Jan 1, 2009
-
Predicting Finished Product Properties in the Mining Industry from Pre-Extraction DataBy J E. Everett
An essential requirement of product quality control in the mining industry is to be able to reliably predict key quality properties of finished product from the data available before the extraction of
Sep 5, 2011
-
Application of Risk-Cost-Benefit Analysis to Highway Subsidence Due to MiningBy J Joy, A Bye, G V. Kizil
This paper demonstrates an application of a recently developed Risk-Cost-Benefit (RCB) Framework to environmental risk management in the mining industry. The environmental application of the RCB Frame
Jul 10, 2012
-
PanAust Limited’s approach to mine waste and tailings stewardshipBy L P. Trout, D G. Reid
PanAust Limited (PanAust) has successfully constructed and commissioned two mining operations in Lao PDR over the past decade and undertaken major studies for three new mine developments. The managem
Jul 23, 2018
-
Critical process design considerations from test work to operationsBy A Dennis, T Hunter, R Coleman
For metallurgical plant design, it is necessary to progress through successive phases of test work, piloting and process development before involving all the other engineering disciplines and “freezin
Sep 11, 2017