Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Sinking the New Broken Hill Consolidated Circular AirshaftThe New Broken Hill Consolidated Airshaft is the first major undertaking in the development of New Broken Hill Consolidated Ltd's. property, which adjoins that of The Zinc Corporation Ltd. on the
Jan 1, 1940
-
Transition from owner mining to contract mining – a structured tender process using a holistic approachBy Y G. Anoman
This paper discusses the operating model within Endeavour Mining Corporation regarding the options of owner mining against contract mining. It’s based on the concept of ‘are we carrying out the most e
Jun 22, 2022
-
Variability of Gravity Recoverable Gold Values in Relation to Test Sample SizeBy S C. Dominy
The gravity recoverable gold (GRG) parameter reflects liberated gold or gold-dominated composite particles that can be recovered by gravity separation. Recoveries depend upon mineralogy, in situ parti
Sep 29, 2013
-
Automated Production Data Collection and Reporting at a Large Open Pit MineBy T Mattiske
The Fimiston Open Pit (commonly referred to as the æSuper PitÆ) is a part of the Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) operation in Kalgoorlie-Boulder. KCGM manages the Fimiston Open Pit,
Jan 1, 2002
-
Precision Analysis of Iron Ore Sampling, Preparation and Measurement -Overcoming Deficiencies in the Current Standard ISO 3085At Cliffs Natural Resources Ltd (CNR) crushing and shipping sample stations, precisions are estimated for the sampling, preparation and measurement stages of iron ore sampling in accordance with ISO 3
Mar 1, 2010
-
Cable Tunnel VentilationBy P Ridley
EnergyAustralia’s Sydney Central Business District (CBD) cable tunnel network will form a loop 6.2 km in length. The 3.2 km long, 3.5 m, diameter city east cable tunnel (CECT) currently in design, wil
Mar 8, 2011
-
Case Study - Total Life Cycle Planning for a Greenfield SiteCentral to any business is its Asset Management Plan which encapsulates the business context and key organisational objectives such as profitability, safety and environmental standards. Life Cycle Pl
Jan 1, 2007
-
Orepass Loss Mitigation Approach in Malmberget MineBy A Salama, J Greberg, B Skawina
In today’s underground mass mining, the orepass is an important part of the infrastructure as it connects two or more mine levels and is used for conveying or storing large amounts of material. One of
May 9, 2016
-
Recovery and Removal of Uranium by Using BiosubstancesBy Nakajima A
Some attempts were made to recover uranium from aqueous systems by using various biosubstances including microbial biomass. Of hundreds species of microorganisms tested, extremely high uranium absor
Jan 1, 1993
-
The evolution of seismicity and ground control measures at Ernest Henry MineBy H Esterhuizen
The Ernest Henry Mine (EHM) in Queensland, Australia is a Sub-level Caving operation that started production below the previously mined open pit at a depth of 535m. Current Production mining has progr
Nov 30, 2018
-
Application of Statistical Approaches for the Development of Cost Estimation Models for JawáCrushersBy J V. Mehrabani, A R. Sayadi
Adequate estimation of equipment costs is a key factor in a feasibility study and in evaluation of design alternatives for mining and mineral processing projects. Inaccurate early cost estimation coul
Sep 26, 2011
-
Modelling multi-seam interactions for longwall miningBy A Lines
This paper addresses a gap in longwall multi-seam interactions and their predictions, providing a case study for future multi-seam operations for both anticipated conditions and a method for understan
Nov 30, 2018
-
-
The Simple Facts about Sampling Gold OresBy T Day, I G. Robertson, G J. Lyman
"Various approaches are used in the industry for establishing procedures (sample mass estimation and method of subsampling) for sampling and analysis of gold ores. The key factors that determine the a
Oct 10, 2016
-
Managing the Giant – A Mine Geologist’s Perspective to the Mining of the Olympic Dam DepositBy M K. Kapo, S C. Nzama
The success of a mining operation depends on the quality of data used in decision-making processes and the people involved in making operational decisions. At Olympic Dam, mine geologists form an inte
Aug 18, 2014
-
Ernest Henry Underground Mine – Access and Support Infrastructure DesignBy P Christen
The Ernest Henry Copper gold mine situated in North West Queensland, Australia, is owned and operated by Xstrata Copper. Currently the open pit produces 11 Mtpa of ore. With open pit mining ceasing in
Mar 21, 2011
-
Kempfield Silver, Barite and Base Metal (Pb-Zn) Deposit, Lachlan Orogen, Eastern AustraliaBy D Timms
The Kempfield deposit is located in the Hill End Trough, one of several intracratonic basins developed during Silurian–Devonian time, in the eastern province of the Lachlan Orogen, Eastern Australia.T
Aug 22, 2011
-
Rock Mass Characterisation and Analysis for Excavation Design – A Discrete Fracture Network ApproachBy F M. Weir, M Fowler
The design of excavations in rock must, implicitly or explicitly take into consideration the influence of small- and large-scale geological structures. For most sites the complexity of a fractured roc
Nov 5, 2014
-
Light Airborne Platforms for Monitoring Mines and MineralsBy C Cavern, G Jacobs, F Durufle, L Ameglio
Airborne geophysics and geomatics is at a crossroads as to whether it remains a viable mapping tool, both technically and commercially, and broadens its potential for new applications (eg environmenta
Nov 4, 2015
-
Stacking And Reclaiming Facilities At The Thiess Bros. PTY. LTD., South Blackwater Coal Mine From Conception To Operation (51496ec7-c204-47bc-8733-52538534c7c3)By Hoskings R
Conceptual studies of the run of mine stockpiling and reclaiming requirements com- menced in 1975. Final selection of equipment was made in 1978 and the equipment was commissioned in June, 1979. Equ
Jan 1, 1980