Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Moisture/particle interactions under oscillatory motion – model developmentBy K Williams, A Lavrinec, V Gurung, D Ilic
The moisture content of iron ore during handling can range from the dust extinction moisture at the point of arrival at the port to the transportable moisture limit at the point of loading ships for m
Sep 18, 2023
-
Mine Pit Slope Geotechnical DesignMine pit slopes in the Pacific Rim are a geotechnical challenge because of the complex geology in which they are developed. Mines are currently being fast-tracked to meet the increase in commodity pri
Jan 1, 2006
-
The impact of ventilation on demand on impeller fatigue lifeBy L Salvestro
Ventilation on demand (VOD) has been demonstrated to significantly reduce operating costs for ventilation fans, by reducing fan output to meet demand. The most effective method for reducing operating
Oct 12, 2022
-
Supervisors and Teams at WorkBy T G. Neville, G Terrey, J Burns
This paper explores recent industry training programs and lessons for supervisors. The Belbin Team Role model was used to increase participants’ awareness of behaviour and its application. The applica
Jun 22, 2016
-
Benchmarking Energy Efficiency ù A Case Study at Macraes Gold MineBy K Osten, N Scagliotta, G Lane
Oceana Gold (New Zealand) Limited operates the Macraes Gold Mine near Dunedin on the South Island of New Zealand. The orebody is mineralogically complex and comparatively low grade requiring a series
Jan 1, 2004
-
Processing Operations at Sino Guizhou Jinfeng Mining Limited's Jin Feng PlantBy Y Yang, J Skrypniuk
The Jinfeng mine is Sino Gold's flagship project and is the second largest gold mine in China. Sino Gold Limited (SGL) holds 82 per cent equity in the Sino-Foreign joint venture Sino Guizhou Jinf
Jan 1, 2009
-
Porgera Flotation Circuit Upgrade and Expert System InstallationBy M Schaffer, T Kewe, N Moffatt
Porgera mine is 95 per cent owned by Barrick Gold Corporation. It is located at an altitude of 2200–2700 m above sea level in the Enga province of Papua New Guinea and produces approximately 460 000 o
Sep 1, 2014
-
Geostatistical modelling of geometallurgical classesBy W Patton, I Minniakhmetov, H Talebi, U Mueller
The sustainability of mining projects is linked to informed investment decisions based on public reporting of exploration and mineral resource estimation results. In Australia, public reporting guidel
Mar 22, 2022
-
A guide to maximising ball mill circuit classification system efficiency (CSE), for operators and equipment designersBy O Arafat, R E. McIvor, K M. Bartholomew
It is well known in the industry that good classification system performance is vital to efficient ball mill circuit performance. But what is meant by good classification system performance, and how i
Aug 29, 2018
-
A New Look at Kalgoorlie Golden Mile GeologyThe Kalgoorlie Golden Mile is proposed as an Archaean volcanogenic-type deposit, modified and redistributed along later-developed structures. Rich pyritctelluride and Green Leader gold mineralization
Jan 1, 1974
-
Building a Geometallurgical Model for Early-Stage Project Development – A Case Study from the Canahuire Epithermal Au-Cu-Ag Deposit, Southern PeruBy R Baumgartner
The Canahuire deposit is a recently discovered Au-Cu-Ag epithermal deposit in Southern Peru. A geometallurgy program is a key study element of the project Feasibility study. Metallurgical, mineralogic
Sep 5, 2011
-
The Applicability of Endless and Direct Rope Haulage Technology for Transportation Systems on Decline ShaftsBy E N. Sparg, O D. A Deuchar, F Needham
Decline shafts are an attractive option to both new and existing mining operations where there is a need to access an inclined orebody deposit via on-reef development so as to generate a return in the
Jan 1, 2005
-
Behavior of Minor Elements in the Roasting of Zinc ConcentrateBy Kato T, Eguchi M, Seino T, Itagaki K, Kimura T, Muto T, Shimizu T, Kobayashi T
Behaviour of minor elements in the dust collecting system connected with fluidized bed roaster for zinc concentrate was investigated by use of the bench scale experimental appara- tus. The dust col
Jan 1, 1980
-
Coalmine Pillar Design and Performance during Mechanised Pillar Extraction in IndiaBy I D. Gregson, A S. Garcia, K M. MacAndrew
The design work undertaken by Rock Mechanics Technology (now part of Golder Associates (Golder)) has played a major part in successfully establishing mechanised room and pillar working in Indian coalm
Nov 5, 2014
-
Robust flexibility – a methodology for agile systems engineering in miningBy D Brown, Z Tabor
Projects must be flexible to account for the rapid development of new technologies and changing stakeholder expectations. Coupled with calls for bleeding-edge solutions, customers, shareholders, and r
Sep 1, 2024
-
Research on supporting technology for production level roadways of block caving in Pulang Copper MineBy X Feng, X Zhang, W Sun, Y Zhe, K Hou, B Zhao, H Liu
Pulang Copper Mine, being China's largest newly built mine using block caving, boasts an annual production capacity of 12.5 million tons. Production level and roadway stability hold the key to the
Nov 30, 2018
-
Economic recovery and upgrade of metals from middling and tailing streamsBy M Hourn, G Anderson, V Lawson, P Voigt, D Mallah
As mine head grades decline and orebodies become more complex, traditional mineral processing techniques and flow sheets to achieve saleable concentrate become more difficult to design and construct.
Sep 11, 2017
-
Study on the dehydroxylation process of an ultrafine goethitic oreBy M Camarda, A Pirson, F Vasconcelos, J Mesquita
ArcelorMittal Prijedor is a goethitic iron ore mine located in the north-west of Bosnia and Herzegovina, which mainly supplies ArcelorMittal’s European subsidiaries. Annual production of the asset sta
Sep 18, 2023
-
An investigation of gyratory crusher liner wear at the Telfer Operation using non-operational streamlined modellingBy J Harding, S Munro, R A. Bearman
Despite the importance of the primary crushing stage, performance optimisation is not well analysed with sufficient focus to give improvement opportunities. At the Newcrest owned Telfer operation, lin
Aug 24, 2022
-
In-pit In Situ Recovery – a New Approach That May Allow for Increased Value Extraction before Pit ClosureBy D J. Robinson, L L. Kuhar
"Regardless of orebody value, at some stage, the pit will reach a depth where the reward for mining wider and/or deeper is not justified by the anticipated returns. ‘Last-blast’ strategies may help to
Nov 15, 2016