Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Overview of Low-Rank Coal Drying – Preprint 97-61By W. G. Willson, D. E. Walsh, B. Irwin
Low-rank coal (LRC) drying processes are generally categorized by operating temperature, drying environment and type of feed (either sized or ground coal). Within these broad categories, drying proce
Feb 24, 1997
-
Large Excavator Cuts Operating Costs at Alabama Coal MineBy Bill Elverman
Randy and Kenny Robison have visited every coal mine that would let them in the door, to survey the best mining practices. The brothers have spent nearly their entire lives working in coal operations
Jan 1, 2005
-
Innovative NATM Technology for Suburban Tunnelling Metro Section 306, Bochum, GermanyBy Axel Nitschke, Josef Arnold
Bochum’s Underground Lot 306 was characterised by a confined site and unique tunnelling methods. A highly mechanized construction concept was developed to achieve high progress rates. Bespoke backup s
Jan 1, 2005
-
-
The Nancy Creek Tunnel: Hard Rock Tunneling in AtlantaBy Jamie Bonner, Ray Hutton, Taro Nonaka
The Nancy Creek Tunnel is a deep tunnel, designed to store and convey wastewater by diverting flows from trunk sewers currently at or near capacity in the northwest of the City of Atlanta. The tunnel,
Jan 1, 2005
-
Stockton Mine Acid Rock Drainage Remediation û Part 2 - TreatmentBy P Lindsay, J B. Hughes
Underground and opencast coal mining has been ongoing since 1896 on the Stockton Plateau, West Coast, New Zealand. Acid Rock Drainage (ARD) from historic and current mine workings has had an adverse e
Jan 1, 2007
-
Notes on a Railway Tunnel Carried on TimberThe timber township of Powelltown, Victoria lies N.E. of Yarra Junction, 60 miles east of Melbourne and in the site of the mill of the Victorian Hardwood Company Proprietary Ltd.A lift gauge railway o
Jan 1, 1925
-
RI 3032 A Study of the Properties of Texas Polyhalite Pertaining to the Extraction of Potash - II The Rate of Decomposition of Polyhalite by Water and by Saturated Sodium Chloride SolutionsBy H. H. Storch
"INTRODUCTION The first paper of this series contained data concerning the behavior of polyhalite (K2S04.MgS04.2CaS04.2H20) upon calcination and subsequent leaching with water at 100° C. It was found
Oct 1, 1930
-
Tough choices facing the South African mining industryBy W. van Antwerpen, J. Guzek, A. Lane
Strategy is about making choices. Mining companies choose to do certain things and not to do other things. Mining is a long-term business, and the choices made typically have large investments attache
Jan 1, 2015
-
Small Mine Contractor Safety - Case StudiesBy F. Calizaya
The Western Mining Training and Translation Center is a consortium of four universities devoted to developing educational and training projects to reduce the incidence/accident rates in the mining ind
Jan 1, 2008
-
Charpy Toughness Behavior of Continuous Sisal Fiber Reinforced Polyester Matrix CompositesBy Wellington Pereira Inácio
This work investigated the toughness behavior of polyester matrix composites reinforced with up to 30% in volume of long, continuous and aligned sisal fibers by means of Charpy impact tests. It was fo
Jan 1, 2010
-
Improvements in the InLine Pressure Jig Expands its Applications and Ease of Use for Gold, Silver, Sulfide and Diamond RecoveryBy T Hughes
The Gekko InLine Pressure Jig (IPJ) was unleashed on the World gravity separation market in 1996 and has since sold over 150 units in applications including tin, diamonds, silver, coal, garnet and gol
Jan 1, 2008
-
Onsite Assembly And HARD Rock Tunneling At The Jinping-II Hydropower Station Power Tunnel ProjectBy Stephen M. Smading
Unique onsite assembly of a 12.43 m Main Beam TBM and back-up system was completed on September 18, 2008 in the remote mountains of the Sichuan province of China. The equipment was assembled onsite, w
-
Construction Of A Deep Slurry Wall In A Restricted City Centre Site Using A Hydraulic Grab And Rotator System.By P. M. Wiltcher
The construction of a deep structural slurry wall in a restricted city centre location is always a challenging prospect. However, when the city is London and the site is bounded on two sides by high
Jan 1, 2006
-
Re-aligning the cutting sequence with general support work and drafting a support sequence at Simunye ShaftBy K. Lombard
"‘Roof support awaiting time’ (RSAT) is a term used at Goedehoop Colliery’s Simunye Shaft to describe the potential production time lost due to the continuous miner (CM) standing idle waiting for roof
Jan 1, 2015
-
Using Principles Of Inherent Safety In Design Of Hydrometallurgical Solvent Extraction PlantsBy L. J. Moore
Introduction Hydrometallurgical solvent extraction (SX) processes – featuring large quantities of combustible or flammable organic solvents - are common in the mining industry for recovering non-fe
Jan 1, 2006
-
The Cobalt Mining District: Silver Sources, Transport and DepositionBy Dan Marshall, David H. Watkinson
Abstract - Cobalt, Ontario, is renowned for the 12.6 billion grams (445 million ounces) of silver produced from the area since discovery in 1903 by workers of the Timiskaming and Northern Ontario Rail
Jan 1, 2000
-
Division Lectures - The 1961 Extractive Metallurgy Division Lecture - Separation Engineering on the MoonBy A. M. Gaudin
Jan 1, 1962
-
Floodplain Aggregate Mining in Western OregonBy E. F. Schnitzer
During 1996 and 1997, Oregon experienced flooding on a scale not seen in many years. Some gravel pits located near rivers experienced erosion. In several cases, breaches occurred between the gravel p
Jan 1, 1999
-
Summersville Raw Water IntakeBy Douglas Banks
Construction for the new 2.5 MGPD raw water intake project commenced December 2002. The project, initially designed as a 12' Ø concrete lined intake shaft,145' deep, with two offset 24" lake
Jan 1, 2005