Search Documents

Sort by

  • AUSIMM
    Drilling - Continuity - Mine Planning

    The AusIMM/AMIC code for reporting Reserves seeks to improve the calibre of professional reporting on this subject. But have they gone far enough? Should the code appreciate that the degree of reli

    Jan 1, 1989

  • CIM
    ERP Systems in the Brazilian Mining Industry: A Case Study

    By Paulo F. T. Sachs

    ERP systems have been widely implemented nowadays in several industries. However, ERP was originally designed to fit former MRP and MRP II users, and most of the ERP research has been focused on discr

    May 1, 2004

  • AIME
    Reservoir Engineering – Laboratory Research - Linear Waterflood Behavior and End Effects in Water-Wet Porous Media

    By J. R. Kyte, L. A. Rapoport

    The material balance equation for partiai or complete 1:trter-drivc reser1,oir.s been re-arranged to include a pressure irrferferencr ternr. This pressure interfernce term was ohtained from the theo

  • SME
    South Cobb Tunnel - Cobb County?s Solution To Meeting Future Waste Water Capacity

    By Wojciech Klecan

    Cobb County, located on the northwest side of Atlanta, GA, is continually growing and, like many other metropolitan areas, it needs to increase the capacity of its waste water system to meet future de

    Jan 1, 2009

  • NIOSH
    The Mineral Industry Of Other East African Countries - Burundi (5762e8c8-9f9a-4334-a3cd-7f4c0b3335ab)

    By Kevin Connor

    During 1986, the Government continued with efforts to ease the country's almost total reliance on coffee exports for trade revenues by allocating 45% of the Government's budget to commerce a

    Jan 1, 1988

  • NIOSH
    RI 3073 Extraction of Soluble Copper from Ores in Leaching by Percolation

    By Kenneth O. Bayard, John D. Sullivan

    "This repot continues the series of papers being prepared at the Southwest Experiment Station of the Bureau of Mines in cooperation with the department of mining and metallurgy, University of Arizona,

    Apr 1, 1931

  • NIOSH
    RI 9654 - Proceedings Of The Second International Workshop On Coal Pillar Mechanics And Design

    By Todd M. Ruff

    This report summarizes ongoing research at the National Institute for Occupational Safety and Health, Spokane Research Laboratory, in which collision warning systems for surface mining dump trucks are

    Jan 11, 2000

  • DFI
    Piled-Raft Foundation (PRF) Optimization Design With Connected And Disconnected Piles

    By A. Eslami

    In recent development of piled raft design, the contribution of both raft and piles to tolerate the loads is taken into account, depending on the stiffness and contributions of involved elements i.e.;

    Jan 1, 2008

  • AIME
    Institute of Metals Division - Thermodynamic Properties of Solid Fe-Au Alloys

    By L. L. Seigle

    Free energies, heats, and entropies of mixing of solid Fe-Au alloys have been measured by the galvanic cell method between 800° and 900°C. A positive deviation from Raoult's law and a large exces

    Jan 1, 1957

  • AUSIMM
    Utilisation of Latrobe Valley Brown Coal Fly-Ash

    By Milner A, Brockway D, Hodges S

    The combustion of brown coals in Latrobe Valley power stations produces approximately 500 000 tonnes of solid wastes each year. This material, which includes precipitator ash, char and furnace ash,

    Jan 1, 1992

  • SAIMM
    Optimization of the Cycle Time to Increase Productivity at Ruashi Mining

    By H. Thomas, I. N. M. Nday

    "*Paper written on project work carried out in partial fulfilment of BSc.Eng (Mining Engineering) degreeThe optimization of the cycle time to increase productivity at Ruashi Mining was an on-site proj

    Jul 1, 2019

  • CIM
    Evaluation of Ventilation On Demand (VOD) in Sudbury Mines

    By G. Lyle

    Since its inception CEMI (Centre for Excellence in Mining Innovation) has focused on facilitating innovative solutions to the mining industry in six strategic research areas; GeoRisk, ConstructMine, V

    Oct 1, 2010

  • AUSIMM
    Manganese and Iron in Broken Hill Sphalerite

    Individual specimens of sphalerite from the Broken Hill lode vary considerably in manganese and iron contents, even within the same orebody, so that study of the overall variation of manganese and iro

    Jan 1, 1956

  • SME
    Construction of a Low Rock Cover Cavern for the Neutrinos at Main Injector Facility

    By Bhaskar B. Thapa, Christopher Laughton, Michael P. Bruen

    At Fermilab, located in Batavia, Illinois, a 4,000-foot underground complex of tunnels and caverns is being excavated on a decline of six percent, at depths of up to350 ft, below grade. The site geolo

    Jan 1, 2001

  • AUSIMM
    Flotation Circuit Optimisation - Towards More Sustainable Practice

    Flotation Circuit Optimisation - Towards More Sustainable Practice

    Sep 13, 2010

  • AUSIMM
    Computer Usage for Grade Control and Short Term Planning

    Computer applications are ideally suited to the day to day operations of grade control and short term planning on a mine site. By refining this part of the operation there is scope to increase prof

    Jan 1, 1989

  • AUSIMM
    Large Excavations in Weak Mudstone for the Porgera Mine Plant Development

    The plant and processing site at Porgera has been built on a levelled mudstone ridge about lkm E of the mine. Excavation of 7xl06m3 of soil and rock was necessary to achieve the required area. The

    Jan 1, 1991

  • AUSIMM
    Analysis of Geological Mapping Data at the Cononish Gold-Silver Mine, Perthshire, Scotland

    By I M. Platten, C J. S Sangster, Y Xie

    The Cononish gold-silver deposit is a steep, relatively narrow quartz-vein system, with a current total mineral resource of 154 000 oz Au and 589 000 oz Ag. The northeast-southwest trending system was

    Jan 1, 2009

  • DFI
    Establishement Of Bearing Capacity And Integrity Of Cast-In-Place Piles By Means Of Dynamic Pile Tests ? Synopsis

    By H. Meseck

    Dynamic pile test methods to establish the bearing capacity of driven piles were developed in the USA more than 20 years ago. In the Federal Republic of Germany, the first dynamic pile tests were carr

    Jan 1, 2010

  • DFI
    Design And Construction Of A Cut-Off Wall In Warm Permafrost

    By Steven L. Anderson

    A cut-off wall has been designed and is currently under construction along the Back Dam of the existing tailings impoundment at Red Dog Mine, Alaska. The cut-off wall, which will be in the order of 5

    Jan 1, 2010