Search Documents

Sort by

  • NIOSH
    OFR-86-95 The Magnitude 5.3 Seismic Event And Collapse At The Solvay Trona Mine: Analysis Of Pillar/Floor Failure Stability - Acknowledgments

    By Peter L. Swanson

    This investigation, which began 90 minutes after the February 3, 1995, seismic event, has benefitted from the assistance of a large number of individuals. These individuals provided information, data,

    Jan 1, 2011

  • CIM
    Aluminum Ships: Myths and Facts

    By T. Lamb

    There are many honor stories about aluminum in the marine environment and many are not based on facts, so they are myths. Myths must be addressed before progress can be made. This paper attempts to di

    Jan 1, 2011

  • TMS
    Sulfur Deposition Impact on Surface Morphology of Fly Ash-Based Adsorbent for Mercury Removal

    By Wei Gao, Qing-cai Liu, Cun-fang Lu, Huimin Zheng, Jian Yang, Chun-ling Yao

    "Mercury in flue gas of coal-fired plants was concerned as another serious pollution when sulfur dioxide pollution was controlled now. The adsorbent made from fly ash by thermal precipitation sulfur t

    Jan 1, 2011

  • IMMS
    Borehole Mining Of Manganese At Subzero Temperatures

    By Gregory Abramov

    Borehole Mining (BHM), a remotely-operated waterjet mining method (Figure 1), has recently achieved two major milestones. It was, for the first time, applied to the extraction of manganese ore and at

    Jan 1, 2011

  • DFI
    Issues In The Performance-Based Seismic Evaluation Of Sheet Pile Quay Walls

    By Dimitris Pachakis

    In this paper, the authors give a brief overview of the current practice guidelines and tools for the seismic design of sheet pile quay walls, emphasizing how the design guidelines are lacking when th

    Jan 1, 2011

  • TMS
    Application of High-Power Nanosecond Pulses to Flotation Separation of Sulfide Minerals

    By Alexey T. Kovalev, Irina A. Khabarova, Valentine A. Chanturiya, Igor Zh. Bunin, Elizaveta V. Koporulina

    "The paper presents new theoretical and experimental results about mechanisms of disintegration of mineral complexes and structural transformations of the sulfide surface under high-power nanosecond e

    Jan 1, 2011

  • CIM
    Estimation Errors for Gold Inventory in Large Carbon-In-Leach Tanks

    By Jr. Blanchette, Claude Bazin, Paul Blatter

    "Reporting of the gold production during a month implies to estimate the mass of gold that is processed by a mill, recovered as dorés, lost to the tailings and the change of gold inventory within the

    Jan 1, 2011

  • CIM
    Modelling of the Gold Mineral Associations and Size Distribution of a Grinding Mill Product

    By M. R. Khalesi, S. Bellec, C. Bazin, D. Hodouin

    Batch grinding tests conducted on a gold ore indicated that gold is not randomly distributed within the size fractions of the ground ore. Since gold leaching performances were found to be dependent of

    Jan 1, 2011

  • ISEE
    Examination of Dynamic Parameters of Rocks using Hopkinson Bar Experiments

    By O. Rielo, A. Pascoal, P. Katsabanis

    The dynamic parameters of two different granites have been obtained using Hopkinson bar experiments. One series of experiments were conducted using a Hopkinson pressure bar apparatus with an explosive

    Jan 1, 2011

  • CIM
    In Situ Monitoring of Cemented Paste Backfill Pressure to Increase Backfilling Efficiency

    By M. W. Grabinsky, B. D. Thompson

    ABSTRACT: Use of cemented paste backfill (CPB) offers economic and environmental advantages over other backfill methods. However, many operations have limited knowledge of how their CPB behaves in sit

    Jan 1, 2011

  • SAIMM
    The Dual-Electrode DC Arc Furnace ? Modelling Insights

    By Q. G. Reynolds

    Keywords: Pyrometallurgy, furnace, DC, reverse polarity, dual-electrode The dual-electrode direct current (DC) arc furnace uses two graphite electrodes, one connected as cathode, and one as anode.

    Jan 1, 2011

  • CIM
    Processing of Ultramafic Ni Ores: Atypical Grade-Recovery Curves

    By T. Bhambhani, Mukund Vasudevan, Partha Patra, D. R. Nagaraj, P. Somasundaram

    Selective Ni separation from ultramafic ores rich in serpentines has been a huge challenge in the mineral processing industry, and therefore highly inefficient. Analysis of the root causes of the chal

    Jan 1, 2011

  • CIM
    Potential of Laser Welding and Friction Stir Welding for Joining AA1100-16 VOL.% B4C Metal Matrix Composite

    This work illustrates the potential of two welding processes for joining AA1100-16 vol.% B4C metal matrix composite: laser welding process using a 4 kW Nd:YAG laser and Friction Stir Welding. A compar

    Jan 1, 2011

  • SME
    Industrial Minerals Review 2010

    By R. L. Virta

    Ball Clay -- Four companies - H.C. Spinks Clay Co. Inc. (owned by Lhoist Group), Imerys Group (formerly Kentucky-Tennessee Clay Co.), Old Hickory Clay Co. and Unimin Corp. - mined ball clay in four st

    Jan 1, 2011

  • TMS
    Recycling of Ornamental Rock Waste into Clayey Ceramics

    By Mariane Costalonga de Aguiar, Carlos Mauricio Fontes Vieira, Sergio Neves Monteiro

    "This work evaluates the effect of incorporation of an ornamental rock waste into an industrial clayey body used for roofing tiles fabrication. Formulations with 0, 10, 20 and 30 wt.% of waste were pr

    Jan 1, 2011

  • SAIMM
    Effect Of Process Control Agent (PCA) On The Characteristics Of Mechanically Alloyed Ti-Mg Powders - Synopsis

    By C. Machio

    This paper reports the results of a study to determine the effect of process control agent (PCA) on the characteristics of Ti-Mg powders during milling. It has been shown that a 2% increase in PCA con

    Jan 1, 2011

  • SME
    Reclaiming Steep-Slope Eastern Coal Mines For Successful Reforestation

    A methodology has been developed and demonstrated to be effective in reclaiming surface-mined land for a forestry post-mining land use. The Forestry Reclamation Approach (FRA) has been applied, almos

    Jan 1, 2011

  • SAIMM
    Solidification Of An Al-Zn Alloy During Semi-Solid Processing - Synopsis

    By S. L. George

    The semi-solid metal casting process results in a unique solidification path. The microstructural features that were identified during the characterization of the as-cast microstructure, were used as

    Jan 1, 2011

  • ISEE
    Modeling Effect of Delay Scatter on Peak Particle Velocity of Blast Vibration Using a Multiple Seed Waveform Vibration Model

    By R Yang, M Lownds

    This paper reports studies showing the effects of delay scatter on the peak particle velocity (PPV) of blast vibration using a multiple seed wave (MSW) vibration model developed in recent years. The c

    Jan 1, 2011

  • SME
    Valuation And Canadian Reporting Standards - Problems And Solutions

    By R. Lawrence

    Mineral property valuations to be used for Canadian securities regulatory purposes must comply with CIMVal1. The technical basis for a CIMVal report is the same as that required for a technical repor

    Jan 1, 2011