Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Hybrid Shoring Design for the Courthouse Commons Tunnel in San Diego, California: Controlling and Predicting Ground Movements - NAT2022By Maryam Motamed, Jeremy Stone, Leigh Anne Zhang
Controlling and predicting ground movements are essential to the design of shoring systems. The Courthouse Commons tunnel in San Diego, California, included a 56-foot-deep temporary shaft as a launchi
Dec 1, 2022
-
Soil Conditioning for Potomac Group Soils in Washington DC - NAT2022By R. Aliberti, E. Comis, M. Wone
DC Water’s Clean Rivers (DCCR) program involves the construction of approximately 29 km (18 mi) of CSO tunnels in Potomac Group soils in the Washington DC area. Soils include an upper predominantly ov
Dec 1, 2022
-
Precision Drilling for the Pardee Chemical Feed Shaft Project - NAT2022By Emily Sing, Ashim Gajurel, Thomas Pennington, William Brown
The Pardee Chemical Feed Shaft Project involves construction of two new chemical feed shafts to improve raw water treatment capabilities at the East Bay Municipal Utility District’s (EBMUD) Pardee Res
Dec 1, 2022
-
The Northeast Boundary Tunnel—A TBM Performance Review - NAT2022By Elisa Comis, Jeffrey Peterson, Yama Ebrahimi
Construction of the Northeast Boundary Tunnel (NEBT), the last leg of the Anacostia River Tunnel System on DC Water’s Clean Rivers Project, started in September 2018 and was completed in April 2021. T
Dec 1, 2022
-
Slurry Wall Construction in Coarse-Grained Soils - NAT2022By J. Andrew McGlenn, Greg Emslie, Murray Gant
The Second Narrows Water Supply Tunnel will ensure system reliability in the event of a major earthquake and increase the Greater Vancouver Water District’s capacity to meet a growing population’s lon
Dec 1, 2022
-
Analysis and Design of Tunnel Lining Through a Potentially Displaceable Fault - NAT2022By Theodore Feldsher, Seung Han Kim, Mourad Attalla, John Roadifer, Chu-Chieh Jay Lin
Lifelines in seismic regions of the world seldom can escape crossing active faults. Cities in California have been mitigating this risk by constructing improved fault crossings. This paper discusses t
Dec 1, 2022
-
Design and Construction of NEORSD’s Doan Valley Storage Tunnel - NAT2022By Timothy O’Rourke, Karrie Buxton, Chris Lynagh, Daniel Dobbels, Frederick Vincent
The Doan Valley Storage Tunnel Project in Cleveland Ohio was constructed to control Combined Sewer Overflows (CSOs). It is a complex system of three tunnels ranging from 8.5 to 18 feet in diameter wit
Dec 1, 2022
-
Design and Construction of a Shallow Twin Tube Bifurcation— Atlanta Plane Train West Extension Project - NAT2022By John Murray, Daniel Ebin, Robert Gould, Yiming Sun, Lizan Gilbert
The Atlanta Plane Train Tunnel West Extension is being constructed at Hartsfield-Jackson Atlanta International Airport using the Sequential Excavation Method (SEM). The tunnel has shallow ground cover
Dec 1, 2022
-
Implementation of Vibration Monitoring to Improve Blast Design for the Mitchell Point Crossing - NAT2022By Nathaniel White, Todd Kilduff, Justin Laviolette, Dan Laviolette, Randy Zeigler, Sean Sundermann
The Mitchell Point tunnel is a part of several ongoing efforts to connect the 12-mile-long Historic Columbia River trail between Mitchell Point Outlook to Mitchell Point Drive. The tunnel lies inside
Dec 1, 2022
-
Slurry Treatment Plants in Mechanized Tunneling Operations— Safety, Performance and Cost Factor for Jobsites - NAT2022By Gino Vogt
In mechanized tunnelling operations, performance, consumption and safety are main factors for jobsites. One of the most important components effecting these factors, especially in slurry TBM operation
Dec 1, 2022
-
Design of Precast Segmental Tunnel Lining for Pawtucket CSO Tunnel Project - NAT2022By Irwan Halim, Seung Han Kim
This paper will describe design of precast segmental tunnel lining for the Pawtucket CSO Tunnel Project in Providence, Rhode Island. The tunnel is 11,700 LF long with 30-foot finished diameter to be c
Dec 1, 2022
-
The IPMI Journal 2022By IPMI Educational and Scientific Foundation
It is with great pleasure that we announce the availability of this fourth issue of the IPMI Journal, a publication of the International Precious Metals Educational and Scientific Foundation. This dig
Dec 1, 2022
-
Tunnel Load Rating—A Case Study: Port of Miami Tunnel - NAT2022By Ali Kazmi, Wern-ping N. Chen
A load rating procedure was performed to evaluate safe load capacity of the Port of Miami Tunnel (POMT), FDOT Tunnel No. 871071 SR 887. The rating procedure performed on a total of eleven stations ben
Dec 1, 2022
-
Mechanized Tunneling in Flowable River Sands—The TBM Drives of the Annacis Island WWTP New Outfall System - NAT2022By John Newby, Edward Kennedy, Ulf Gwildis
Alluvial deposits of major rivers often provide relatively uniform tunneling conditions. However, these conditions pose specific challenges due to the tunneling behavior of the granular soils as flowi
Dec 1, 2022
-
Long Distance Tunnelling: Challenges and Trends - NAT2022By Karin Bäppler
Mechanized tunnelling is undoubtedly one of the most innovative disciplines in the international construction industry. Technological progress in the planning and production of most modern infrastruct
Dec 1, 2022
-
TBM Breakthroughs in Pressurized Conditions—Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) and Northeast Boundary Tunnel (NEBT) Projects - NAT2022By Francesco Chiappalone, Filippo Azzarà, Raffaele Aliberti, Daniele Nebbia, Lance Waddell
As part of the 3RPORT and NEBT Projects, 5-mile Combined Sewer Overflow Tunnels were excavated with a 19 ft diameter Slurry and 26 ft diameter EPB Tunnel Boring Machines. Due to the difficult geologic
Dec 1, 2022
-
E-Power Pipe®: Two-Stage Trenchless Method for Long Drives in Small Diameters - NAT2022By Peter Schmäh, Tobias Engel
The E-Power Pipe technology was originally developed for the trenchless installation of protective pipes and pipelines of 10" to 28" diameter, over long distances of more than 4,000 ft. The twostage p
Dec 1, 2022
-
Commuter Rail Tunnel Alignment Studies for the Pennsylvania Avenue Extension, San Francisco - NAT2022By Sarah Wilson, John Kaplin
Plans are underway to extend commuter rail service underground into downtown San Francisco. The Salesforce Transit Center (STC) was completed in 2018 and will serve as a new transit hub, including a c
Dec 1, 2022
-
Tga Kinetic Analyses Of Zinc Ferrite Reduction With H2By VIVEK KASHYAP, EVODY TSHIJIK KARUMB, PATRICK TAYLOR
Zinc ferrite is considered an integral phase of zinc residues as their presence can render the processing of zinc and critical metals difficult. It is a refractory phase, formed at high temperature in
Dec 1, 2022
-