Search Documents

Sort by

  • SME
    Lateral Deflections and Vertical Control in Tunnel Control Networks - NAT2022

    By Joern Katzer

    It is vitally important to any tunnel project to have an accurate and reliable survey control network inside the tunnel for layouts, as-built surveys, and to provide guidance to the tunnel boring mach

    Dec 1, 2022

  • SME
    Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) City of Fort Wayne Tunnel Alignment and Adit Redesign in Construction: A Schedule Driven Journey - NAT2022

    By Todd S. Webster, Matthew J. Pierce, Brad D. Krumel

    With the Working Shafts and Starter Tunnel under way, it became apparent this 4.7-mile, 19-foot diameter wet weather tunnel was going to live up to its name. The shaft’s pre-excavation grouting was co

    Dec 1, 2022

  • SME
    Analytical Behavior of a Tunnel with Rock Bolts and Shotcrete During an Extreme Fire Event - NAT2022

    By Dean Newman, Michael Behrens, Mark Trim, Justin Arifin

    Road tunnels in recent infrastructure projects in Sydney, Australia, are designed to have a fire resistance level of either a 4-hour cellulosic fire or a 2-hour hydrocarbon fire. Where permanent groun

    Dec 1, 2022

  • SME
    Deep Rock Wastewater Tunnel in Delco - NAT2022

    By Dafydd Chandler, Milissa Hirst, Charles Hurst, Gary Snyder, Leszek Glodkowski

    The Delaware County Regional Water Quality Control Authority (DELCORA) will be adding tunnel infrastructure to its wastewater conveyance system. This program involves the construction of a conveyance/

    Dec 1, 2022

  • SME
    Hybrid Shoring Design for the Courthouse Commons Tunnel in San Diego, California: Controlling and Predicting Ground Movements - NAT2022

    By Maryam Motamed, Jeremy Stone, Leigh Anne Zhang

    Controlling and predicting ground movements are essential to the design of shoring systems. The Courthouse Commons tunnel in San Diego, California, included a 56-foot-deep temporary shaft as a launchi

    Dec 1, 2022

  • SME
    Soil Conditioning for Potomac Group Soils in Washington DC - NAT2022

    By R. Aliberti, E. Comis, M. Wone

    DC Water’s Clean Rivers (DCCR) program involves the construction of approximately 29 km (18 mi) of CSO tunnels in Potomac Group soils in the Washington DC area. Soils include an upper predominantly ov

    Dec 1, 2022

  • SME
    Precision Drilling for the Pardee Chemical Feed Shaft Project - NAT2022

    By Emily Sing, Ashim Gajurel, Thomas Pennington, William Brown

    The Pardee Chemical Feed Shaft Project involves construction of two new chemical feed shafts to improve raw water treatment capabilities at the East Bay Municipal Utility District’s (EBMUD) Pardee Res

    Dec 1, 2022

  • SME
    The Northeast Boundary Tunnel—A TBM Performance Review - NAT2022

    By Elisa Comis, Jeffrey Peterson, Yama Ebrahimi

    Construction of the Northeast Boundary Tunnel (NEBT), the last leg of the Anacostia River Tunnel System on DC Water’s Clean Rivers Project, started in September 2018 and was completed in April 2021. T

    Dec 1, 2022

  • SME
    Slurry Wall Construction in Coarse-Grained Soils - NAT2022

    By J. Andrew McGlenn, Greg Emslie, Murray Gant

    The Second Narrows Water Supply Tunnel will ensure system reliability in the event of a major earthquake and increase the Greater Vancouver Water District’s capacity to meet a growing population’s lon

    Dec 1, 2022

  • SME
    Analysis and Design of Tunnel Lining Through a Potentially Displaceable Fault - NAT2022

    By Theodore Feldsher, Seung Han Kim, Mourad Attalla, John Roadifer, Chu-Chieh Jay Lin

    Lifelines in seismic regions of the world seldom can escape crossing active faults. Cities in California have been mitigating this risk by constructing improved fault crossings. This paper discusses t

    Dec 1, 2022

  • SME
    Design and Construction of NEORSD’s Doan Valley Storage Tunnel - NAT2022

    By Timothy O’Rourke, Karrie Buxton, Chris Lynagh, Daniel Dobbels, Frederick Vincent

    The Doan Valley Storage Tunnel Project in Cleveland Ohio was constructed to control Combined Sewer Overflows (CSOs). It is a complex system of three tunnels ranging from 8.5 to 18 feet in diameter wit

    Dec 1, 2022

  • SME
    Design and Construction of a Shallow Twin Tube Bifurcation— Atlanta Plane Train West Extension Project - NAT2022

    By John Murray, Daniel Ebin, Robert Gould, Yiming Sun, Lizan Gilbert

    The Atlanta Plane Train Tunnel West Extension is being constructed at Hartsfield-Jackson Atlanta International Airport using the Sequential Excavation Method (SEM). The tunnel has shallow ground cover

    Dec 1, 2022

  • SME
    Implementation of Vibration Monitoring to Improve Blast Design for the Mitchell Point Crossing - NAT2022

    By Nathaniel White, Todd Kilduff, Justin Laviolette, Dan Laviolette, Randy Zeigler, Sean Sundermann

    The Mitchell Point tunnel is a part of several ongoing efforts to connect the 12-mile-long Historic Columbia River trail between Mitchell Point Outlook to Mitchell Point Drive. The tunnel lies inside

    Dec 1, 2022

  • SME
    Slurry Treatment Plants in Mechanized Tunneling Operations— Safety, Performance and Cost Factor for Jobsites - NAT2022

    By Gino Vogt

    In mechanized tunnelling operations, performance, consumption and safety are main factors for jobsites. One of the most important components effecting these factors, especially in slurry TBM operation

    Dec 1, 2022

  • SME
    Design of Precast Segmental Tunnel Lining for Pawtucket CSO Tunnel Project - NAT2022

    By Irwan Halim, Seung Han Kim

    This paper will describe design of precast segmental tunnel lining for the Pawtucket CSO Tunnel Project in Providence, Rhode Island. The tunnel is 11,700 LF long with 30-foot finished diameter to be c

    Dec 1, 2022

  • IPMI
    The IPMI Journal 2022

    By IPMI Educational and Scientific Foundation

    It is with great pleasure that we announce the availability of this fourth issue of the IPMI Journal, a publication of the International Precious Metals Educational and Scientific Foundation. This dig

    Dec 1, 2022

  • SME
    Tunnel Load Rating—A Case Study: Port of Miami Tunnel - NAT2022

    By Ali Kazmi, Wern-ping N. Chen

    A load rating procedure was performed to evaluate safe load capacity of the Port of Miami Tunnel (POMT), FDOT Tunnel No. 871071 SR 887. The rating procedure performed on a total of eleven stations ben

    Dec 1, 2022

  • SME
    Mechanized Tunneling in Flowable River Sands—The TBM Drives of the Annacis Island WWTP New Outfall System - NAT2022

    By John Newby, Edward Kennedy, Ulf Gwildis

    Alluvial deposits of major rivers often provide relatively uniform tunneling conditions. However, these conditions pose specific challenges due to the tunneling behavior of the granular soils as flowi

    Dec 1, 2022

  • SME
    Long Distance Tunnelling: Challenges and Trends - NAT2022

    By Karin Bäppler

    Mechanized tunnelling is undoubtedly one of the most innovative disciplines in the international construction industry. Technological progress in the planning and production of most modern infrastruct

    Dec 1, 2022

  • SME
    TBM Breakthroughs in Pressurized Conditions—Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) and Northeast Boundary Tunnel (NEBT) Projects - NAT2022

    By Francesco Chiappalone, Filippo Azzarà, Raffaele Aliberti, Daniele Nebbia, Lance Waddell

    As part of the 3RPORT and NEBT Projects, 5-mile Combined Sewer Overflow Tunnels were excavated with a 19 ft diameter Slurry and 26 ft diameter EPB Tunnel Boring Machines. Due to the difficult geologic

    Dec 1, 2022