    Development of a model to determine oxygen consumption when crawling - SME Transactions 2015

    By P. G. Dempsey, J. R. Heberger, J. P. Pollard

    During a mine disaster or emergency, underground air can quickly become contaminated. In these circumstances, all underground mine workers are taught to don breathable air supply units at the first si

    Jan 1, 2015

  • SME
    Stress corrosion cracking – hypothetically a major threat to underground mine roof support systems and rock anchors - SME Transactions 2015

    By G. Bylapudi, A. Bhagwat, K. Mondal, A. J. S. (Sam) Spearing

    Minimizing the effects of corrosion improves the long-term performance of the rock anchors and ground control systems in underground mines, which is fundamental for safe operation over the design peri

    Jan 1, 2015

  • SME
    CFD analysis on gas distribution for different scrubber redirection configurations in sump cut - SME Transactions 2015

    By L. Zhou, J. P. Rider, T. W. Beck, J. A. Organiscak, Y. Zheng

    The National Institute for Occupational Safety and Health’s Office of Mine Safety and Health Research recently developed a series of models using computational fluid dynamics (CFD) to study the gas di

    Jan 1, 2015

  • SME
    A design tool for improving the safety of highwall mining operations - SME Transactions 2015

    By Y. Luo

    Highwall mining, which is a relatively new mining method, is a preferred and often the only feasible method for extracting coal reserve left by surface mining operations in areas with steep terrain an

    Jan 1, 2015

  • IIMP
    Ingeniería & construcción del Starter Dam en Minera Chinalco Perú S.A.

    By José De La Cruz

    Para la construcción del dique de arranque de una planta concentradora es importante considerar la ingeniería y diseño del mismo -en tanto debe realizarse un diseño adecuado y así evitar problemas a l

    Dec 1, 2014

  • IIMP
    Estudio psicrométrico y análisis técnico de aplicación de aire acondicionado en mina Cobriza

    By Daniel I. Naupari Escobar

    El presente texto señala las técnicas de campo empleadas en la mina Cobriza para el estudio base del sistema de ventilación desde el punto de vista psicrométrico, así como la evaluación del comportam

    Dec 1, 2014

  • SME
    NAT 2014 Full Proceedings - NAT2014

    By Gregg Davidson, Lonnie Jacobs, Brett Zernich, Alan Howard, Robert Pintabona

    All Rights Reserved. Printed in the United States of America. Information contained in this work has been obtained by SME, Inc. from sources believed to be reliable. However, neither SME nor its autho

    Dec 1, 2014

  • AUSIMM
    Strategic Underground Mine Access Design to Maximise the Net Present Value

    By P A. Grossman, J H. Rubinstein, M Brazil, K G. Sirinanda

    To date, the scheduling and access design of an underground mine have only been considered as two separate optimisation problems. First, access to the mine is designed and then the scheduling is compl

    Nov 24, 2014

  • AUSIMM
    Adaptation of an Open Pit Optimiser for Underground Strategic Planning

    By M Bloss, B Roberts

    BHP Billiton Olympic Dam required a well-tested software product suitable for strategic optimisation and scheduling of options for a potential underground mining project. The company has a standard so

    Nov 24, 2014

  • AUSIMM
    Optimising a Mineral Supply Chain under Uncertainty with Long-term Sales Contracts

    By J Zhang, R Dimitrakopoulos

    A two-stage stochastic mixed integer non-linear program is formulated for a mining complex to optimise strategic and tactical plans. The objective is to find the near optimal decisions for a mineral s

    Nov 24, 2014

  • AUSIMM
    Implementing a New Heuristic Approach to the Underground Mine Stope Layout Problem

    By M W. A Asad, E Topal, D S. S Sandanayake

    Underground mine planning requires an optimal stope layout as a prerequisite for the definition of an optimal production schedule. The procedure to generate an optimal stope layout considers an orebod

    Nov 24, 2014

  • AUSIMM
    Stochastic Optimisation of Mineral Value Chains – Developments and Applications for the Global Optimisation of Mining Complexes with Uncertainty

    By R Dimitrakopoulos, R Goodfellow

    One of the primary objectives when optimising a mining complex is to maximise its value for the primary stakeholders. In order to achieve this objective, it is necessary to holistically optimise all a

    Nov 24, 2014

  • AUSIMM
    An Open Pit Multistage Mine Production Scheduling Model for Drilling, Blasting and Excavating Operations

    By S Q. Liu, E Kozan

    This paper proposes a new multiresource multistage scheduling problem for optimising the open pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is

    Nov 24, 2014

  • AUSIMM
    Comparison between Gaussian Processes and Dynamic Time Warping for Classification of Marker Shales in Iron Ore Deposits

    By A Melkumyan, K Silversides

    The banded iron formation-hosted iron ore deposits located in the Hamersley Ranges of Western Australia contain marker shales that are used to distinguish lithology for geological and orebody mapping.

    Nov 24, 2014

  • AUSIMM
    Sensor-based Real-time Resource Model Reconciliation for Improved Mine Production Control – A Conceptual Framework

    By M W. N Buxton, M S. Shishvan, J Benndorf

    The flow of information, and consequently the decision-making along the chain of mining from exploration to beneficiation, typically occurs in a discontinuous fashion over long timespans. In addition,

    Nov 24, 2014

  • AUSIMM
    Applying Modern Heuristics to Maximising Net Present Value through Cut-off Grade Optimisation

    By C A. Myburgh, S Craig, K Deb

    In focusing on open pit mine scheduling, one of the biggest areas that a mining engineer can add value is in the area of cut-off grade optimisation. It is not atypical to add up to an extra 20 per cen

    Nov 24, 2014

  • AUSIMM
    Aligning Resource Estimates with Mine Planning

    By D Kentwell

    A resource model serves two main purposes depending on the stage of a project. The first is to provide an early indication of likely tonnages and grades at certain cut-offs so that decisions can be ma

    Nov 24, 2014

  • AUSIMM
    Multivariate Block Simulations of a Lateritic-type Nickel Deposit and Post-processing of a Representative Subset

    By J Deraisme, P Epinoux, O Bertoli

    "Société le Nickel exploits the Dôme lateritic nickel orebody at its Tiébaghi operations in New Caledonia. The site geology has an obvious bearing on recovery and metallurgical performance, with contr

    Nov 24, 2014

  • AUSIMM
    Production Schedule Optimisation – Meeting Targets by Hedging against Geological Risk while Addressing Environmental and Equipment Concerns

    By M Spleit

    A long-term production schedule for the LabMag iron ore deposit in northern Quebec, Canada is derived using stochastic integer programming. The optimisation formulation maximises the schedule’s net pr

    Nov 24, 2014

  • AUSIMM
    An Application of Simultaneous Optimisation – Improving the Payback Period of a Zinc-Copper Open Cut Project

    By D J. Thobaven

    Project financing challenges caused by declining commodity prices have heightened the need to improve project metrics such as minimising capital payback and maximising net present value (NPV). Khnaigu

    Nov 24, 2014