Innovative Driven Pile Solution for the Rhode Island Route 6/10 Interchange ProjectBy Seth H. Hamblin, Leo J. Hart, John E. Regan
The Route 6 /10 10 Interchange Design/Build project, located in Providence, Rhode Island, involves the design and construction of five (5) new elevated bridge structures to replace and reconfigure the
Jan 1, 2019
-
Innovative Use of an Active Soil Nail Wall in Lieu of Pit Underpinning for a Historic BuildingBy Tai Luu, Maxim C. Schisler, Yaser Taheri
The Stevens Gateway Project is an expansion of the Stevens Institute campus overlooking the Hudson River in Hoboken, NJ. The plans call for 90,000 ft2 (8360 m2) of new classroom, research, and student
Jan 1, 2019
-
Identification and Quantification of Pile RelaxationBy Patrick J. Hannigan, Alex Ryberg, Rozbeh B. Moghaddam
Driven piles are widely used for foundation support. In the vast majority of cases, an increase in pile capacity occurs with time which is referred to as “set-up.” However, in a very limited number of
Jan 1, 2019
-
An Improved Load Measuring Device for Underground Mining Standing SupportsBy B. Mirabile, B. Stables
Standing support is often used in conjunction with underground retreat mining. Knowledge of the load-displacement behavior of a standing support, and loading induced by the mine opening is critical to
Jan 1, 2019
-
Application of High Pressure Grinding Roll Technology in Silver Heap LeachingBy J. Bilant, B. Carlson, N. Gow
High Pressure Grinding Roll (HPGR) technology has been evaluated to replace tertiary cone crushing at Coeur Rochester operations (Coeur Rochester, Inc.) as an opportunity to improve silver recovery. I
Jan 1, 2019
-
Accuracy of Low-Strain Pile Integrity Test ResultsBy Mahesh Hingorani
Integrity issues for bored cast-in-situ piles have raised the need for the use of non-destructive tests to verify pile integrity and detect possible anomalies in installed pile sections that could adv
Jan 1, 2019
-
A Fully Connected Jobsite is a Must for the FutureBy Christian Hoyme, Jochen Maurer
Most of the current foundation projects are suffering from disconnected information silos. In the first silo there is the planning of the project with corresponding data, presented by paper or digital
Jan 1, 2019
-
Consultants Can Be Safe, Too – A Collaborative ApproachBy Brian FitzPatrick, Michael J. Weaver
Everyone has a role in site safety, even consultants. This paper presents a summary of how a geotechnical and environmental consulting firm, with field staff on construction and subsurface exploration
Jan 1, 2019
-
Cost and Technical Comparison of Non-Destructive Test Methods for Drilled ShaftsBy Ronnie Melker, Joel Webster, Daniel Belardo, Thomas Hyatt
Quality assurance of drilled shafts is highly dependent upon the construction practices used during the excavation and concrete placement process. When performed under slurry, challenges are presented
Jan 1, 2019
-
Cost Effective Excavation Support in SeattleBy Richard D. Luark, Fernanda S. Madrona
Deep foundation construction in highly developed urban settings pose unique challenges of working with deep excavations in a relatively confined area while preserving the integrity of nearby structure
Jan 1, 2019
-
Crosshole Sonic Logging Versus Perimeter Sonic Logging: What Have We Learned?By Cory McElprang, Enamul Hoque, Aaron Thomas, Scott A. Jacobs
Crosshole Sonic Logging (CSL) only evaluates concrete on the inside of reinforcing cages leaving the outside unevaluated unless other types of testing are performed such as Perimeter Sonic Logging (PS
Jan 1, 2019
-
Deep Excavation Support: Innovative Shoring Design in an Urban EnvironmentBy Richard D. Luark, Fernanda S. Madrona
Designing temporary retaining systems that allow for deeper excavation amid the existing urban infrastructure has become a challenge. A 60-foot-deep excavation in downtown Seattle was required to cons
Jan 1, 2019
-
Definition of Drilling-Activity Patterns Based on Production Data ProfilesBy Diego Bellato
Production data recorded by special foundation rigs during construction activities at the site are commonly used for quality assurance / quality control procedures and, in particular, to prove that th
Jan 1, 2019
-
Design and Construction Benefits of Performing a Bi-Directional Test on a Drilled Shaft in Sand, Gravel, and Cobble DepositsBy Marco Fellin, Van E. Komurka
Significant cost and construction benefits were obtained from performing a bi-directional static load test prior to construction on the Russell Street Bridge Replacement project in Missoula, Montana.
Jan 1, 2019
-
Design and Construction of Mixed Ground Working Platform for a CCR Surface ImpoundmentBy Juan M. Pestana, Jeremy M. Gasser, Cuneyt Gokmen, Paul J. Sabatini, William Tanner, Daniel J. Woeste
An access pathway and working platform were designed and constructed for equipment access for a Deep Soil Mixing (DSM) pilot study over a coal combustion residual (CCR) surface impoundment (SI). The D
Jan 1, 2019
-
Design and Construction of Permanent Sheet and Pipe Pile Basement Walls with the Press-in Piling MethodBy Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano
Using sheet piles and pipe piles for permanent earth retaining is one of the most economical methods for constructing basement walls since they can also work as temporary shoring during construction.
Jan 1, 2019
-
Ground Freezing: The Use of Liquid Nitrogen Systems Converted To BrineBy Joseph A. Sopko
There has been a trend in recent years in performing the initial formation freezing using liquid nitrogen (LIN) and then converting the system to circulating refrigerated brine. While proponents of th
Jan 1, 2019
-
Efficient Torque-Installed Pile Use in Southern CaliforniaBy Jason Buenker, Molly Winston
Torque-installed piles are gaining popularity in Southern California as the go-to deep foundation element for small- to medium-capacity loads in urban environments. The torque-installed pile is a disp
Jan 1, 2019
-
Elimination of Environmental Footprint: LVCC Expansion - Foundation InstallationBy Zachary Q. Maassen
Upon approval from the Las Vegas Convention and Visitors Authority (LVCVA), Turner/Martin Harris, A Joint Venture began construction on the estimated $860 million expansion for the Las Vegas Conventio
Jan 1, 2019
-
Origins of Electrorerefining: Birth of the Technology and the World's First Commercial ElectrorefineryBy A. E. Wraith, J. Protheroe Jones, P. J. Mackey
The world’s first copper electrorefinery started production in 1869 at Burry Port in South Wales. Built within the Pembrey Copper Works which had commenced smelting operations in 1849, the new refiner
Jan 1, 2019