  • CIM
    Start Up, Commissioning and Optimization of the Gravity Circuit at Atlantic Gold’s Moose River Project in Eastern Canada

    By C. Hudson, D. Tremblay, A. Frey

    "A discussion of the design, challenges and successes associated with the commissioning of the gravity recovery circuit at Canada’s newest open pit gold mine - Atlantic Gold’s Moose River Consolidated

    Jan 1, 2019

  • CIM
    Maximising Hoisting Capacity Whilst Minimising Capital Investment

    By A. A. Wessels, D. P. Allison

    "Mine hoists are built to handle a certain nameplate capacity; they are specified and designed according to the required duty. However, as production capacity increases in other parts of an operation,

    Jan 1, 2019

  • CIM
    Innovative Technologies for Copper Smelting and Electric Slag Cleaning and Matte Settling Furnaces

    By A. Esterhuizen, S. Essack, H. Joubert, N. Fowler

    Tenova Pyromet has developed innovative technologies for copper smelting and electric slag cleaning furnaces. Based on client feedback and requirements, innovative designs have been developed to addre

    Jan 1, 2019

  • CIM
    Anode Furnace Off-Gas NOX Emissions Improvements at Rio Tinto Kennecott

    By Arsenio Enriquez, Adrian Deneys, Ryan Walton, Jenny Esker

    NOx emissions at the Rio-Tinto Kennecott Copper (RTKC) smelter, near Salt Lake City, Utah, are regulated to a compliance emission limit at the Main Stack of 15.9 kg/hr on an annual rolling average. Th

    Jan 1, 2019

  • CIM
    Techno-Economic of an Ice Stope Thermal Storage for Mine Heating and Cooling in Sub-Arctic Climates

    By K. Trapani

    "The study undertaken aims to investigate an ice stope heating and cooling system for its potential to be implemented in sub-arctic mines, as a low carbon alternative to conventional natural gas and r

    Jan 1, 2019

  • CIM
    Using Piston–Die Press Tests for Preliminary Sizing and Selection of a High-Pressure Grinding Roll

    By P. Rosario

    "Industry practice for high-pressure grinding roll (HPGR) assessment and sizing relies on tests using pilot-scale machines with 0.7–1.0 m roll diameters. Typically 1–10 t of sample are required, depen

    Jan 1, 2019

  • SME
    Dry Beneficiation of High Silica Blue Dust –Turning Waste to Wealth

    By G. E. Sreedhar, R. Kumar

    The pockets of high silica blue dust across the entire high grade hematite deposits in the Bailadila sector bothers the excavation activity due their iron content, which is higher than the threshold v

    Jan 1, 2019

  • SME
    Exploration of Petrographic, Elemental, and Material Properties of Dynamic Failure-Prone Coals

    By Lawson. Heather

    "The purpose of this study is to explore how the geochemical and petrographic components of coal may impact its physical properties, as well as how these components correlate with a history of reporta

    Jan 1, 2019

  • CIM
    Selective Extraction of Copper from Copper Concentrates Containing High-Arsenic under High Pressure Oxidative Leaching

    By Kazutoshi Haga, Batnasan Altansukh, Atsushi Shibayama

    In this study, the dissolution behavior of copper and arsenic from five different copper concentrates containing 21-34.7 %wt. of Cu, 1.3-7.3 %wt. of As and 15.6-27.5 %wt. of Fe were investigated under

    Jan 1, 2019

  • CIM
    Effect of Cold Working on Microstructure and Performance of CuCrZr Alloys

    By H. Huang, H. M. Chen, W. B. Xie

    Cu-0.8Cr-0.1Zr alloy were prepared by atmospheric melting. the microstructure and properties of the CuCrZr alloy after first cold rolled, solid solution, second cold rolled and aging treatment were an

    Jan 1, 2019

  • CIM
    Flowsheets of the Future

    By Marko Lampi, Ross Andrews, Jouni Pihlasalo, Robert Matusewicz

    With widespread discussion on reducing carbon, sulphur and other emissions, use of sustainable energy sources and the pivotal circular economy theme, consideration needs to be given to pyrometallurgic

    Jan 1, 2019

  • CIM
    Challenges in Pneumatic Conveying of Concentrate and Flue Dust at Copper Smelters

    By E. Lehtila, J. J. Talja, R. Jahila

    Kopar Oy is acknowledged for engineering and manufacturing of robust systems for bulk material handling, especially at power plants and non-ferrous smelters. We have over thirty years of experience wi

    Jan 1, 2019

  • CIM
    First Commercialisation of the Albion Process™ For Copper

    By Paul Voigt, Mike Hourn, Glenn Stieper

    Sable Zinc Kabwe Limited ("Sable") is a base metal processing plant, two kilometres south of Kabwe Town in Central Province, Zambia. The region has a rich history in mining and minerals production, be

    Jan 1, 2019

  • ISEE
    Effects of Aggregate Production Blasting on an Adjacent 42” (1.067m) Pipeline

    By John Babcock, Bryan C. Smith

    In a partnership between Luck Stone Corporation and Loudoun Water, a 42” (1.067m) steel pipeline was constructed along the perimeter of an extensive permitted reserve of diabase rock Luck Stone was ab

    Jan 1, 2019

  • CIM
    Unsustainability of Very Large Gold Producers—12 Years Later

    By H. R. Bullis

    "A 2003 paper discussed the idea that as gold mining companies grow larger it becomes more difficult for them to discover or acquire new gold deposits large enough to replace extracted reserves on an

    Jan 1, 2019

  • CIM
    Coal Mine Rock Dust Dispersibility Tests after Absorbing Moisture

    By R. C. Gilmore, J. F. Brune

    "Pulverized limestone rock dust used in United States underground coal mines to prevent and suppress coal dust explosions must easily disperse by forces of a methane or coal dust explosion. Moisture i

    Jan 1, 2019

  • CIM
    Peirce-Smith Converters: Automation, Design, Operation and Environmental Improvements at Kansanshi Copper Smelter

    By David deVries, James Rajith, Paul Mascrenhas, Nurzhan Dyussekenov, Lawrence Hanschar

    Kansanshi Copper Smelter commenced operation in March 2015. The smelter features four Peirce- Smith Converters (PSCs) operated in a three hot, two blowing configuration. This paper describes some of t

    Jan 1, 2019

  • ISEE
    Excavation of a Tunnel to Reach a Large Underground Cavern Roof Fall

    By H. S. Venkatesh R. Balachander, G. C. Naveen

    During the construction of a 1020 MW underground hydroelectric project in Bhutan a huge rock fall took place in the Downstream Surge Chamber (DSC) during March 2016. The total quantity of rock in the

    Jan 1, 2019

  • ISEE
    Transforming Underground Blasting Operations into Primary Crushing Operations

    By Christopher Jon Preston, Troy Williams, Daniel Roy

    There has been significant progress made with narrow vein gold mines in which a second option for crushing has begun to attract attention. To ensure the profitability of a mine that has based its econ

    Jan 1, 2019

  • CIM
    Maximizing Energy Efficiency in Smelter Feed Drying

    By C. -G. Berg, J. T. Tuominen

    Since the beginning of the 20th century, energy efficiency in copper smelting has been improved by a factor of 30 as a result of adopting autogenous smelting processes with more and more efficient was

    Jan 1, 2019