Under Pressure: Geotechnical Forces and Conditions at Work on the Ohio River Tunnel Project - RETC2021By Ross Goodman, Jesse Salai
The Ohio River Tunnel Project encountered multiple unexpected geotechnical challenges such as crown and invert instability due to the overstress condition affecting the strata above, below, and in the
Jun 13, 2021
-
Lessons Learned at the Trampas Dam Inlet/Outlet Tunnel - RETC2021By Todd Kilduff, Paul Wilkinson
Microtunneling is rarely a straight forward “business as usual” endeavor. More often than not, these projects take twists and turns that require on the fly, out of the box solutions to get the project
Jun 13, 2021
-
Abrasivity and Cutter Life Assessment for TBM Tunneling in Cobbles and Boulders - RETC2021By Steven W. Hunt, Glen R. Frank
Assessment of abrasivity and cutter life are necessary to properly manage risks when tunneling in mixed face ground which includes ground with cobbles and boulders. Maximizing cutter life requires: (1
Jun 13, 2021
-
Steady State, Groundwater Inflows in Deep Rock Tunnels - RETC2021By MARK J. VANARELLI
Estimating groundwater inflows in rock deep tunnels is critical to the safety of personnel constructing the tunnel and the cost of construction. This paper presents two case studies for estimating ste
Jun 13, 2021
-
Composite Segmental Lining to Resist a Fault Rupture - RETC2021By Girish Roy, Robert Goodfellow, Angel Del Amo, Bingzhi Yang
Designing and constructing tunnels in seismic prone areas present unique challenges to both designers and contractors. The Westside Purple Line Extension Project– Section 3 in Los Angeles requires cro
Jun 13, 2021
-
Courthouse Commons Inmate Transfer Tunnel: Tunneling Through San Diego Using Alternative Delivery - RETC2021By Sam Lo Grasso, Carlos Herranz Calvo, Stuart Warren, Ted Giesing, Charles Marchesano
Mott MacDonald and Project Management Advisors are providing Technical and Project Management services for San Diego County for the Courthouse Commons Project. The Courthouse Commons Project involves
Jun 13, 2021
-
Remote Vein Miner—Uncovering an Opportunity for Tunneling Projects - RETC2021By Jamal Rostami, Mark Board, Clayr Alexander, Muthu Vinayak Thyagarajan
In the past several decades, many major equipment manufacturers have ventured into developing new technology for underground hard rock excavation. This includes variety of configurations for full and
Jun 13, 2021
-
Second Narrows Water Supply Tunnel—Final Design, Procurement and Construction - RETC2021By Gregg W. Davidson, J. Andrew McGlenn, Frank Huber
The Second Narrows Water Supply Tunnel will ensure system reliability in the event of a major earthquake and increase the Greater Vancouver Water District’s capacity to meet the long-term needs of a g
Jun 13, 2021
-
Application of Surrogate Modeling for SEM Tunneling SimulationBy Christophe Bragard, Marte Gutierrez, Haotian Zheng, Michael Mooney
This paper proposes a framework for applying surrogate-based approaches to evaluate SEM construction, which can both benefit the uncertainty analysis in the design stage and real-time calibration duri
Jun 13, 2021
-
Effect of Muck Transportation System on Overall TBM Performance and Downtimes - RETC2021By J. Rostami, P. P. Nelson, A. Khetwaln
Tunnel boring machines (TBMs) can be considered as the method of choice for tunneling in many projects due to the high level of efficiency and high potential productivity, safety, and applicability in
Jun 13, 2021
-
Design of Precast Segmental Tunnel Lining in a Design‑Build Environment - RETC2021By David Mast, Irwan Halim, Seung Han Kim
Nowadays more infrastructure tunnel projects are procured using design-build method. In this environment, the Owner’s engineer would typically provide performance requirements for the design-builder,
Jun 13, 2021
-
Tunnel Lining Design in Active Fault Zone: Case Histories and Innovations - RETC 2021By Peter Chou, Pooyan Asadollahi, Danny Lin
To maintain flexibility and ductility of tunnels crossing active faults, various mitigation measures are being utilized depending on fault offset movements and seismic design criteria. Examples of tho
Jun 13, 2021
-
Unreinforced Slurry Walls as Temporary Support of Excavation for Shafts - RETC2021By Arash Dahi Taleghani, Pooyan Asadollahi
Slurry walls, also known as diaphragm walls, are commonly used as temporary and/ or permanent support of excavation for construction of shafts in soft ground. Through case history, this paper demonstr
Jun 13, 2021
-
Pre-Excavation and Early Work Activities for the Long Baseline Neutrino Facility Far Site - RETC2021By Josh Willhite, Seth Pollak, Ben Seling
The Long Baseline Neutrino Facility Far Site at the Sanford Underground Research Facility in Lead, South Dakota will house four large detector tanks located in deep underground caverns. Construction o
Jun 13, 2021
-
Performance of Tunnel Segments Reinforced with Synthetic Macro Fibers - RETC2021By Todd Clarke, Ralf Winterberg
For more than a decade the tunneling industry has explored the potential and benefits of macro synthetic fiber (MSF) reinforced concrete solutions for precast tunnel segments. Parallel to industry inv
Jun 13, 2021
-
TBM Data and Performance Monitoring on Large Diameter TBM Tunnels Lined with Shotcrete in the Himalayas—A Case Study - RETC2021By Gary Peach, Peter Mason
Planning and estimating progress rates and costs for tunnelling is always best done based on experience and historic precedent. Much precedent is available but the use of data monitoring, data mining
Jun 13, 2021
-
Verification and Update on High Pressure Concrete Plug Leakage Remediation - RETC2021By Seung Han Kim, Andrew Yu, Carlos Jaramillo, Chu-Chieh Jay Lin
The Penstock Access Tunnel (PAT) concrete plug is a reinforced concrete plug separating the pressure tunnels from the personnel accessible tunnels and has leaked since the first filling at the Helms P
Jun 13, 2021
-
Construction of an Outfall Tunnel Underneath Rio De La Plata - RETC2021By Mirko Martini, Marcelo Benaglia, Andrea Codalli
Riachuelo Lot 3 forms part of a sanitation programme being implemented in Argentina to relieve the Riachuelo river basin from its current contamination. The programme, by far the most important in its
Jun 13, 2021
-
Kramer Tunnel—Challenging NATM Tunnelling in Germany’s Alps - RETC2021By Roland Arnold, Richard Gradnik, Martin Zeindl
This paper presents the details of the Kramer tunnel project in the Federal State of Bavaria, Germany. This road tunnel, which has been under construction since December 2019, is the key component of
Jun 13, 2021
-
Potential Pathways forMining Operations to Transition to Renewable Energy—a Case Study - Mining, Metallurgy & Exploration (2021)By Oliver W. Marsden, John O. Marsden