Search Documents

Sort by

  • SAIMM
    Engineering Considerations In The Tolerability Of Risk - Mine And Occupational Health And Safety 2010 ? 1 Risk

    By Noel C. Joughin

    In making judgements on tolerable levels of risk in industry, and in all spheres of life, it needs to be understood that every action gives rise to risk. Without risk, nothing can be done. Without ris

    Jan 1, 2011

  • ISEE
    Engineering Control and Information Management of Blasting Programs in Construction and Quarrying Operations

    By Frank Sames, Brad Terhune

    In many construction projects and in most quarrying operations drilling and blasting remains the only feasible method of loosening rock in the removal of rock or overburden, the development of the qua

    Jan 1, 2004

  • CIM
    Engineering design for a ferric chloride leaching plant to leach complex base metal sulphides

    By R. A. May, P. J. Brooks, W. M. Smith

    "Neill and Gunter Limited (NGL) has prepared a preliminary design and a cost estimate for a ferric chloride leach plant to recover copper, lead, zinc, and silver from a typical complex sulphide ore. T

    Jan 1, 1997

  • AIME
    Engineering Design For The Recovery Of Precious Metals From Heap Leach Solutions

    By Roger M. Nendick

    The recovery of precious metals from heap leach solutions can be accomplished by two processes: 1. The Carbon Adsorption Process 2. The Merrill-Crowe Zinc Precipitation Process A brief rev

    Jan 1, 1984

  • SME
    Engineering Design Of The Mercur Gold Project Ore Processing Facility

    By Thomas W. Turk

    The water treatment industry has historically been involved with reducing or inhibiting the inherant scale forming or fouling tendencies of natural waters associated with large industrial cooling wate

    Jan 1, 1983

  • AIME
    Engineering Design Of The Mercur Gold Project Ore Processing Facility (Mining Engineering)

    By T. W. Turk, S. A. Sass

    The engineering design features of the Mercur Gold Project crushing, grinding, carbon-in-leach, bullion, reagent, and tailings disposal areas will be discussed in this paper. It presents a project ove

    Jan 1, 1985

  • SME
    Engineering Development Of Selective Agglomeration Technology

    By B. Y. Wong

    In April 1989, Southern Company Services signed a 3.5 year contract with DOE-PETC for generic engineering development of an advanced physical fine coal cleaning technology known as selective agglomera

    Jan 1, 1991

  • SAIMM
    Engineering diagnostic features of a vibrating sieving screen’s advanced monitoring system in a mineral processing plant APCOM 2021

    By N. Duda, W. Koperska, S. Anufriiev, P. Stefaniak

    In mineral processing plants ore extracted from mines is processed to obtain a concentrate with the highest possible concentration of this valuable product. It is a complicated multi-stage process. U

    Sep 1, 2021

  • AUSIMM
    Engineering Disciplines and Professional Negligence - An Insurer Perspective

    By Greg Brown

    The underwriting of professional negligence has proved to be an evolving science. As with most insurance products coverage offered in the past was very broad but as legal precedent demonstrated to

    Jan 1, 1995

  • AIME
    Engineering Education - Graduate Courses in Petroleum Engineering (Discussion)

    L. C. UREn,* BerkelEy, Cal. (written discussion).—I heartily concur with Rlr. .Fobs concerning the need for advanced courses on various phases of Petroleum Engineering. I think that his criticism is p

    Jan 1, 1928

  • AIME
    Engineering Education - Handling Engineering Graduates (Discussion)

    J. M. Wadsworth,' Okmulgee, Okla. (written discussion).—It seems to me that thc young man must first be absolutely sure that the work he has taken up is to his liking and then I would advise that

    Jan 1, 1928

  • AIME
    Engineering Enrollment Drops

    By W. B. Plank

    THE figures on enrollment in the engineering schools of the United States and Canada indicate that the total number of students in these schools for the current year, 1949-50, is about 10% less than i

    Jan 1, 1950

  • SME
    Engineering Evaluation Of Coal Refuse Slurry Impoundments

    By Robert L. Zook

    Coal refuse slurry impoundments are dams constructed of coarse coal refuse to impound fine refuse (slurry) and water (25-30% solids). Both products are waste from coal preparation plants. A number of

    Jan 1, 1974

  • CIM
    Engineering Excellence into Large Diameter Drill and Blast Shaft Sinking Stages and Galloways for Safety and Productivity

    By T. E. Wakefield

    "Final Galloway (stage) designs for vertical drill and blast shaft sinking projects evolve from complex thought patterns which integrate operational processes, systems and methods of communication, po

    Jan 1, 2019

  • ISEE
    Engineering Field Controls and Hole Deviation

    By Mick Fritz, Tom Treleaven

    The success of any blast is dependent on the accuracy of the blast design and field controls placed at the shot location. The procedure by which the data is collected and analyzed is paramount to acco

    Jan 1, 1998

  • SME
    Engineering Geological And Geotechnical Aspects Of Surface Coal Mining ? Introduction

    By Brian Stimpson

    A recent study by the National Academy of Engineering concluded that if the U.S. Coal Industry is to double production by 1985 it must open 30 new 2,000,000 tons per year surface mines in the eastern

    Jan 1, 1976

  • SME
    Engineering Geology and Cavern Design for New York City

    By Christopher Snee

    ??care has to be taken that the design is driven by sound geological reasoning and rigorous engineering logic rather than by the very attractive images that appear on the computer screen.??Hoek 1999

    Jan 1, 2008

  • SME
    Engineering Geology Of The Manapouri Power Project, New Zealand

    By B. G. Hicks

    The Manapouri Power Project is located in New Zealand's South Island Fiordland. The project is being constructed for the New Zealand Ministry of Works. Construction began in 1963 and is scheduled

    Jan 1, 1968

  • SME
    Engineering Geology Of The Mica Underground Powerplant

    By Douglas D. Campbell, Alan S. Imrie

    INTRODUCTION Mica Dam is located on the Columbia River just downstream of the "big bend" of the Columbia, where it leaves the Rocky Mountain Trench and begins to flow southwards, approximately 85 m

    Jan 1, 1976

  • IOM3
    Engineering geomorphological mapping and opencast mining in unstable mountains - a case study

    By G. J. Hearn

    between particles in the classifying region is then

    Apr 1, 1995